TorqFix

Removing and installing bevel box, Golf 2009 ► with 2.0 l engine: 6-speed dual clutch gearbox 02E Volkswagen R GmbH — VW Golf VI (5K)

Removing and installing bevel box, Golf 2009 ► with 2.0 l engine — 6-speed dual clutch gearbox 02E… Read available instructions and vehicle application notes.

23 steps 6 engine codes 1 original source table

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: VW Golf VI (5K, 2008–2013)

  • Opens: engine oil

🔧 Engine codes recorded for this source

📋 Procedure

  1. Remove noise insulation General body repairs, exterior 50. Body, front, noise insulation.
  2. Remove subframe without steering box 40Removing and installing subframe with steering box.
  3. Remove right drive shaft Running gear, axles, steering 40. Removing and installing drive shafts.
  4. Remove front exhaust pipe with catalytic converter (repair group 26).
  5. Unbolt heat shield above right drive shaft (arrows).
  6. Drain engine oil.
  7. Pull connector (1) off oil level and oil temperature sender G266.
  8. Remove bolts (1) and (2).
  9. Remove bolts (arrows), pull oil return line off turbocharger and press to right.
  10. Remove right flange shaft bolt (arrow 1) with socket T10107.
  11. Remove bolts (arrows) for bevel box to gearbox.
  12. Pull bevel box together with right flange shaft off gearbox.
  1. Push bevel box together with flange shaft onto gearbox while turning flange shaft.
  2. Bolt bevel box onto gearbox using 4 new bolts. Specified torque
  3. Screw in bolts (1) and (2) for securing bevel box bracket hand-tight.
  4. Observe tightening sequence:
  1. Install right drive shaft Running gear, axles, steering 40. Removing and installing drive shafts.
  2. Install front exhaust pipe with catalytic converter (repair group 26).
  3. Install subframe 40Removing and installing subframe with steering box.
  4. Bolt oil return line to turbocharger (repair group 21).
  5. Check oil level in bevel box and top up (see the separate procedure).
  6. Install noise insulation General body repairs, exterior 50. Body, front, noise insulation.
  7. Fill engine with oil. 38.

📐 6 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 6 workshop diagrams for this job Ask about your VW BYD — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.