TorqFix

Servicing air pipe: Audi A8 D4 (4H)

Servicing air pipe — Audi A8 D4 (4H). 24 source steps. Read the instructions and application notes; confirm the exact vehicle before use.

24 steps

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A8 D4 (4H, 2010–2017)

  • Replacement notes from the steps (read the conditions below): Fit new pipe connector. [Note: The connection pieces in the pipe connector are already tightened to torque. The air pipes only need to be pushed in.] Renew connection piece .

Don't miss

  • Then use waterproof pen to mark end of air pipe in vehicle and both ends of new air pipe.
  • The connection pieces in the pipe connector are already tightened to torque. The air pipes only need to be pushed in.
  • Route new air pipe (5) in a wide arc, as shown in illustration.

📋 Procedure

  1. Clean sections in vicinity of connection piece and relevant cutting location.
  1. Cut through air pipe at cutting location (at a right angle) using cutting pliers VAS 6228.
  2. Unscrew connection piece and remove air pipe.
  3. Then use waterproof pen to mark end of air pipe in vehicle and both ends of new air pipe.
  1. Fit sponge rubber insulation to both pipes.
  2. Fit new pipe connector. [Note: The connection pieces in the pipe connector are already tightened to torque. The air pipes only need to be pushed in.]
  1. Remove transport protection cap.
  2. Push old air pipe through seals (1) and (2).
  3. Then push air pipe through sealing edges (3) and (4) of cutting ring in pipe connector as far as stop (5), exerting more force as required.
  4. Fit sponge rubber insulation over connection pieces.
  5. Repeat this procedure with the new pipe.
  6. Renew connection piece (see the separate procedure).
  1. Release original air pipe (2) from wiring harness (3).
  2. Sheathe wiring harness again in the proper manner.
  3. Service air pipe (see the separate procedure).
  4. Secure sheathed pipe connector (1) and new air pipe (4) to wiring harness with cable ties. [Note: Route new air pipe (5) in a wide arc, as shown in illustration.]
  1. Release original air pipe (3) from wiring harness (4).
  2. Sheathe wiring harness again in the proper manner.
  3. Service air pipe (see the separate procedure).
  4. Secure sheathed pipe connector (2) and new air pipe (5) to air pipe leading to accumulator (1) and to wiring harness (4) with cable ties. [Note: If air pipes are damaged at the solenoid valve block, the cutting location must be positioned in the vehicle interior (spare wheel well) because of the short pipe lengths. Route new air pipe through opening (1) in spare wheel well to solenoid valve block.]
  1. Release original air pipe from wiring harness (3).
  2. Sheathe wiring harness again in the proper manner.
  3. Service air pipe (see the separate procedure).
  4. Secure sheathed pipe connector (2) and new air pipe (4) to wiring harness with cable ties.

📐 5 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 5 workshop diagrams for this job Ask about your Audi — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.