Removing and installing gearbox: vehicles with 8-cylinder petrol engine — Automatic gearbox 01L, four-wheel drive — Audi A8 D2 (4D)

Removing and installing gearbox — vehicles with 8-cylinder petrol engine — Automatic gearbox 01L… Read available instructions and vehicle application notes.

94 steps 2 original source tables

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A8 D2 (4D)

  • Also covered elsewhere: Electronic parts catalogue

Don't miss

  • Radiator fan can be placed to one side with electrical wiring connected.
  • Risk of damageWhen raising or lowering the engine make sure that neither hook (B) nor hook (A) makes contact with the fuel pressure regulator (arrow). — Remove front wheels.
  • Make sure that the insulating material on the bulkhead is not damaged by the throttle valve unit.
  • To loosen the torque converter bolts, counterhold at central bolt of vibration damper.
  • If necessary, mark position of selector lever cable support bracket on gearbox housing for later installation, and unbolt support bracket (arrows).

📋 Procedure

  1. ⚠ Contact corrosion! Notes .On vehicles with telematics: activate service mode of telematics control unit before disconnecting battery Radio, telephone, navigation system, self-diagnosis01. — Refer to coding on vehicles with encoded radio/radio navigation system (RNS); obtain coding if necessary.
  2. Disconnect earth strap on battery (in luggage compartment) with ignition switched off Electrical system27.
  3. Remove engine cover panel (arrows).
  4. Remove air pipe between air cleaner and throttle valve unit (arrows).
  5. Remove air hoses between air cleaner housing and lock carrier.
  6. Remove bolts (arrows) for radiator cowl and radiator fan. [Note: Radiator fan can be placed to one side with electrical wiring connected.]
  1. Unplug electrical connectors for Lambda probes on left (arrow) and right of throttle valve unit.
  2. Remove top nuts for front exhaust pipes on left and right (repair group 26).
  3. Remove engine/gearbox securing bolts which are accessible from above.
  4. Remove covers (1 … 4).
  5. Set up support bracket10 - 222 A with 2x adapters10-222 A /4(item D) and 2 spindles.
  1. Position support bracket10 - 222 A onto bolts on suspension strut mountings and check stability.
  2. Unscrew fuel line from fuel pressure regulator (arrow).
  3. Fit and secure retainer 3180 from gearbox side in engine lifting eye.
  4. Insert hook10 - 222 A /2(item A) in engine lifting eye at fuel pressure regulator.
  5. Partly take up weight of engine via spindles (B) and (C).
  1. ⚠ Risk of damageWhen raising or lowering the engine make sure that neither hook (B) nor hook (A) makes contact with the fuel pressure regulator (arrow). — Remove front wheels.
  2. On vehicles fitted with auxiliary heater, remove screws (arrows) securing exhaust pipe of auxiliary/ additional heater to noise insulation.
  3. Remove noise insulation panel (arrows).
  4. Unbolt bracket for noise insulation (arrows).
  5. Unclip vent hose for alternator.
  6. Unscrew heat shield (arrows) for drive shaft (left and right).
  7. Unbolt drive shafts (left and right) from gearbox flange shafts (repair group 40).
  8. Unbolt heat shield for selector lever cable on left of gearbox.
  9. Remove bottom nuts for front exhaust pipes on left and right (repair group 26).
  10. Remove Lambda probes after catalytic converter (repair group 24).
  11. Unfasten clamps and remove front exhaust pipes with catalytic converters and Lambda probes (repair group 26).
  12. Unbolt heat shield (A) for propshaft (arrows).
  13. Remove bolts from propshaft at transfer box.
  14. Slide propshaft together towards rear final drive. The constant velocity joints can be moved axially.
  15. Tie up or support propshaft.
  16. Remove bottom bolts (arrows) for engine mountings.
  17. Remove bolts (arrows) for torque reaction support (front right).
  18. Raise engine with spindles until engine mountings lift away from subframe. [Note: Make sure that the insulating material on the bulkhead is not damaged by the throttle valve unit.]
  1. Remove bolts (arrows) between top section of sump and gearbox.
  2. Unscrew engine support (right-side) and cable clamps (arrows); put down engine support on subframe.
  3. Remove bolts (arrows) and pull out starter slightly.
  4. Remove nut and detach B+ wire (arrow 1).
  5. Unplug electrical connector (arrow 2) for terminal (repair group 50).
  6. Remove starter.
  7. Unscrew 3 Torx socket head bolts from torque converter through opening for starter (rotate crankshaft 1/3 turn for each bolt). [Note: To loosen the torque converter bolts, counterhold at central bolt of vibration damper.]
  1. Shift selector lever into position "„P“".
  2. Lower engine, insert left engine mounting in subframe and tighten bottom bolts slightly.
  3. Turn locking lever (1) and unplug electrical connector for gearbox wiring harness.
  4. Unplug electrical connector (2) of multi-function switch F125.
  5. Unbolt bracket (3) for connector and guide out connector with bracket from underneath.
  6. Unplug electrical connector (arrow A) at speedometer sender G22.
  7. Unscrew engine speed sender G28(arrow B) (front left) from gearbox.
  8. Unscrew multi-function switch F125 to protect it from damage (arrows) and move wiring harness clear.
  9. Use removal lever80 - 200 to prise selector lever cable (1) off selector shaft lever (2) (remove retaining clip (arrow) if fitted).
  10. If necessary, mark position of selector lever cable support bracket on gearbox housing for later installation, and unbolt support bracket (arrows).
  11. Unbolt retaining clip for ATF lines from engine support (left-side).
