Removing and installing cylinder head without AVS: Audi TT Mk2 (8J)
Removing and installing cylinder head without AVS — Audi TT Mk2 (8J). 120 source steps. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi TT Mk2 (8J, 2006–2014)
- Opens: coolant, fuel
- Timing references: follow the source instructions for shaft position, timing marks and any locking tools
- Special tools named: T10070
Don't miss
- Disregard item (3).
- Disregard items marked (1 and 3).
- Disregard items marked (2, 3, 4 and arrow).
- For illustration purposes, the installation position is shown with the engine removed.
- Pay attention to earth wire (arrow) when installing.
📋 Procedure
- Remove engine cover panel (arrows).
- Unscrew bolts (arrows) and remove air duct.
- Detach air duct at bottom together with air hose.
- Unplug electrical connector (1) from air mass meter G70.
- Detach air intake hose (2).
- Unscrew bolt (4) and remove air cleaner housing. [Note: Disregard item (3).]
- Loosen hose clip (2).
- Remove bolt (4).
- Unplug electrical connector (arrow) and move electrical wire clear. [Note: Disregard items marked (1 and 3).]
- ⚠ Hot steam/hot coolant can escape - risk of scalding. The cooling system is under pressure when the engine is hot. To allow pressure to dissipate, cover filler cap on coolant expansion tank with cloth and open carefully. — Open filler cap on coolant expansion tank.
- Remove front exhaust pipe with catalytic converter (see the separate procedure).
- Remove front right wheel.
- Remove noise insulation General body repairs, exterior 66. Noise insulation; Exploded view - noise insulation.
- Remove noise insulation (right-side) (arrows).
- Remove noise insulation frame General body repairs, exterior 50. Lock carrier; Exploded view - lock carrier.
- Remove air pipe (item 1 and 2).
- Drain cooling system.
- Remove bolt (1) and take out air pipe downwards. [Note: Disregard items marked (2, 3, 4 and arrow).]
- Remove bolts (arrows).
- Remove air pipe (lift clips (items 1 and 2)).
- Unplug electrical connectors (1 and 2) and move electrical wire clear (arrows).
- Remove bolts (1 and 2) and detach support for turbocharger.
- Remove banjo bolt (2) and move coolant pipe clear to one side.
- Remove bolts (1) on oil return line.
- Remove bolt (3) on oil supply line. [Note: For illustration purposes, the installation position is shown with the engine removed.]
- Remove bolt (arrow) for air pipe.
- Loosen hose clip (1) and remove air pipe.
- Press release tabs and disconnect air hose (2).
- Disconnect crankcase breather hose (1).
- Remove bolts (arrows) and detach crankcase breather.
- Detach coolant hose (1).
- Remove bolts (2 and 3).
- Disconnect coolant hose (1 and 2).
- Detach electrical connector (4) and move wiring harness clear.
- Detach vacuum hose (5) from vacuum pump and move clear.
- Unscrew bolt (3) and detach coolant pipe. [Note: Pay attention to earth wire (arrow) when installing.] [Note: For illustration purposes, the installation position is shown with the engine removed.]
- Remove heat shield (arrows).
- Remove oil supply line from turbocharger (1).
- Unplug electrical connectors at ignition coils and move wiring harness clear.
- Remove ignition coils using puller T40039.
- Disconnect coolant hoses on rear of cylinder head.
- Unplug electrical connectors (1 ... 4).
- Move electrical wire (5) clear.
- Detach vacuum line (6) leading to activated charcoal filter.
- Unplug electrical connectors (1) and detach connectors from retainer.
- Unplug electrical connectors (2 ... 4).
- Detach vacuum line (5).
- Detach coolant pipe from intake manifold; to do so, unscrew bolts (arrows).
- Remove intake manifold support (remove securing nut (1) and bolt (2)).
- Remove oil filter.
- ⚠ Protect fuel system against contamination. Rules for cleanliness when working on the injection system (see the separate procedure). — Disconnect fuel hose (1).
- Release activated charcoal filter (arrow B), lift off (arrow A) and move clear to one side.
