AUDI CRED — 3L Engine
3L · 268 hp
Engine overview
Torque figures by job
From the step-by-step procedures for this engine — each figure sits in the step that uses it.
- 20 Nm (15 lb-ft) — Tighten base plates for support elements to
- 20 Nm (15 lb-ft) — Tighten base plates for support elements to
- 2 Nm (1.5 lb-ft) — Hand-tighten first bolt (arrow) (
- 2 Nm (1.5 lb-ft) — Hand-tighten first bolt (arrow) (
- 25 Nm (18 lb-ft) — Fit camshaft clamp T40133/1 onto cylinder head (arrows) and tighten to
- 25 Nm (18 lb-ft) — Fit camshaft clamp T40133/2 onto cylinder head (arrows) and tighten to
- 20 Nm (15 lb-ft) — Screw locking pin T40069 into hole (
- 40 Nm (30 lb-ft) — Have a second mechanic apply a torque of
- 25 Nm (18 lb-ft) — Fit camshaft clamp T40133/1 onto cylinder head (arrows) and tighten to
- 25 Nm (18 lb-ft) — Fit camshaft clamp T40133/2 onto cylinder head (arrows) and tighten to
- 20 Nm (15 lb-ft) — Screw locking pin T40069 into hole (
- 40 Nm (30 lb-ft) — Have a second mechanic apply a torque of
- 25 Nm (18 lb-ft) — Fit camshaft clamp T40133/1 onto cylinder head (arrows) and tighten to
- 25 Nm (18 lb-ft) — Fit camshaft clamp T40133/2 onto cylinder head (arrows) and tighten to
- 25 Nm (18 lb-ft) — Fit camshaft clamp T40133/1 onto cylinder head (arrows) and tighten to
- 25 Nm (18 lb-ft) — Fit camshaft clamp T40133/2 onto cylinder head (arrows) and tighten to
- 20 Nm (15 lb-ft) — Secure support VAS 6131/13-7 to scissor-type assembly platform and tighten to
- 20 Nm (15 lb-ft) — Tighten base plates for support elements to
- 20 Nm (15 lb-ft) — Secure support VAS 6131/13-7 to scissor-type assembly platform and tighten to
- 20 Nm (15 lb-ft) — Tighten base plates for support elements to
Workshop procedures for this engine
Step-by-step procedures from the workshop database, carrying 13 torque figures.
- Removing and installing timing chain cover (left-side)
- Exploded view - intake manifold (bottom section) with fuel rail · 5 torque figures
- Removing and installing injectors, FSI engines – Audi A3 · 2 torque figures
- Checking fuel system pressurisation pump G6 - A5/S5/RS 5 up to model year 2011, A4 up to model year 2012
- Removing and installing timing chain cover (right-side) – Audi
- Removing and installing fuel delivery unit - A5 up to model year 2011, A4 up to model year 2012, rest-of-world vehicles with four-wheel drive, USA vehicles with front-wheel drive/four-wheel drive
- Removing and installing coolant pipe (front right) – Audi
- Removing and installing fuel delivery unit - A5 up to model year 2011, A4 up to model year 2012, rest-of-world vehicles with front-wheel drive
- Removing and installing magnetic clutch – Audi Q7
- Removing and installing fuel tank with attached components - rest-of-world vehicles with four-wheel drive
- Removing and installing fuel tank with attached components - rest-of-world vehicles with front-wheel drive
- Removing and installing fuel tank with attached components - USA vehicles with front-wheel drive/four-wheel drive
- Securing supercharger to engine and gearbox support for assembly work · 3 torque figures
- Removing and installing fuel pump control unit J538 - rest-of-world vehicles with four-wheel drive, USA vehicles with front-wheel drive/four-wheel drive
- Removing and installing fuel delivery unit - A5 from model year 2012 onwards, A4 from model year 2013 onwards, rest-of-world vehicles with four-wheel drive, USA vehicles with front-wheel drive/four-wheel drive
- Removing and installing fuel pump control unit J538 - rest-of-world vehicles with front-wheel drive
- Removing and installing supercharger
- Removing and installing fuel delivery unit - A5 from model year 2012 onwards, A4 from model year 2013 onwards, rest-of-world vehicles with front-wheel drive
- Removing and installing fuel gauge sender 2G169 - A5 from model year 2012 onwards, A4 from model year 2013 onwards, rest-of-world vehicles with four-wheel drive, USA vehicles with front-wheel drive/four-wheel drive
- Removing and installing fuel gauge sender 2G169 - A5 up to model year 2011, A4 up to model year 2012, rest-of-world vehicles with four-wheel drive, USA vehicles with front-wheel drive/four-wheel drive
- Removing and installing rotor assembly – Audi A6/A7 C7
- Checking fuel system pressurisation pump G6 - A5 from model year 2012 onwards, A4 with 4-cyl. and 6-cyl. engines from model year 2013 onwards, RS 5 from model year 2012 onwards, RS 4
- Removing and installing coolant pipe (right-side) on gearbox
- Removing and installing coolant circulation pump V50 · 1 torque figures
- Securing supercharger to engine and gearbox support for leak test · 2 torque figures
Got a CRED problem? Ask for free.
Describe the symptoms — TorqFix replies with a diagnosis cited from verified workshop data.
Get free diagnosis →Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
This page combines engine catalogue information with available workshop records. Torque tables and service notes have separate source checks; a source for one field does not verify every specification on the page. Unqualified service quantities, intervals and tool lists are withheld. A source check is not a mechanic’s inspection of your vehicle. Match the model, year and engine variant to the cited document.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 23 Nov 2026.