  12. Place used oil collection and extraction unit V.A.G 1782 below gearbox. [Note: Rules for cleanliness when working on the automatic gearbox .]
  1. Remove bolt (2).
  2. Pull out ATF lines (A) and (B) and move clear to one side. [Note: (Item 1) can be disregarded.]
  1. Seal pipes and gearbox connections with clean sealing plugs to prevent ATF from escaping.
  2. Set up gearbox support 3282 on engine and gearbox jack 1383 A.
  3. Place adjustment plate VAS 3282/25 on gearbox support 3282 (adjustment plate only fits in one position).
  4. Align arms of gearbox support according to holes in adjustment plate.
  5. Attach support elements as illustrated on adjustment plate.
  6. Place engine and gearbox jack 1383 A with gearbox support 3282 underneath gearbox and support gearbox.
  1. Align adjustment plate parallel to gearbox and secure left support to gearbox with bolt M10 (item A).
  2. Remove gearbox support (arrow) (left-side) together with gearbox mounting.
  3. Remove gearbox support (arrow) (right-side) together with gearbox mounting.
  4. Remove bolts (1) and (2) at rear of subframe. [Note: Do not loosen the two bolts at front of subframe, otherwise wheel alignment must be performed.]
  1. Lower gearbox slightly at the rear.
  2. Support engine at front with commercially available support.
  3. Remove remaining engine/gearbox securing bolts.
  4. Press gearbox off engine and at the same time press torque converter out of drive plate.
  5. Lower rear end of gearbox by adjusting gearbox support 3282 accordingly.
  6. Unplug electrical connector for gearbox output speed sender G195 at transfer box (rear right).
  7. Move electrical wiring clear.
  8. Guide the gearbox out diagonally downwards/to the rear. [Note: If necessary, reduce tension at spindle of support bracket10 - 222 A.Ensure that there is sufficient room between bulkhead and engine.]
  1. Secure torque converter in gearbox using support bridge30 - 211 A to prevent it from falling out. [Note: Clean ATF lines and ATF cooler before installing a replacement gearbox .Renew bolts which are tightened by turning through a specified angle. Renew self-locking nuts and bolts, and seals, O-rings and gaskets. Use new genuine bolts to secure torque converter to drive plate Electronic parts catalogue. After detaching propshaft, it is important to clean out any locking fluid residues from threads in flange shafts on gearbox and in flange for propshaft on rear final drive. Otherwise there is a danger that the new bolts will seize when they are screwed in and then shear off the next time they are removed. The threads can be cleaned with a thread tap. Secure all hose connections with the correct hose clips (as original equipment); refer to Electronic parts catalogue. All cable ties which are released or cut open during removal must be fitted in the same position when installing.]
  1. Before installing gearbox, tie electrical wiring off to one side so that it cannot be trapped between the engine and the gearbox.
  2. Check that dowel sleeves for centralising engine/gearbox are in the cylinder block, install if necessary. [Note: If the dowel sleeves get stuck in the gearbox housing they must be removed and new dowel sleeves must be fitted on the engine.]
  1. Press selector shaft lever (2) on gearbox towards the rear as far as it will go (arrow) until parking lock engages. [Note: (Item 1) can be disregarded.]
  1. Before installing the gearbox ensure that the torque converter has been correctly fitted in the gearbox (see the separate procedure). [Note: If the torque converter has not been fully inserted, the distance will be only approx. 10 mm.]
  1. ⚠ Drive lugs on ATF pump can be damaged if torque converter is not fitted correctly. Checking position of torque converter. — Make sure that no wiring or pipes are trapped when bringing engine and gearbox together.
  1. ⚠ The gearbox can be damaged if the torque converter is not fitted correctly. Before and while you are tightening the bolts on the engine/gearbox connection keep checking that the torque converter can still be rotated behind the drive plate. If the torque converter cannot be turned, the drive lugs on the ATF pump and consequently the gearbox will be irreparably damaged when the bolts are fully tightened. — If necessary, re-insert adjustment plate between front longitudinal member and torque reaction support.
  2. Install subframe (repair group 40).
  3. Install gearbox supports with gearbox mountings (see the separate procedure).
  4. Adjust selector lever cable (see the separate procedure).
  5. Install multifunction switch F125.
  6. Install heat shield for selector lever cable (see the separate procedure).
  7. Install ATF lines (see the separate procedure).
  8. Bolt propshaft to transfer box Removing and installing propshaft.
  9. Install heat shield for propshaft (see the separate procedure).
  10. Bolt drive shafts to gearbox flange shafts (repair group 40).
  11. Install heat shield for drive shaft (see the separate procedure).
  12. Install starter Electrical system27.
  13. Install exhaust system and perform stress-free alignment (repair group 26). [Note: When reconnecting battery, remember to activate vehicle equipment (radio/navigation system (RNS), clock, electric windows) according to Owner's Manual. On vehicles with telematics: deactivate service mode of telematics control unit 01For further procedures after reconnecting voltage supply 24.]
  1. Check oil level in front final drive (see the separate procedure).
  2. Check ATF level and top up as required (see the separate procedure).

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.