Removing and installing high-pressure pump (left-side): Audi Q7 (4L) (CCGA)
Removing and installing high-pressure pump (left-side) — Audi Q7 (4L) (CCGA). 42 source steps and 2 tables. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi Q7 (4L, 2005–2015)
- Timing references: follow the source instructions for shaft position, timing marks and any locking tools
- Special tools named: T40001/3, locking pin
- Replacement notes from the steps (read the conditions below): Unscrew bolts (arrows) and remove high-pressure pump (1) (left-side) to front. [Note: Renew seals and O-rings.Fuel return line must not be kinked, damaged or clogged]
Don't miss
- Place a cloth underneath to catch escaping fuel.
- Place a cloth beneath the sump (top section) to catch escaping oil.
- Disregard (item 3).
- Renew seals and O-rings.Fuel return line must not be kinked, damaged or clogged
- Make sure alignment is performed and correct spacer(s) is/are determined before installing chain sprocket for high-pressure pump.During measurement the locking pin T40201 must be removed.
🔧 Engine codes recorded for this source
🔩 Torque settings recorded in the steps
Values can differ between engine variants — check the code stamped on your block.
| Torque | Fastener / step |
|---|---|
| 20 Nm (15 lb-ft) | Screw locking pin T40201 into hole (20 Nm); if necessary, turn crankshaft (1) backwards and forwards slightly to fully centralise locking pin. |
ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.
📋 Procedure
- ⚠ Observe safety precautions when working on fuel system .Follow these instructions and rules for cleanliness before starting work and while working on the fuel system. The high-pressure pump must first be filled with fuel before the engine is started. The high-pressure pump must not be allowed to run while still empty. First fuel filling (see the separate procedure). — Remove engine and separate from gearbox (repair group 10).
- Remove timing chain cover (bottom) (repair group 15).
- Slacken union nuts (arrows).
- Unscrew bolt (1) and remove high-pressure pipe.
- Unplug electrical connector (1). [Note: Place a cloth underneath to catch escaping fuel.]
- ⚠ Observe rules for cleanliness when working on the injection system (see the separate procedure). — Detach fuel hoses (arrows) on high-pressure pump.
- Seal off open pipes/lines and connections with clean plugs from engine bung set VAS 6122.
- ⚠ Irreparable damage can be caused if the camshaft timing chains slip. When turning the crankshaft, turn it only in direction of engine rotation (arrow). — Use a lever with 1/2” drive and a 30 mm socket to turn crankshaft to "„TDC“".
- Lock chain sprocket (1) for high-pressure pump with diesel injection pump locking pin 3359.
- ⚠ If a used drive chain for high-pressure pump rotates in the opposite direction when it is refitted, this can cause irreparable damage. Mark running direction of drive chain for high-pressure pump with coloured arrows for re-installation. — Remove bolts (arrows) securing chain sprocket for high-pressure pump and slacken nut (2) securing hub 2 turns.
- Remove diesel injection pump locking pin 3359. [Note: Place a cloth beneath the sump (top section) to catch escaping oil.]
- Unscrew plug (arrow) from sump (top section).
- Screw locking pin T40201 into hole (20 Nm); if necessary, turn crankshaft (1) backwards and forwards slightly to fully centralise locking pin. — 20 Nm (15 lb-ft)
- Wrap insulating tape around tip and shaft of 3.3 mm ∅ drill bit to avoid cuts.
- Press tensioning rail (1) of chain tensioner for high-pressure pump (left-side) in direction of (arrow) and lock chain tensioner by inserting 3.3 mm drill bit (item 2). [Note: Disregard (item 3).]
- Detach guide rail (1) towards rear (arrow).
- Detach chain sprocket for high-pressure pump (left-side).
- Detach hub (1) for high-pressure pump (left-side) with two-arm puller T40001 and claws T40001/3.
- Unscrew nut and remove hub.
- Unscrew bolts (arrows) and remove high-pressure pump (1) (left-side) to front. [Note: Renew seals and O-rings. Fuel return line must not be kinked, damaged or clogged]
- ⚠ Running when dry causes irreparable damage to high-pressure pump. The high-pressure pump must first be filled with fuel before the engine is started. The high-pressure pump must not be allowed to run while still empty. First fuel filling — Fit high-pressure pump (1) with new O-ring and secure with bolts (arrows) and new seals.
- Fit hub onto input shaft for high-pressure pump.
- Fit chain sprocket (1) without spacer(s) and lock high-pressure pump (left-side) with diesel injection pump locking pin 3359.
- Tighten nut (2).
- Tighten bolts (arrows) and determine correct spacer for chain sprocket. [Note: Make sure alignment is performed and correct spacer(s) is/are determined before installing chain sprocket for high-pressure pump. During measurement the locking pin T40201 must be removed.]
- Knock crankshaft flange with a hammer once to eliminate axial clearance of crankshaft.
- Press chain sprocket for high-pressure pump forwards firmly with your hands to eliminate axial clearance of high-pressure pump.
- Position straight edge (1) on flange (3) of crankshaft and determine dimension (a) (actual value) to chain sprocket (2) for high-pressure pump.
- Determine spacer(s) according to table. Part numbers Electronic parts catalogue.
- Remove diesel injection pump locking pin 3359.
- Remove bolts (arrows) and detach chain sprocket.
- Place required spacer(s) onto high-pressure pump hub.
- Fit chain sprocket (1) and lock high-pressure pump (left-side) with diesel injection pump locking pin 3359.
- Tighten bolts (arrows). [Note: Disregard (item 2).]
- Install drive chain for high-pressure pump (repair group 15).
- Install timing chain cover (bottom) (repair group 15).
- Remove locking pin T40201.
- Tighten plug for "„TDC“" drilling in sump (top section) (repair group 17).
- Install high-pressure pipe (see the separate procedure).
- Install engine (repair group 10).
- ⚠ Running when dry causes irreparable damage to high-pressure pump. The high-pressure pump must first be filled with fuel before the engine is started. The high-pressure pump must not be allowed to run while still empty. First fuel filling — Bleed fuel system (see the separate procedure).
- Check for leaks in fuel system (see the separate procedure).
Other AUDI procedures
- Bleeding fuel system after installing high-pressure pump
- Bleeding fuel system after installing high-pressure pump - vehicles with engine codes BMK, BPP, BSG, BNG, ASB
- Bleeding fuel system after installing high-pressure pump - vehicles with engine codes BUG and BUN
- Checking flow rate at high-pressure pump
- Checking fuel low-pressure at high-pressure pump
- Checking fuel pressure and residual pressure (up to high-pressure pump)
- Disconnecting plug-in connectors
- Removing and installing auxiliary radiator – Audi A3
- Renewing engine control unit 2J624 (slave control unit) – Audi
- Removing and installing vibration damper with poly V-belt pulley
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.