Removing and installing coolant temperature sender G62 - engine codes CUKB, CXUA — AUDI
Removing and installing coolant temperature sender G62 - engine codes CUKB, CXUA on Audi: 14 steps, engines CJZA, CMBA, CPTA, CSSA.
Workshop procedure for AUDI — the exact step sequence and torque figures, straight from real workshop data.
🧭 Before you start
Fits: Audi A3 (8V, 2012–2020); platform code 85
- Special tools named: T10527/1
- Renewed: o-ring
Don't miss
- Disregard (arrows).
- Disregard (item 2).
- Place a cloth underneath to catch escaping coolant.
- If O-ring (3) with support ring (4) remains lodged in cylinder head, lift out O-ring with support ring using a piece of wire.Insert new coolant temperature sender into cylinder head immediately to avoid loss of coolant.
📐 45 workshop diagrams for CJZA
Real factory drawings for this job — timing marks, bolt locations and routing. Locked in the free view.
📋 Procedure
- To relieve residual pressure in cooling system, open filler cap (arrow) on coolant expansion tank briefly and then close cap again (it should click into place).
- Remove engine cover panel .
- Loosen hose clips (1, 2) and remove air pipe.
- Unplug electrical connector (1). [Note: Disregard (arrows).]
- Press release tabs on both sides and disconnect line (2) for activated charcoal filter system.
- Move line for activated charcoal filter system clear at air pipe.
- Release fasteners (arrows) with release tool T10527 and T10527/1.
- Detach air pipe (1).
- Press release tabs on both sides and disconnect secondary air hose (arrow).
- Remove bolts (arrow), detach connection (1) and move to one side. [Note: Disregard (item 2).]
- Unplug electrical connector. [Note: Place a cloth underneath to catch escaping coolant.]
- Unscrew bolt (1) and pull off coolant temperature sender G62(item 2). [Note: If O-ring (3) with support ring (4) remains lodged in cylinder head, lift out O-ring with support ring using a piece of wire.Insert new coolant temperature sender into cylinder head immediately to avoid loss of coolant.] [Note: Renew O-ring.]
- Check coolant level .
- Install engine cover panel .
Ask TorqFix about your Audi CJZA — it answers with the exact sequence for that engine and the workshop drawing for each step. First question is free after a 20-second sign-up, no card.
Ask about your Audi CJZA — free → or sign up free to see the drawingsOther AUDI procedures
- Removing and installing toothed belt – Audi · 56 torque figures
- Removing engine – Audi A8 D3 · 41 torque figures
- Removing camshaft timing chain from camshafts – Audi A6/A7 C7 · 38 torque figures
- Installing engine – Audi A8 D4 · 36 torque figures
- Removing and installing camshaft timing chain · 29 torque figures
- Checking delivery pressure of power steering pump (vehicles with 6-cylinder FSI petrol engine) · 1 torque figures
- Removing and installing power steering pump (vehicles with 6-cylinder FSI petrol engine)
- Removing and installing turbocharger - vehicles with engine code letters AVF, AWX
- Removing and installing glove box trim – Audi TT Mk1 · 3 torque figures
- Removing and installing front exhaust pipe (left-side) with starter catalytic converter and main catalytic converter on vehicles with automatic gearbox 01V
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
The figures on this page come from manufacturer workshop documentation and are shown as they are. The page is assembled automatically from that data — it is not written by an AI. The AI works in the chat, where it answers for your specific car. It writes nothing here.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix →Workshop data on this page last updated 20 Sep 2026.