- Disconnect coolant hoses (arrows) and move clear.
- Detach connector from camshaft control valve 1N205(1).
- Unscrew bolts (arrows) and remove camshaft control valve 1N205.
- Unscrew bolts (1 to 5) and remove timing chain cover (top).
- ⚠ The timing valve has a left-hand thread. — Depending on version, turn assembly tool T10352 or assembly tool T10352/1 in direction of (arrow) to remove timing valve.
- Remove bolts (arrows) and detach bearing saddle.
- Turn vibration damper to "“TDC”" position using counterhold tool T10355.
- Use a waterproof pen to mark camshaft timing chain and cylinder head (arrows) relative to markings on chain sprockets (1).
- Use a waterproof pen to mark camshaft timing chain relative to guide rail of timing chain (2) as well.
- Remove sealing plug (arrow).
- Remove bolts (arrows).
- Remove bolt (arrow).
- Screw in assembly lever T40243(arrows).
- Lift locking element for chain tensioner; to do so, insert scriber or suitable screwdriver in hole of chain tensioner in direction of (arrow 1), press assembly lever T40243 slowly in direction of (arrow 2) and hold in place.
- Hold chain tensioner in position with locking pin T40011.
- Screw in assembly lever T40243(arrows).
- Compress circlip (arrow) for chain tensioner, press assembly lever T40243 slowly in direction of (arrow) and hold in place.
- Hold chain tensioner in position with locking tool T40267.
- Remove assembly lever T40243.
- Bolt camshaft clamp T40271/2 onto cylinder head and slide into teeth on chain sprocket in direction of (arrow 2); if necessary, use spanner to turn inlet camshaft in direction of (arrow 1).
- Remove bolt (1) and guide tensioning rail (2) downwards.
- Bolt camshaft clamp T40271/1 onto cylinder head.
- Use spanner to turn exhaust camshaft in direction of (arrow 1) and slide camshaft clamp T40271/1 into teeth on chain sprocket in direction of (arrow 2).
- Use screwdriver to release catch and press off top guide rail (1) forwards.
- Remove camshaft timing chain from camshaft sprockets.
- ⚠ Avoid damage to valves and piston crowns. Do not turn the crankshaft after the camshaft timing chain has been removed from the cylinder head. — Turn sealing plugs (arrows) 90° anti-clockwise (arrow) and remove.
- Unscrew ball heads (1 ... 2).
- Detach filler cap.
- Remove bolts (arrows).
- Use special wrench (Polydrive)T10070 to slacken cylinder head bolts in the sequence (1 ... 5). [Note: Make sure all hoses/pipes and wiring on component are disconnected. Make sure tensioning rail and guide rail are not damaged when lifting off cylinder head.]
- Take off cylinder head.
- Place cylinder head onto soft surface (foam plastic). [Note: Renew the bolts tightened with specified tightening angle. Renew self-locking nuts as well as seals, gaskets and O-rings. When installing an exchange cylinder head, the contact surfaces between the hydraulic compensation elements, roller rocker fingers and cams must be oiled before installing the camshaft housing. Hose connections and air pipes and hoses must be free of oil and grease before assembly. Secure all hose connections with the correct type of hose clips (same as original equipment) Electronic parts catalogue. To ensure that the charge air hoses can be properly secured at their connections, spray rust remover onto the worm thread of used hose clips before installing. After fitting a new cylinder head or cylinder head gasket, change the engine oil and the coolant in the entire cooling system.]
- ⚠ Avoid damage to sealing surfaces. Carefully remove sealant residue from cylinder head and cylinder block. Ensure that no long scores or scratches are made on the surfaces. Avoid damage to cylinder block. No oil or coolant must be allowed to remain in the blind holes for the cylinder head bolts in the cylinder block. Ensure that cylinder head gasket seals properly:Carefully remove any remaining emery and abrasive material. Do not remove new cylinder head gasket from packaging until it is ready to be fitted. Handle the cylinder head gasket very carefully to prevent damage to the silicone coating or the indented area of the gasket. Avoid damage to open valves. When installing an exchange cylinder head, the plastic protectors fitted to protect the open valves should not be removed until the cylinder head is ready to be fitted. Avoid damage to valves and piston crowns after working on valve gear. Turn the engine carefully at least 2 rotations to ensure that none of the valves make contact when the starter is operated. — Mark camshaft chain sprockets relative to camshaft clamp T40271/1 and camshaft clamp T40271/2(arrows).
