Removing and installing bevel box, Golf 2009 ► with 2.0 l engine: 6-speed dual clutch gearbox 02E Volkswagen R GmbH — VW Golf VI (5K)
Removing and installing bevel box, Golf 2009 ► with 2.0 l engine — 6-speed dual clutch gearbox 02E… Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Golf VI (5K, 2008–2013)
- Opens: engine oil
📋 Procedure
- Remove noise insulation General body repairs, exterior 50. Body, front, noise insulation.
- Remove subframe without steering box 40Removing and installing subframe with steering box.
- Remove right drive shaft Running gear, axles, steering 40. Removing and installing drive shafts.
- Remove front exhaust pipe with catalytic converter (repair group 26).
- Unbolt heat shield above right drive shaft (arrows).
- Drain engine oil.
- Pull connector (1) off oil level and oil temperature sender G266.
- Remove bolts (1) and (2).
- Remove bolts (arrows), pull oil return line off turbocharger and press to right.
- Remove right flange shaft bolt (arrow 1) with socket T10107.
- Remove bolts (arrows) for bevel box to gearbox.
- Pull bevel box together with right flange shaft off gearbox.
- Push bevel box together with flange shaft onto gearbox while turning flange shaft.
- Bolt bevel box onto gearbox using 4 new bolts. Specified torque
- Screw in bolts (1) and (2) for securing bevel box bracket hand-tight.
- Observe tightening sequence:
- Install right drive shaft Running gear, axles, steering 40. Removing and installing drive shafts.
- Install front exhaust pipe with catalytic converter (repair group 26).
- Install subframe 40Removing and installing subframe with steering box.
- Bolt oil return line to turbocharger (repair group 21).
- Check oil level in bevel box and top up (see the separate procedure).
- Install noise insulation General body repairs, exterior 50. Body, front, noise insulation.
- Fill engine with oil. 38.
📐 6 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- 6-speed dual clutch gearbox 02E Volkswagen R GmbH — Removing and installing bevel box, Golf 2004 ► and Passat 2006 ► with V6 engine
- 6-speed dual clutch gearbox 02E Volkswagen R GmbH — Removing and installing bevel box , Passat 2011 ► with 3.6 l V6 engine
- 6-speed dual clutch gearbox 02E Volkswagen R GmbH — Removing and installing knob
- 6-speed dual clutch gearbox 02E Volkswagen R GmbH — Renewing oil seal for propshaft drive flange at bevel box
- 6-speed dual clutch gearbox 02E Volkswagen R GmbH — Renewing seal on gearbox selector lever
- 6-speed manual gearbox 02Q Volkswagen R GmbH — Bleeding clutch mechanism
- Useful information about the “behaviour of the control unit in the event of a gearbox fault”
- Repairing clutch, in conjunction with one-piece flywheel
- Transporting gearbox and securing to assembly stand
- Removing and installing bevel box , Passat 2011 ► with 3.6 l V6 engine
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.