TorqFix

Removing and installing expansion valve: Audi R8 (4S)

Removing and installing expansion valve — Audi R8 (4S). 26 source steps and 1 torque figure. Check the document conditions against your vehicle.

26 steps 1 torque figure Showing one source document; this title group contains 12 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi R8 (4S, 2015–)

  • Opens: refrigerant (A/C)
  • Also covered elsewhere: Electronic parts catalogue

Don't miss

  • Even minor damage to the connections (e.g. a small scratch) could cause leakage.Ensure absolute cleanliness when working (even the slightest contamination, e.g. a single hair at the connections, could cause leakage).

🔩 Torque settings

Values can differ between engine variants — check the code stamped on your block.

TorqueFastener / step
9 Nm (6.6 lb-ft)Fit bolts (1) (tightening torque: 9 Nm).

ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.

📋 Procedure

  1. ⚠ Danger from escaping pressurised refrigerant. Frostbite on skin and other parts of the body. Extract the refrigerant and then immediately open up the refrigerant circuit. Extract the refrigerant again if more than 10 minutes have passed since the initial extraction and the refrigerant circuit has not been opened up. Renewed evaporation leads to the build-up of pressure in the refrigerant circuit. — Switch off ignition.
  2. Remove luggage compartment liner (with cowl panel trim) General body repairs, interior 70. Luggage compartment trim panels; Overview of fitting locations - luggage compartment trim panels.
  3. Discharge refrigerant circuit Air conditioner with refrigerant R134a 87. Refrigerant circuit (Air conditioner with refrigerant R134a; Refrigerant circuit; Working with the air conditioner service station).
  4. Remove bolts (1).
  5. Detach refrigerant lines (2) with internal heat exchanger from expansion valve (3).
  6. Remove bolts (1).
  7. Remove expansion valve (2).
  8. Seal off open lines and connections (7, 8) with clean plugs from engine bung set VAS 6122.
  1. Check grommet (6) for correct seating and damage
  2. Check refrigerant pipes to evaporator (7, 8) and the connections at expansion valve (2) for dirt and damage [Note: Even minor damage to the connections (e.g. a small scratch) could cause leakage. Ensure absolute cleanliness when working (even the slightest contamination, e.g. a single hair at the connections, could cause leakage).]
  1. Fit retainer (5) on the refrigerant pipes to evaporator (7, 8).
  2. Insert O-rings (3, 4) at connecting pipes to evaporator (7, 8). [Note: Renew O-rings (3, 4); for correct version, refer to Electronic parts catalogue. Lubricate O-ring with refrigerant oil before installing .Pay attention to correct positioning of the O-rings (3, 4) on the refrigerant pipes of evaporator (7, 8).Observe the different tightening torques of the bolts. There are different versions of the expansion valve (2) (identical housing, but different characteristic curve). For correct version refer to Electronic parts catalogue.]
  1. Install expansion valve (2).
  2. Fit bolts (1) (tightening torque: 9 Nm). — 9 Nm (6.6 lb-ft)
  3. Check connections at refrigerant lines (2) with internal heat exchanger and connections at expansion valve (3) for dirt and damage [Note: Even minor damage to the connections (e.g. a small scratch) could cause leakage. Ensure absolute cleanliness when working (even the slightest contamination, e.g. a single hair at the connections, could cause leakage).]
  1. Check grommet (7) for correct seating and damage.
  2. Insert O-rings (4, 5) in groove of respective connection.
  3. If fitted, check that dowel pin (6) is not damaged and is seated correctly. [Note: Renew O-rings (4, 5); for correct version, refer to Electronic parts catalogue. Lubricate O-ring with refrigerant oil before installing .Pay attention to correct positioning of the O-rings (4, 5) on the connections of refrigerant lines (2).Depending on the version, the dowel pin (6) can be fitted at the connections of refrigerant line (2) or at expansion valve (3). The dowel pin (6) might not be fitted on certain versions.]
  1. Insert refrigerant lines (2) with internal heat exchanger at expansion valve.
  2. Fit bolts (1) (tightening torque: 9 Nm). — 9 Nm (6.6 lb-ft)
  3. Check refrigerant lines (2) with internal heat exchanger for correct routing and fastening in the corresponding retainers.
  4. Evacuate and charge refrigerant circuit Air conditioner with refrigerant R134a 87. Refrigerant circuit (Air conditioner with refrigerant R134a; Refrigerant circuit; Working with the air conditioner service station).
  5. Re-install removed components in reverse order.
  6. Start up air conditioner after charging refrigerant circuit (see the separate procedure).
  7. Interrogate the event memory of E87 and erase any faults displayed in "“Guided Fault Finding”" mode.
  8. As a final step, check operation of heater and air conditioner.

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.