- Use spanner to turn inlet camshaft in direction of (arrow 1) and slide camshaft clamp T40271/2 out of teeth on chain sprocket in direction of (arrow 2) and move camshaft into rest position.
- Remove camshaft clamp T40271/2.
- Use spanner to turn exhaust camshaft in direction of (arrow 1) and slide camshaft clamp T40271/1 out of teeth on chain sprocket in direction of (arrow 2) and move camshaft into rest position.
- Remove camshaft clamp T40271/1.
- Transfer markings made on old camshafts onto new camshafts.
- Bolt camshaft clamp T40271/2 onto cylinder head.
- Turn inlet camshaft in direction of (arrow 1) until marking (3) aligns with camshaft clamp T40271/2.
- Slide camshaft clamp T40271/2 into teeth of chain sprocket in direction of (arrow 2).
- Bolt camshaft clamp T40271/1 onto cylinder head.
- Turn exhaust camshaft in direction of (arrow 1) until marking (3) aligns with camshaft clamp T40271/1.
- Slide camshaft clamp T40271/1 into teeth of chain sprocket in direction of (arrow 2).
- Place cylinder head gasket in position.
- ⚠ Make sure that components are not damaged by the timing chain when rotating the crankshaft. — If crankshaft has been rotated: set No. 1 cylinder piston to top dead centre and then turn crankshaft back slightly.
- Fit cylinder head.
- Insert and hand-tighten cylinder head bolts.
- Tightening sequence for cylinder head [Note: Cylinder head bolts do not have to be torqued down again later after repair work.]
- Turn vibration damper to "“TDC”" position (arrow) using counterhold tool T10355.
- Fit timing chain; to do so, position markings on chain links (arrows) at markings on chain sprockets (1).
- Install top guide rail (2).
- Turn exhaust camshaft in direction of (arrow 1) and slide camshaft clamp T40271/1 out of teeth on chain sprocket in direction of (arrow 2) and release camshaft.
- Remove camshaft clamp T40271/1.
- Move guide rail (2) upwards and screw in bolt (1).
- Turn inlet camshaft in direction of (arrow 1) and slide camshaft clamp T40271/2 out of teeth on chain sprocket in direction of (arrow 2) and release camshaft.
- Remove camshaft clamp T40271/2.
- Check valve timing; markings on camshaft timing chain and cylinder head (arrows) must align with markings on chain sprockets (1).
- Markings on camshaft timing chain and on guide rail for camshaft timing chain (2) must be opposite one another.
- Notch on vibration damper must align with marking on cover for timing chain (bottom) (3).
- Attach bearing saddle and screw in bolts (arrows) hand-tight.
- Depending on version, remove locking pin T40011 or locking tool T40267.
- Screw in bolt (arrow).
- Tighten bolts (arrows) for bearing saddle.
- Install timing valve.
- Install timing chain cover (top) (see the separate procedure).
- Change engine oil 810.
- Fill cooling system with fresh coolant (see the separate procedure).
Other AUDI procedures
- Exploded view - cylinder head with AVS
- Exploded view - cylinder head without AVS
- Removing and installing cylinder head with AVS – Audi TT Mk2
- Assembly overview - cylinder head
- Cylinder head and cylinder head cover - exploded view
- Cylinder head cover - exploded view
- Removing and installing lower timing chain cover (Passat, CC)
- Exploded view - cylinder head, engine codes BYT, BPU
- Exploded view - cylinder head, engine codes BZB, CAWB, CBFA, CCTA, CDAA, CCZA
- Removing and installing turbocharger, engine codes BZB, CAWB, CBFA, CCTA, CDAA, CCZA
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.