Installing pipes and hoses, rear (vehicles with 10-cylinder petrol engine) — AUDI
Installing pipes and hoses, rear (vehicles with 10-cylinder petrol engine) on Audi: 24 steps. What to remove, in what order, and what to check after.
Workshop procedure for AUDI — the exact step sequence and torque figures, straight from real workshop data.
🧭 Before you start
Fits: platform code 42
Don't miss
- Note correct positions of pipes (1) and (2) when connecting pipe union. Markings (arrow A) and (arrow B) must be in line.
- Marking (P) on suction hose (2) must be aligned with seam on pump (1)(arrows).
- Markings (2) on hoses must be vertically in line with webs (1) on reservoir.
- Check that pipes do not contact any other components when securing bolts are tightened.
📋 Procedure
- Secure suction hose (3) to gearbox (left-side) (1) with retainer (2) and nut (4).
- Secure bracket (2) to body with bolts (1).
- Secure reservoir in bracket (2) with bolt (3). Note correct position of reservoir in bracket .
- Secure bracket (4) to body with bolts (3).
- Secure reservoir in bracket (4) with bolt (1). Note correct position of reservoir in bracket .
- Secure retainer (1) to body with bolts (2).
- Secure return line (rear section) (3) to retainer (1) with clamp (5) and nut (4).
- Secure retainer (7) to body (8) with bolts (9).
- Fit return line (rear section) (3) with clip (6) in retainer (7).
- Secure engine oil line (2) to retainer for return line (rear section) (1) with clamp (3) and nut (4).
- Secure pressure line (centre section) (1) with clip (2) to stud (3).
- Secure pressure line (centre section) (1) to body (4) with retainer (5) and bolt (6).
- Secure retainer (2) to body with bolt (8) and nut (1).
- Fit return line (5) and pressure line (6) in mounting (3).
- Secure mounting (3) to retainer (2) with bracket (4) and nut (7).
- Secure pressure line (rear section) (1) to body with clamp (2) and bolt (3).
- Note correct positions of pipes (1) and (2) when connecting pipe union. Markings (arrow A) and (arrow B) must be in line.
- Marking (P) on suction hose (2) must be aligned with seam on pump (1)(arrows).
- Install reservoir in securing strap as illustrated.
- Markings (2) on hoses must be vertically in line with webs (1) on reservoir.
- Secure pressure pipe (1) and return pipe (2) on power steering rack as shown in illustration.
- Check that pipes do not contact any other components when securing bolts are tightened.
- Connect pressure pipe (1) with new banjo bolt (2) and new seals.
- Connect return pipe (4) with new banjo bolt (3) and new seals.
Other AUDI procedures
- Removing and installing toothed belt – Audi · 56 torque figures
- Removing engine – Audi A8 D3 · 41 torque figures
- Removing camshaft timing chain from camshafts – Audi A6/A7 C7 · 38 torque figures
- Installing engine – Audi A8 D4 · 36 torque figures
- Removing and installing camshaft timing chain · 29 torque figures
- Installing gearbox - vehicles with 8-cylinder MPI engine
- Removing and installing power steering pump (vehicles with 8-cylinder diesel engine)
- Checking Lambda probes and Lambda control after catalytic converter - vehicles with engine code letters "“ARE”", "“AZA”" and "“BES”"
- Adjusting input shaft - gearboxes to approx. 04.2003 – Audi · 2 torque figures
- Removing and installing curtain airbag on saloon (from week 36.02 onwards) · 1 torque figures
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
The figures on this page come from manufacturer workshop documentation and are shown as they are. The page is assembled automatically from that data — it is not written by an AI. The AI works in the chat, where it answers for your specific car. It writes nothing here.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix →Workshop data on this page last updated 20 Sep 2026.