TorqFix

ES9J4S eng removal — PEUGEOT

ES9J4S eng removal — Peugeot. 34 source steps. Read the instructions and application notes; confirm the exact vehicle before use.

34 steps 1 engine code

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

  • Opens: coolant, fuel

Don't miss

  • Remove the air-conditioning compressor but do not disconnect
  • Remove the power steering pump but do not disconnect the lines

🔧 Engine codes recorded for this source

📋 Procedure

General

  1. Before disconnecting the battery cable, check the audio system security code

Removal

  1. Disconnect the battery
  2. Drain the coolant
  3. Disconnect the coolant hoses
  4. Remove the front wheels
  5. Remove the front inner wing splash guards
  6. Remove the front bumper
  7. Remove the ancillary drive belt
  8. Refer to 'Adjustment data/Belt layout'
  9. Remove the air-conditioning compressor but do not disconnect
  10. Remove the cross member
  11. Remove the front panel
  12. Remove the wiper mechanism
  13. Remove the air filter and the air-inlet hose
  14. Disconnect the throttle cable
  15. Remove the breather hoses
  16. Disconnect the brake servo hose
  17. Remove the inlet manifold
  18. In the reverse order to that shown
  19. Disconnect the fuel lines
  20. Remove the two catalytic converters
  21. Disconnect the drive shafts
  22. Remove the exhaust manifold heat shield
  23. Remove the power steering pump but do not disconnect the lines
    The pump is removed from its mounting for access while the lines stay connected. Keep the instruction not to disconnect them with this operation; removing the pump mounting is not the same job as disconnecting the hydraulic circuit.
  24. Check that all wiring and hoses are disconnected
  25. Support the engine
  26. Use the special tools
  27. Remove the right hand engine support
    The engine-support operation comes before removal of the mounting in this sequence. Treat it as a prerequisite to that removal. This short instruction establishes the order, but does not by itself describe lifting points or a complete support setup.
  28. Remove the reaction link
  29. Remove the left engine support
  30. Remove the engine/gearbox

Installation

  1. Installation order is the reverse of removal

Torque settings

  1. Power steering pump: 25 Nm

Special tools

  1. Special tools are not required

📐 7 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.