Removing and installing toothed belt, engine code AXW, BMB, BHD: Audi A3 (8P)
Removing and installing toothed belt, engine code AXW, BMB, BHD — Audi A3 (8P). Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi A3 (8P, 2003–2012)
- Timing references: follow the source instructions for shaft position, timing marks and any locking tools
Don't miss
- The fuel system is pressurised. Wrap a cloth around the connection before opening the system. Then release pressure by carefully loosening the connection. — Mark fuel supply and return lines.
- Before removing, mark direction of rotation of poly V-belt with chalk or felt-tip pen. If the belt runs in the opposite direction when it is refitted, this can cause breakage.
- Engage carefully in toothed belt cover (centre) when installing.
- Take up weight of engine evenly with both spindles (but do not raise engine).
- To slacken the bolts for the engine support, raise or lower the engine slightly as necessary via the spindles on engine support bracket10 - 222 A.
🔩 Torque settings recorded in the steps
Values can differ between engine variants — check the code stamped on your block.
| Torque | Fastener / step |
|---|---|
| 10 Nm (7.4 lb-ft) + 90° | Install vibration damper / pulley with new bolts. Note positive location (arrow); tightening torque: 10 Nm + 90° further. |
ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.
📋 Procedure
- Lift off engine cover panel (arrows).
- Remove noise insulation (centre) - fasteners (1 ... 3).
- Remove noise insulation (right-side) - fasteners (1 ... 3).
- ⚠ The fuel system is pressurised. Wrap a cloth around the connection before opening the system. Then release pressure by carefully loosening the connection. — Mark fuel supply and return lines.
- Detach hose going to activated charcoal filter (1).
- Disconnect fuel supply line (2) by pulling release tab.
- Disconnect fuel return line (3) by pulling release tab.
- Disconnect vacuum line (1) going to activated charcoal filter by pressing release tab.
- Disconnect fuel supply line (2) by pulling release tab.
- Disconnect fuel return line (3) by pulling release tab.
- Lift out activated charcoal filter from retainer with pipes connected (arrow).
- Unbolt bracket (3) for ACF.
- Unfasten bolt at filler neck of washer fluid reservoir (2).
- Disconnect electrical wire for coolant shortage indicator switch at expansion tank (1).
- Unbolt coolant expansion tank and lay it aside with pipes connected. [Note: Before removing, mark direction of rotation of poly V-belt with chalk or felt-tip pen. If the belt runs in the opposite direction when it is refitted, this can cause breakage.]
- To slacken poly V-belt, turn tensioner in (direction of arrow).
- Lock tensioner in position with locking pin T10060A.
- Take off poly V-belt.
- Remove locking pin T10060A from tensioner for poly V-belt.
- Remove the bolts (arrows) and lift off toothed belt cover. [Note: Engage carefully in toothed belt cover (centre) when installing.] [Note: Turn over the engine at the central bolt on the crankshaft.]
- ⚠ The engine must only be turned at the crankshaft, in the direction of normal engine rotation (clockwise). — Rotate engine to TDC of No. 1 cylinder by turning central bolt of crankshaft sprocket in normal direction of rotation. Marking on camshaft sprocket and marking on crankshaft must be aligned to TDC of cylinder No. 1 (arrows).
- Position support bracket 10-222 A on wing mounting flange. The spindles face forwards.
- Detach crankcase breather hose from oil filler neck.
- Attach hooks of spindles with shackles10 - 222 A /12 to the lifting eyes.
- Take up weight of engine evenly with both spindles (but do not raise engine).
- Remove bolts (1) and (2) and detach connecting bracket.
- Unscrew bolts (3 ... 6) and detach engine mounting.
- Remove bolts (arrows) and take off engine support [Note: To slacken the bolts for the engine support, raise or lower the engine slightly as necessary via the spindles on engine support bracket10 - 222 A.]
- Unbolt crankshaft pulley. [Note: To loosen and tighten the crankshaft pulley, counterhold central bolt with a ring spanner.]
- Unbolt toothed belt covers (bottom and centre) (arrows).
- Mark rotation direction of toothed belt with chalk or felt-tip pen.
- Loosen nut on tensioning roller (arrow) several turns.
- Remove toothed belt. [Note: When turning the camshaft, the crankshaft must not be at TDC. Otherwise, there is a risk of damage to valves and piston crowns. The engine must be no more than warm to touch.]
- Bring mark on camshaft sprocket in line with mark on toothed belt cover.
- Fit toothed belt on crankshaft sprocket (note rotation direction).
- Secure toothed belt cover (bottom section) with the two bolts at the bottom. [Note: The vibration damper/ pulley can only be installed in one position: The hole (arrow) in the vibration damper must fit over the projection on the toothed belt sprocket on the crankshaft.]
- Install vibration damper / pulley with new bolts. Note positive location (arrow); tightening torque: 10 Nm + 90° further. — 10 Nm (7.4 lb-ft) + 90°
- Turn crankshaft at vibration damper to TDC No. 1 cylinder (arrows).
- Fit toothed belt in the sequence: tensioning roller, camshaft sprocket, coolant pump and last onto idler roller (arrow). [Note: Check tensioning roller is seated correctly in cylinder head.]
- Tension toothed belt. To do so, turn pin wrench T10020 at the eccentric adjuster anti-clockwise (direction of arrow) until the notch (1) is above the indicator (2) (toothed belt over-tensioned).
- Then release tension on toothed belt until the notch (1) and the indicator (2) are aligned.
- Tighten securing nut
- Turn crankshaft two turns in direction of engine rotation and set again to TDC. Make sure that the engine is rotated without stopping during the final 45° (1/8 turn).
- Check tension of toothed belt again. Specification: indicator and notch must align.
- Check valve timing again.
- Repeat adjustment of valve timing.
- Install toothed belt cover (centre) (arrows).
- Install toothed belt cover (top section).
- Insert bottom securing bolt in engine support. Attach engine support to cylinder block from below and tighten bolt finger-tight. [Note: Note different bolt lengths. Bolt (2) is approx. 15 mm shorter than bolts (1 and 3).]
- Fit bolts (1 and 2) and tighten all bolts.
- Lower the engine down to installation position.
- Install complete assembly mounting for engine.
- Remove support bracket10-222A.
- Place toothed belt on crankshaft sprocket (observe direction of rotation).
- Adjust engine mountings (see the separate procedure).
- Install poly V-belt (see the separate procedure).
- Bleed fuel system Motronic direct injection and ignition system (4-cylinder); Rep. Gr. 24; Servicing fuel injection system.
Other AUDI procedures
- Toothed belt drive - exploded view, engine code AXW, BMB, BHD
- Removing and installing crankshaft sealing flange (gearbox end), engine code AXW, BLX, BHD, BLY, BLR, BMB
- Removing and installing map-controlled engine cooling thermostat F265, engine code AXW, BLX, BHD, BLY, BLR, BMB
- Removing and installing sealing flange (front), engine code AXW, BLX, BHD, BLY, BLR, BMB
- Removing and installing sump with balance shaft assembly and oil pump, engine code AXW, BLX, BHD, BLY, BLR, BMB
- Detaching toothed belt from camshaft - engine code CHPB
- Removing and installing camshaft control valve 1N205
- Removing and installing fuel rail – Audi 2.0
- Checking fuel pump delivery rate - vehicles with 2.5 ltr. TFSI engine
- Removing and installing accelerator module (Touran)
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.