Removing and installing rear right coolant pipe: VW Passat B8 4.2 (BAR, CLHC, CRGA, CRLB, …)
Step-by-step removing and installing rear right coolant pipe for the VW Passat B8 4.2: 34 steps. What to remove, in what order, and what to check after.
Workshop procedure for VW — the exact step sequence and torque figures, straight from real workshop data.
🧭 Before you start
Fits: VW Passat B8 (3G, 2014–)
- Opens: coolant
- Renewed: o-ring
Don't miss
- Renew O-ring after removal.Secure all hose connections with hose clips meeting production standard Electronic Parts Catalogue.
📋 Procedure
- Remove engine cover panel .
- Drain coolant .
- Remove coolant pipe (rear) .
- Remove coolant pipes (left-side) .
- Remove front exhaust pipe .
- Open heat insulation sleeve (1).
- Release connectors (3) to (6), pull them off, and lay wiring harness to one side.
- Remove bolt (2).
- Move bracket with pressure differential senders towards rear.
- Release and detach connector (2) from charge pressure control solenoid valve N75(1).
- Remove nuts (arrows).
- Place charge pressure control solenoid valve N75(1) with vacuum lines on engine.
- Remove connection from turbocharger .
- Release and pull off electrical connectors (3) to (5).
- If fitted, release and pull off connector (2).
- Lay wires to one side.
- Unscrew nuts (arrows) and push coolant pipes slightly to one side.
- Unbolt right drive shaft from bevel box 40Drive shaft; Assembly overview - drive shaft.
- Push heat insulation sleeve to one side and unplug electrical connector (5).
- Release hose clip (3) and detach air hose.
- Release hose clip (4) and detach coolant hose.
- Remove bolt (1) and loosen bolt (2).
- Loosen bolt (1) and remove screw-type clip.
- Loosen centre hex stud (2) and push coolant pipe slightly towards rear.
- Remove bolts (arrows).
- Push catalytic converter with particulate filter and exhaust gas recirculation cooler towards rear.
- Release hose clip (1) and detach coolant hose.
- Remove centre hex stud (2) and bolt (3) and take off coolant pipe (rear right). [Note: Renew O-ring after removal.Secure all hose connections with hose clips meeting production standard Electronic Parts Catalogue.]
- Install emission control module .
- Install front exhaust pipe .
- Install rear coolant pipe .
- Install left coolant pipes .
- Fit engine cover panel .
- Replenish coolant .
Other VW procedures
- Removing and installing fuel tank with attached components
- 8-cylinder direct petrol injection engine (4.2 ltr. 4-valve), mechanics — Securing engine to engine and gearbox support · 2 torque figures
- Removing and installing Lambda probes – Audi Q7
- Checking fuel pump delivery rate - vehicles with 3.0 ltr. engine
- Removing and installing ignition coils with output stage · 1 torque figures
- Removing engine · 41 torque figures
- Removing and installing camshaft – VW Golf Cabriolet · 47 torque figures
- Adjusting valve timing – VW Passat B5 · 83 torque figures
- Removing and installing camshafts – VW Passat B6 · 39 torque figures
- Removing and installing coolant pump · 53 torque figures
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
The figures on this page come from manufacturer workshop documentation and are shown as they are. The page is assembled automatically from that data — it is not written by an AI. The AI works in the chat, where it answers for your specific car. It writes nothing here.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix →Workshop data on this page last updated 20 Sep 2026.