TorqFix

Installing pipes and hoses, centre (vehicles with 10-cylinder petrol engine): Audi

Installing pipes and hoses, centre (vehicles with 10-cylinder petrol engine) — Audi. 12 source steps. Check the document conditions against your vehicle.

12 steps

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Don't miss

  • Check that pipes do not contact any other components when securing bolts are tightened.
  • Note correct positions of pipes (1) and (2) when connecting pipe union. Markings (arrow A) and (arrow B) must be in line.
  • Secure hose (1) of return line (power steering rack/hydraulic fluid cooler) to hydraulic fluid cooler so that marking (arrow A) on hose is vertically in line with marking (arrow B) on hydraulic fluid cooler.
  • Secure hose (2) of return line (hydraulic fluid cooler/reservoir) to hydraulic fluid cooler so that marking (arrow D) on hose is vertically in line with marking (arrow C) on hydraulic fluid cooler.
  • Markings (2) on hoses must be vertically in line with webs (1) on reservoir.

📋 Procedure

  1. Secure retainer (2) to body with bolt (8) and nut (1).
  2. Fit return line (5) and pressure line (6) in mounting (3).
  3. Secure mounting (3) to retainer (2) with bracket (4) and nut (7).
  1. Secure return line to body with clamp (2) and bolt (1).
  1. Secure pressure pipe (1) and return pipe (2) on power steering rack as shown in illustration.
  2. Check that pipes do not contact any other components when securing bolts are tightened.
  1. Connect pressure pipe (1) with new banjo bolt (2) and new seals.
  2. Connect return pipe (4) with new banjo bolt (3) and new seals.
  1. Note correct positions of pipes (1) and (2) when connecting pipe union. Markings (arrow A) and (arrow B) must be in line.
  1. Secure hose (1) of return line (power steering rack/hydraulic fluid cooler) to hydraulic fluid cooler so that marking (arrow A) on hose is vertically in line with marking (arrow B) on hydraulic fluid cooler.
  2. Secure hose (2) of return line (hydraulic fluid cooler/reservoir) to hydraulic fluid cooler so that marking (arrow D) on hose is vertically in line with marking (arrow C) on hydraulic fluid cooler.
  1. Markings (2) on hoses must be vertically in line with webs (1) on reservoir.

📐 6 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 6 workshop diagrams for this job Ask about your Audi — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.