AUDI workshop procedures
11,030 procedures, 1,918 of them carrying torque figures. Page 5 of 111.
- Removing gearbox on vehicles with 4-cylinder petrol engine · 2 torque figures · 42 steps
- Renewing camshaft oil seals – Audi A6 C6 · 2 torque figures · 42 steps
- Separating engine and gearbox - manual gearbox · 3 torque figures · 32 steps
- Separating engine and gearbox - vehicles with automatic gearbox · 3 torque figures · 32 steps
- Servicing suspension strut · 2 torque figures · 42 steps
- 6-speed manual gearbox and automated manual gearbox (R tronic) 086 — Removing gearbox · 1 torque figures · 51 steps
- Checking and adjusting static commencement of injection of injection pump · 4 torque figures · 21 steps
- Removing and installing coil spring – Audi A6 C6 · 1 torque figures · 51 steps
- Removing and installing expansion valve (front) – Audi Q7 · 4 torque figures · 21 steps
- Removing and installing fuel tank shut-off valve, solenoid valve with securing nut · 2 torque figures · 41 steps
- Removing and installing multifunction switch F125 · 2 torque figures · 41 steps
- 10-cylinder direct petrol injection engine (5.2 ltr. 4-valve), mechanics — Installing engine · 1 torque figures · 50 steps
- 3.0 TFSi_CMUA_Timing Chain · 216 steps
- 3.2 FSi chain AUK · 173 steps
- 3.2 FSi chain AUK COPY · 175 steps
- 4-cylinder TDI unit injector engine (2.0 ltr. 4-valve), mechanics — Removing engine · 108 steps
- 4-cylinder engine (1.8 ltr. 5-valve turbo), mechanics — Removing engine - engine codes AEB, AJL · 102 steps
- 4-cylinder engine (1.8 ltr. 5-valve turbo), mechanics — Removing engine - engine codes ANB, APU, ARK, ATW · 101 steps
- 4-cylinder engine (5-valve turbo), mechanics — Removing engine · 99 steps
- 5-speed manual gearbox 02T — Removing and installing gearbox · 110 steps
- 5-speed manual gearbox 085 DS — Installing gearbox · 3 torque figures · 30 steps
- 5-speed manual gearbox 085 DS — Removing gearbox · 70 steps
- 5/6-speed manual gearbox 02M/02Y, four-wheel drive — Removing gearbox · 78 steps
- 6-cylinder engine (2.7 ltr. 5-valve turbo), mechanics — Removing engine · 130 steps
- A3_1.6_BLF/BLP Timing chain · 134 steps
- A4_1.8 TFSi (CJEB)/2.0 TFSi (CNCD) Timing chain · 167 steps
- A4_8K/A5_8T 2.0 TDI CR_GenII Timing belt · 128 steps
- A4_8K/A5_8T_1.8 TFSi_Generation II_Timing Chain · 168 steps
- A4_8K/A5_8T_2.0 TFSi_Generation II Timing Chain · 168 steps
- A4_8K/A5_8T_2.0TDI CR_GenI Timing belt · 127 steps
- Assembling planetary gearbox · 60 steps
- Assembly order, gearbox »without« circlip (A) for input shaft cover made from sheet metal · 77 steps
- Assembly order: I = gearbox »with« circlip (A) for input shaft cover made from sheet metal; II = gearbox with input shaft cover made from plastic · 74 steps
- Assembly sequence - gearbox with circlip for input shaft sealing cap · 71 steps
- Assembly sequence - gearbox without circlip for input shaft sealing cap · 72 steps
- Audi 1.4 TDI Injector R&I · 100 steps
- Audi 1.9 TDI / 2.0 8V Injector R&I · 106 steps
- Audi 2.0 16V TDI Injector R&I · 129 steps
- Automatic gearbox 01L, four-wheel drive — Removing and installing gearbox - vehicles with 8-cylinder petrol engine · 94 steps
- Automatic gearbox 01M — Removing and installing gearbox · 76 steps
- Automatic gearbox 097 — Removing and installing gearbox · 88 steps
- Automatic gearbox 09G — Removing and installing gearbox · 80 steps
- Checking actuation and electrical connections of auxiliary heater
- Checking cooling system for leaks - vehicles with high-voltage system · 84 steps
- Checking delivery pressure of fuel system pressurisation pump G6 - vehicles with 6.0 bar low pressure fuel system · 73 steps
- Checking wiring and components with test box V.A.G 1598
- Dismantling and assembling clutch "“D/G”" with freewheel · 85 steps
- Dismantling and assembling clutch "„D/E"" – Audi A6 C5 / A8 D2 · 78 steps
- Dismantling and assembling gearbox (from gearbox manufacturing date 21 01 8 onwards) · 76 steps
- Dismantling and assembling gearbox (up to gearbox manufacturing date 20 01 8) · 74 steps
- Dismantling and assembling gearbox (version without circlip (A) for input shaft sealing cap) · 60 steps
- Dismantling and assembling gearbox - assembly sequence · 95 steps
- Dismantling and assembling gearbox housing, selector mechanism, input shaft, output shaft (pinion shaft), differential and selector forks · 92 steps
