ES9J4S eng removal — PEUGEOT
ES9J4S eng removal — Peugeot. 34 source steps. Read the instructions and application notes; confirm the exact vehicle before use.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
- Opens: coolant, fuel
Don't miss
- Remove the air-conditioning compressor but do not disconnect
- Remove the power steering pump but do not disconnect the lines
🔧 Engine codes recorded for this source
📋 Procedure
General
- Before disconnecting the battery cable, check the audio system security code
Removal
- Disconnect the battery
- Drain the coolant
- Disconnect the coolant hoses
- Remove the front wheels
- Remove the front inner wing splash guards
- Remove the front bumper
- Remove the ancillary drive belt
- Refer to 'Adjustment data/Belt layout'
- Remove the air-conditioning compressor but do not disconnect
- Remove the cross member
- Remove the front panel
- Remove the wiper mechanism
- Remove the air filter and the air-inlet hose
- Disconnect the throttle cable
- Remove the breather hoses
- Disconnect the brake servo hose
- Remove the inlet manifold
- In the reverse order to that shown
- Disconnect the fuel lines
- Remove the two catalytic converters
- Disconnect the drive shafts
- Remove the exhaust manifold heat shield
- Remove the power steering pump but do not disconnect the lines
The pump is removed from its mounting for access while the lines stay connected. Keep the instruction not to disconnect them with this operation; removing the pump mounting is not the same job as disconnecting the hydraulic circuit. - Check that all wiring and hoses are disconnected
- Support the engine
- Use the special tools
- Remove the right hand engine support
The engine-support operation comes before removal of the mounting in this sequence. Treat it as a prerequisite to that removal. This short instruction establishes the order, but does not by itself describe lifting points or a complete support setup. - Remove the reaction link
- Remove the left engine support
- Remove the engine/gearbox
Installation
- Installation order is the reverse of removal
Torque settings
- Power steering pump: 25 Nm
Special tools
- Special tools are not required
📐 7 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other PEUGEOT procedures
- Peugeot 607 ES9J4S timing belt replacement
- 607_ES9J4S motor uit in
- Peugeot 807, 406 ES9J4S timing belt replacement
- 807 ES9J4S
- 407 EW7J4 and EW10J4 timing
- Peugeot 306 DW8/DW8B timing belt replacement
- 406 XUD9 turbo
- EP6CDTX - direct injection, variable valve lift
- 1007 - DV6TED4 - BE4R gearbox removal installation
- Peugeot 207 MA DV4C gearbox removal & installation
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.