TorqFix

Timing chain replacement: Toyota Yaris 1ND-TV >2008 - chain

Timing chain replacement — Toyota Yaris 1ND-TV >2008 - chain. 42 source steps. Check the document conditions against your vehicle.

42 steps 1 engine code

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

  • Timing references: follow the source instructions for shaft position, timing marks and any locking tools
  • Replacement notes from the steps (read the conditions below): Renew the O-rings

Don't miss

  • Use the special tool to counterhold
  • Parts must be fitted within 15 minutes of applying the sealant
  • Fit the camshaft counterhold tool
  • Parts must be fitted within 3 minutes of applying the sealant

🔧 Engine codes recorded for this source

📋 Procedure

Preparation and removal

  1. Unless otherwise advised by the manufacturer, the following procedures are recommended:
  2. Counterhold tool:
  3. Counterhold tool:
  4. Coolant pump pulley:
  5. Note: Avoid bending, torsion or traction
  6. Remove the expansion tank pressure cap
  7. Align the camshaft
  8. Close the radiator drain plug
  9. Turn the crankshaft clockwise to align the crankshaft key with the top
  10. Align the coloured chain link with the marks on the gearwheels
  11. Loosen the alternator bolts
  12. Use the special tool to counterhold
  13. Disconnect the injectors
  14. Disconnect the fuel pump connector
  15. Disconnect the ignition coils
  16. Disconnect all the cables, hoses and lines from the engine
  17. Remove the cylinder head cover
  18. Support the engine with a lifting jack
  19. Remove the right-hand engine mount
  20. Remove the timing chain cover
  21. Remove the oil pump
  22. Use a drill to lock the tensioner spring
  23. Remove the chain tensioner
  24. Fit the camshaft counterhold tool

Installation and checks

  1. Refit the chain guide rail
  2. Refit the chain tensioner guide(s)
  3. Refit the chain tensioner piston
  4. Oil pump:
  5. Install a new sealing ring
  6. Renew the O-rings
  7. Apply sealant as indicated
  8. Note: Parts must be fitted within 15 minutes of applying the sealant
  9. Align the oil pump
  10. Refit the oil pump gearwheel cover
  11. Refit the crankshaft pulley
  12. Turn the crankshaft to TDC for cylinder 1
  13. Refit the coolant pump
  14. Refit the right-hand engine mount
  15. Apply sealant as indicated
  16. Refit the valve cover
  17. Note: Parts must be fitted within 3 minutes of applying the sealant
  18. Refit all other parts in the reverse order of removal

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.