TorqFix

Removing and installing tank for reducing agent: VW

Removing and installing tank for reducing agent — VW. 21 source steps. Read the instructions and application notes; confirm the exact vehicle before use.

21 steps 15 engine codes Showing one source document; this title group contains 7 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: VW Golf VII Variant (BA), VW Golf Sportsvan (AM1, 2014–2020), VW Golf VII (5G, 2012–2020), VW Touran II (5T, 2015–)

Don't miss

  • For reasons of clarity, the engine and gearbox jack is not shown.
  • Ensure lines are secured properly by pulling.

🔧 Engine codes recorded for this source

📋 Procedure

  1. ⚠ Danger due to escaping reducing agent. Observe safety precautions when working with reducing agent (see the separate procedure). — Remove rear right wheel housing liner General body repairs, exterior 66. Wheel housing liner; Assembly overview - rear wheel housing liner.
  2. Emptying tank for reducing agent (see the separate procedure).
  3. Remove breather line (2) and filler pipe (3) from tank for reducing agent (1).
  4. To do so, press release tabs (arrows).
  5. Pull off filler pipe and line.
  6. Remove cover (1) on tank for reducing agent (2).
  7. To do this, unscrew nuts (arrows).
  8. Unclip all lines on tank for reducing agent (1)(arrows).
  9. Unclip, release and pull off connector (3).
  10. Release and pull off connectors (1) and (3).
  11. Release and pull off reducing agent line (2). Disconnect reducing agent line (see the separate procedure).
  12. Place a cloth underneath coupling point to catch any escaping reducing agent.
  13. Seal off all open lines and connections with clean plugs from engine bung set VAS 6122.
  14. Place engine and gearbox jack VAS 6931 equipped with a soft foam padding under tank for reducing agent to support it.
  15. Unscrew bolts (arrows) of tank for reducing agent (1).
  16. Carefully lower tank for reducing agent, and guide it out while doing this. [Note: For reasons of clarity, the engine and gearbox jack is not shown.]
  1. Lower tank for reducing agent with engine and gearbox jack VAS 6931.
  2. Additionally support tank for reducing agent by hand while doing so.
  1. Ensure lines are secured properly by pulling.
  2. Check that all lines are clipped into tank for reducing agent.
  3. Adapt learnt value for SCR system after reducing agent has been drained or after components have been renewed (see the separate procedure).

📐 6 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 6 workshop diagrams for this job Ask about your VW CLHA — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.