TorqFix

Removing and installing balancer shaft module: VW Transporter T6 (7E) / Transporter T6 (7F) (CJKA, CJKB)

Removing and installing balancer shaft module — VW Transporter T6 (7E) / Transporter T6 (7F)… Read available instructions and vehicle application notes.

24 steps 2 engine codes Showing one source document; this title group contains 2 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: VW Transporter T6 (7E), VW Transporter T6 (7F)

Don't miss

  • Timing chain links with coloured markings must be positioned at markings on chain sprockets.
  • Fit timing chain. The timing chain links with coloured markings must be positioned at the markings on the chain sprockets.

🔧 Engine codes recorded for this source

This source is from the Volkswagen commercial-vehicle documentation. The previous catalogue make label was incorrect; confirm the source vehicle and engine before use.

📋 Procedure

  1. Remove timing chain cover (top) (see the separate procedure).
  2. Remove any noise insulation General body repairs, exterior 66. Exterior equipment; Noise insulation.
  3. Remove lower timing chain cover (see the separate procedure).
  4. Remove camshaft timing chain (see the separate procedure).
  5. Remove guide rail for camshaft timing chain (1).
  6. Remove chain tensioner for camshaft timing chain (3).
  7. Remove chain tensioner for balance shaft timing chain (1).
  8. Remove tensioning rail (2).
  9. Remove guide rail (3).
  10. Remove guide rail (4).
  11. Remove timing chain.
  1. Turn intermediate shaft sprocket/balance shaft to markings (arrows). [Note: Timing chain links with coloured markings must be positioned at markings on chain sprockets.]
  1. Fit timing chain. The timing chain links with coloured markings must be positioned at the markings on the chain sprockets.
  2. Fit guide rail for timing chain and tighten bolts (4).
  3. Fit guide rail for timing chain and tighten bolts (3).
  4. Fit tensioning rail for timing chain and tighten bolt (2).
  5. Insert chain tensioner of timing chain (1) with locking fluid Electronic Parts Catalogue.
  6. Check adjustment again.
  7. Install camshaft timing chain (see the separate procedure).
  8. Install timing chain cover (bottom) (see the separate procedure).
  9. Install timing chain cover (top) (see the separate procedure).
  10. Install tensioner for poly V-belt (see the separate procedure).
  11. Install poly V-belt (see the separate procedure).
  12. Install any noise insulation General body repairs, exterior 66. Exterior equipment; Noise insulation.

📐 4 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 4 workshop diagrams for this job Ask about your VW CJKA — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.