Removing and installing rotational speed sender 1G653: Audi Q7 (4L) (BTR, CCFA, CCFC)
Removing and installing rotational speed sender 1G653 — Audi Q7 (4L) (BTR, CCFA, CCFC). 17 source steps. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi Q7 (4L, 2005–2015)
Don't miss
- Disregard (item 1).
- Disregard (item 3).
📋 Procedure
- ⚠ Working on all parts of the exhaust system:Observe safety precautions when working on the exhaust system (see the separate procedure). — Remove front wheel (right-side) Wheels and tyres44.
- Remove engine cover panel (arrows).
- Move electrical wiring harness clear at air cleaner housing (arrow). [Note: Disregard (item 1).]
- Unclip breather hose for front differential from air cleaner housing (arrows).
- Unplug electrical connector (3) for air mass meter G70 and move clear.
- Release hose clip (1) and detach air pipe from air cleaner (top section).
- Move clear coolant hose on air cleaner housing (arrow).
- Release retaining clips (2) and detach top section of air cleaner (right-side) from bottom section.
- Push retaining ring (1) forwards off hose connector.
- Press down release ring (2)(arrows) and disconnect breather hose (3) from air cleaner (top section).
- Unplug electrical connector (5).
- Remove bolt (1).
- Loosen hose clips (2) and (4) and remove air pipe (right-side). [Note: Disregard (item 3).]
- Unplug electrical connector (1).
- Install air pipe (see the separate procedure).
- Install top section of air cleaner (repair group 24).
- Fit front wheel Wheels and tyres44.
📐 6 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other AUDI procedures
- Removing and installing rotational speed sender 2G654
- 5 and 6-speed manual gearbox 01E, front-wheel drive — Removing and installing drive wheel for speedometer sender
- 5-speed manual gearbox 012, 01W, 0A9, front-wheel drive — Removing and installing drive wheel for speedometer sender
- 6-speed manual gearbox 01E, four-wheel drive — Removing and installing drive wheel for speedometer sender
- Checking engine speed sender
- Checking engine speed sender -G28
- Checking fuel system pressurisation pump G6/fuel pump G23, vehicles with 3.0 ltr. (V6) or 4.2 ltr. (V8) engine up to 05.2010
- Removing and installing fuel pump G23, vehicles with 3.0 ltr. (V6) or 4.2 ltr. (V8) engine up to 05.2010
- Checking fuel system pressurisation pump G6/fuel pump G23, vehicles with 6.0 ltr. (V12) engine
- Removing and installing valve for oil pressure control N428
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.