- Dismantling and assembling gearbox housing, selector mechanism, input shaft, output shafts (pinion shafts), differential, bevel box and selector rods - gearboxes from approx. 04.2003 · 61 steps
- Exploded view - oil pan, mechatronic unit and gear oil pump · 5 torque figures · 10 steps
- Exploded view - oil pan, mechatronic unit, gear oil pump · 5 torque figures · 10 steps
- Fault-finding on power transmission - complaints regarding defects on the clutch and clutch mechanism · 82 steps
- Installing gearbox, vehicles with all-wheel drive · 69 steps
- Installing gearbox, vehicles with front-wheel drive · 63 steps
- Installing sump (top section) - engines with moulded gasket · 4 torque figures · 20 steps
- Audi Q5_3.0 TDI_CCWA, CCWB timing chain replacement · 208 steps
- Removing - vehicles with engine code letters AHL, ARM · 104 steps
- Removing - vehicles with engine code letters ANA – Audi 1.6 · 97 steps
- Removing and installing ABS control unit J104/ABS hydraulic unit N55, Audi A1 quattro · 60 steps
- Removing and installing ATF lines - vehicles with 8-cyl. engine · 63 steps
- Removing and installing ATF supply unit – Audi A8 D3 / A6 C6 · 88 steps
- Removing and installing air supply unit (vehicles with 6-cylinder and 8-cylinder diesel engines, 10-cylinder and 12-cylinder petrol engines) · 65 steps
- Removing and installing camshaft (1.8 ltr. engine) · 74 steps
- Removing and installing camshaft (2.0 ltr. engine) · 86 steps
- Removing and installing camshaft - vehicles with engine codes CJSA, CJSB (from 01.07.2013 onwards), CJXB, CJXC, CJXF, CYFB · 88 steps
- Removing and installing camshaft - vehicles with engine codes CJSA, CJSB (up to 01.07.2013) · 83 steps
- Removing and installing camshaft - vehicles with engine codes CNSB, CNTC, CHHB · 82 steps
- Removing and installing camshaft adjuster – Audi · 1 torque figures · 50 steps
- Removing and installing camshaft timing chain - vehicles with engine codes CJSA, CJSB, CJXB, CJXC, CJXF, CYFB · 66 steps
- Removing and installing camshaft timing chain - vehicles with engine codes CNSB, CNTC, CHHB · 65 steps
- Removing and installing camshaft timing chain, 29-04-2013► · 63 steps
- Removing and installing camshaft with AVS – Audi TT Mk2 · 91 steps
- Removing and installing camshaft without AVS – Audi TT Mk2 · 83 steps
- Removing and installing camshafts - vehicles with engine code letters CASA, CASB · 63 steps
- Removing and installing camshafts, engine codes BYT, BPU · 82 steps
- Removing and installing camshafts, engine codes BZB, CAWB, CBFA, CCTA, CDAA, CCZA · 81 steps
- Removing and installing centre console with extension – Audi · 62 steps
- Removing and installing chain and pulley set "“I”" · 73 steps
- Removing and installing cover for gearbox housing, clutch housing, selector shaft with selector cover, input shaft, output shaft (pinion shaft), differential and selector mechanism · 75 steps
- Removing and installing cylinder head (1.8 ltr. engine) · 97 steps
- Removing and installing cylinder head (2.0 ltr. engine with assembly clearance feature) · 111 steps
- Removing and installing cylinder head cover – Audi TT Mk1 · 79 steps
- Removing and installing cylinder head cover with camshaft · 77 steps
- Removing and installing cylinder head without AVS – Audi · 120 steps
- Removing and installing cylinder head, engine codes BYT, BPU · 123 steps
- Removing and installing cylinder head, engine codes BZB, CAWB, CBFA, CCTA, CDAA, CCZA · 126 steps
- Removing and installing dash panel – Audi A6 C6 · 129 steps
- Removing and installing exhaust manifold – Audi TT Mk1 · 71 steps
- Removing and installing exhaust manifold (right-side) with intermediate pipe · 2 torque figures · 40 steps
- Removing and installing front final drive – Audi Q7 · 62 steps
- Removing and installing front roof reinforcement · 88 steps
- Removing and installing fuel tank chamber (left-side) with attached components · 74 steps
- Removing and installing fuel tank chamber (right-side) with attached components · 87 steps
- Removing and installing fuel tank, vehicles with 3.0 ltr. (V6) engine and reducing agent metering system · 61 steps
- Removing and installing fuel tank, vehicles with 3.0 ltr. (V6) or 4.2 ltr. (V8) engine · 69 steps
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →