Removing and installing auxiliary radiator: Audi A3 (8V) (CZGB)
Removing and installing auxiliary radiator — Audi A3 (8V) (CZGB). 21 source steps. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi A3 (8V, 2012–2020)
- Opens: coolant
- Special tools named: VAS 5014
Don't miss
- Loosen nuts (3) (do not remove).
- Secure all hose connections with correct type of hose clips (as original equipment) Electronic parts catalogue.Do not reuse coolant.
🔧 Engine codes recorded for this source
📋 Procedure
- Remove front wheel Running gear, axles, steering 44. Wheels, tyres.
- Remove wheel spoiler (front) General body repairs, exterior 66. Wheel housing liners; Removing and installing wheel housing liner (front).
- Remove mounting for bumper cover General body repairs, exterior 50. Wing; Exploded view - wing.
- Unfasten front section of wheel housing liner and push it towards rear General body repairs, exterior 66. Wheel housing liners; Removing and installing wheel housing liner (front).
- To prevent paintwork damage, mask bumper cover (1) and wing (2), as shown in illustration.
- Move electrical wiring harness (3) clear and move coolant hose clear at clip (4).
- Place coolant collecting system VAS 5014 or drip tray for workshop hoist VAS 6208 underneath.
- Clamp off coolant hoses using hose clamps, up to 25 mm 3094, release hose clips (1 and 2) and disconnect hoses.
- Loosen nuts (arrows) several turns.
- Pull auxiliary radiator (left-side) (1) forwards off studs, and detach towards rear.
- Move clear electrical wiring harness (2).
- Place coolant collecting system VAS 5014 or drip tray for workshop hoist VAS 6208 underneath.
- Clamp off coolant hoses using hose clamps up to 25 mm 3094, release hose clips (arrows) and disconnect hoses.
- Move coolant hose clear.
- Remove nuts (1, 3) and bolt (4).
- Swivel bottom of auxiliary radiator (right-side) towards rear, then swivel top towards front to release it from studs. Detach auxiliary radiator (right-side).
- Detach air duct from auxiliary radiator.
- Remove nuts (1).
- Loosen nuts (3) (do not remove).
- Detach retaining bracket (2) and auxiliary radiator (4). [Note: Secure all hose connections with correct type of hose clips (as original equipment) Electronic parts catalogue. Do not reuse coolant.]
- Fill up with coolant (see the separate procedure).
Other AUDI procedures
- Removing and installing auxiliary radiator (left-side) – Audi
- Removing and installing auxiliary radiator (right-side) – Audi
- Removing and installing auxiliary radiator (right-side), Audi RS 6/RS 7
- Removing and installing bumper cover - Audi A3 with auxiliary side radiator
- Removing and installing bumper cover - Audi A3 without auxiliary side radiator
- Removing and installing bumper cover - vehicles with auxiliary side radiator
- Checking fuel system pressurisation pump G6 - vehicles with 4-cyl. engine
- Removing and installing fuel pump control unit J538 - vehicles with high-voltage system
- Removing and installing coolant pipes on gearbox – Audi A3
- Checking adjustment of assembly mountings (engine/gearbox mountings)
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.