AUDI workshop procedures
11,030 procedures, 1,918 of them carrying torque figures. Page 29 of 111.
- 6-cylinder TDI engine (3.0 ltr. 4-valve common rail - generation II), mechanics — Securing engine to engine and gearbox support · 1 torque figures · 14 steps
- 6-speed manual gearbox 01E/0A1, front-wheel drive — Dismantling and assembling pinion shaft · 24 steps
- 8-cylinder TDI engine (4.2 ltr. 4-valve common rail), mechanics — Securing engine to engine and gearbox support · 1 torque figures · 14 steps
- Adjusting 2nd and 4th gear brake "“B2”" on gearboxes with corrugated washer on last outer plate · 1 torque figures · 14 steps
- Adjusting rear door window – Audi A6/A7 C7 · 1 torque figures · 14 steps
- Adjusting the brake shoes for the handbrake and the rear handbrake cables, LT 28/35 · 1 torque figures · 14 steps
- Adjusting the brake shoes for the handbrake and the rear handbrake cables, LT 46 · 1 torque figures · 14 steps
- Adjusting vacuum unit for turbine changeover – Audi A6/A7 C7 · 24 steps
- Adjusting vacuum unit for turbine changeover - vehicles with engine codes CGQB, CVUB, CVUC, DEHA · 24 steps
- Assembly overview - sealing flange, belt pulley end · 2 torque figures · 4 steps
- Automatic gearbox 01L, four-wheel drive — Exploded view - front final drive · 2 torque figures · 4 steps
- Automatic gearbox 01L, four-wheel drive — Exploded view - transfer box · 2 torque figures · 4 steps
- Automatic gearbox 09E, four-wheel drive — Removing and installing ATF cooler · 1 torque figures · 14 steps
- Bleeding fuel system – Audi A4 Cabriolet B6/B7 / A4 B6/B7 · 24 steps
- Calibrating reversing camera R189 · 24 steps
- Checking brake light switch and brake pedal switch – Audi · 24 steps
- Checking cooling output - vehicles with automatically controlled air conditioner (without high-voltage system) · 24 steps
- Checking delivery pressure and tandem pump for leaks - engine codes BJB, BLS, BSU · 24 steps
- Checking delivery pressure of power steering pump (vehicles with 12-cylinder engine) · 24 steps
- Checking delivery pressure of power steering pump (vehicles with 6-cylinder 2.4 ltr., 2.8 ltr., 3.2 ltr. petrol and 3.0 ltr. TFSI engine) · 24 steps
- Checking delivery pressure of power steering pump (vehicles with 6-cylinder engine) · 24 steps
- Checking delivery pressure of power steering pump (vehicles with 8-cylinder FSI petrol engine) · 24 steps
- Checking delivery pressure of power steering pump (vehicles with 8-cylinder engine) · 24 steps
- Checking fuel low-pressure ahead of fuel filter · 24 steps
- Checking heating output, vehicles with air conditioner – Audi · 24 steps
- Checking hydraulic valve compensation elements – Audi A6 C6 · 24 steps
- Checking knock control limit – Audi A6 C5 · 1 torque figures · 14 steps
- Checking lambda probe and lambda control after catalytic converter (on vehicles which conform to emission standard EU III)
- Checking operation of air quality sensor G238 – Audi A8 D4 · 24 steps
- Checking return flow rate of injectors with engine running · 24 steps
- Checking vacuum hoses to non-return valve, solenoid valve N75, changeover valve N345 and vacuum reservoir · 24 steps
- Checking voltage supply and current consumption of fuel system pressurisation pump G6, engine codes CFHC, CFHE, CFHF, CLCA, CLCB, CFJA · 24 steps
- Checking voltage supply and current consumption of fuel system pressurisation pump G6, engine codes CFHC, CFHF, CLCA · 24 steps
- Cleaning evaporator with ultrasonic A/C cleanerVAS 6189A · 24 steps
- Converting attachment points for roof carrier · 1 torque figures · 14 steps
- Disconnecting and connecting second battery A1 · 2 torque figures · 4 steps
- Emptying fuel tank, front-wheel drive, engine codes CAYD, CAYE, CFHC, CFHF, CLCA, CUUB, CUUC, CUUD, CUUE, CUUF · 24 steps
- Exploded view - oil pump and sump (bottom section) · 2 torque figures · 4 steps
- Installing cover for gearbox housing and 5th gear · 24 steps
- Installing gearbox on vehicles with 3.0 ltr. TDI engine – Audi · 24 steps
- Installing gearbox, Audi S1 – Audi A1 · 24 steps
- Installing pipes and hoses, rear (vehicles with 10-cylinder petrol engine) · 24 steps
- Measuring return flow rate of injectors with engine running · 24 steps
- Poly V-belt drive for alternator - exploded view · 2 torque figures · 4 steps
- Re-determining shim "“S"4” when renewing bearing housing · 1 torque figures · 14 steps
- Removing and installing ABS control unit J104/ABS hydraulic unit N55, Audi S1 · 24 steps
- Removing and installing ABS control unit J104/ABS hydraulic unit N55, vehicles with petrol engine · 24 steps
- Removing and installing Lambda probes (before catalytic converter) · 24 steps
- Removing and installing air conditioner compressor (electrically driven) - vehicles with 4-cyl. engine · 24 steps
- Removing and installing air conditioner high-pressure sender G65 · 2 torque figures · 4 steps
- Removing and installing air mass meter (right-side) – Audi ASE · 24 steps
- Removing and installing airbag unit on front passenger side, Transporter to 2010 · 1 torque figures · 14 steps
- Removing and installing alternator - Audi RS 5 – Audi A5 · 24 steps
- Removing and installing alternator - vehicles with 2.0 ltr. TDI engine (PR number TL4) · 24 steps
- Removing and installing alternator, 1.9 l diesel engine, unit injector (TDI) · 24 steps
- Removing and installing alternator, vehicles with 5-cylinder diesel engine · 1 torque figures · 14 steps
- Removing and installing backrest adjustment actuator unit · 24 steps
- Removing and installing balancer shaft module · 24 steps
- Removing and installing ball joints – Audi TT Mk1 · 24 steps
- Removing and installing belt height adjuster (front) – Audi Q7 · 1 torque figures · 14 steps
- Removing and installing belt pulley on alternator, driven by elastic drive coupling · 1 torque figures · 14 steps
- Removing and installing boot - hydraulic power steering rack · 24 steps
- Removing and installing bottom part of sump – Audi 3.3 TDI AKF · 1 torque figures · 14 steps
- Removing and installing bracket for high-pressure pump · 1 torque figures · 14 steps
- Removing and installing brake caliper, floating caliper disc brake FN3 · 24 steps
- Removing and installing brake fluid reservoir, vehicles with high-voltage system · 24 steps
- Removing and installing brake pads (1KT) – Audi A1 · 24 steps
- Removing and installing brake pads, steel version brakes (1LL / 1LJ / 1LP) · 24 steps
- Removing and installing catalytic converter (right-side) · 24 steps
- Removing and installing catalytic converter (right-side) - vehicles with dual clutch gearbox · 24 steps
- Removing and installing catalytic converter (right-side) - vehicles with dual clutch gearbox 0B5 · 24 steps
- Removing and installing catalytic converter - engine codes CUKB, CXUA · 24 steps
- Removing and installing clutch pedal mounting bracket · 24 steps
- Removing and installing clutch slave cylinder on vehicles with 8-cylinder engine · 24 steps
- Removing and installing condenser (vehicles with 5-cyl. engine) · 24 steps
- Removing and installing condenser, vehicles with 5-cyl. engine · 24 steps
- Removing and installing connection for external audio sources R199 AMI (MMI) · 1 torque figures · 14 steps
- Removing and installing control motor for left side window defroster flap V409 with potentiometer G318 · 1 torque figures · 14 steps
- Removing and installing convertible top – Audi · 24 steps
- Removing and installing convertible top headliner – Audi · 24 steps
- Removing and installing coolant pipes (left-side) – Audi · 24 steps
- Removing and installing drive chain for balance shaft · 24 steps
- Removing and installing drive shaft, Crafter 4MOTION with Achleitner four-wheel drive · 24 steps
- Removing and installing drive shafts with triple roller joint AAR3300i (with internal splines for gearbox stub shaft) · 24 steps
- Removing and installing driver side curtain airbag igniter N251 and front passenger side curtain airbag igniter N252 · 24 steps
- Removing and installing engine compartment cross member - R8 Spyder with dual-clutch gearbox 0BZ · 24 steps
- Removing and installing engine control unit - engine codes AVB, AVF and AWX · 24 steps
- Removing and installing exterior mirror – Audi Q7 · 1 torque figures · 14 steps
- Removing and installing flange shaft (left-side) – Audi Q7 · 24 steps
- Removing and installing fresh air blower control unit J126 · 1 torque figures · 14 steps
- Removing and installing front coolant pipe · 24 steps
- Removing and installing front exhaust pipe with catalytic converter and front silencer · 24 steps
- Removing and installing front seat backrest (seat with electric adjustment) · 24 steps
- Removing and installing front seat backrest (seat with manual adjustment) · 24 steps
- Removing and installing front swivel seat · 24 steps
- Removing and installing fuel tank, engine codes CJKA, CJKB · 24 steps
- Removing and installing gas strut for rear lid – Audi A3 · 2 torque figures · 4 steps
- Removing and installing gear selector position P switch F305 (vehicles up to 11.2005) · 24 steps
- Removing and installing gear selector position P switch F305 on vehicles up to 11.2005 · 24 steps
- Removing and installing gearbox mounting - engine codes CUKB, CXUA · 24 steps
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →