TorqFix

Removing and installing coolant pipes (left-side) for high-voltage cooling system: engine codes CUKB, CXUA — Audi A3 (8V)

Removing and installing coolant pipes (left-side) for high-voltage cooling system — engine codes… Read available instructions and vehicle application notes.

15 steps 12 engine codes

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A3 (8V, 2012–2020)

  • Opens: coolant

Don't miss

  • For illustration purposes, the installation position is shown with the high-voltage components removed.
  • For illustration purposes, the installation position is shown with the lock carrier removed.
  • High voltage can cause fatal injury.Danger of severe or fatal injuries from electric shock.The high-voltage system must be re-energised by a "“high-voltage technician”". — Re-energise high-voltage system .

🔧 Engine codes recorded for this source

📋 Procedure

  1. ⚠ High voltage can cause fatal injury. Danger of severe or fatal injuries from electric shock. The high-voltage system must be de-energised by a "“high-voltage technician”".Work on the de-energised high-voltage system may only be performed by an "“electrically instructed person”". — De-energise high-voltage system (see the separate procedure).
  2. Remove engine cover panel (see the separate procedure).
  3. Drain coolant for high-voltage cooling circuit (see the separate procedure).
  4. Remove mounting for high-voltage battery charging unit (see the separate procedure).
  5. Unplug electrical connector (3).
  6. Release hose clips (1) and disconnect coolant hoses.
  7. Release fastener (2) with a small screwdriver and disengage coolant expansion tank from bracket.
  8. Remove nuts (2) and detach bracket (1).
  9. Remove bolt (3).
  10. Lift retaining clip (1), release hose clip (2) and disconnect coolant hoses. [Note: For illustration purposes, the installation position is shown with the high-voltage components removed.]
  1. Release hose clips (2, 3) and disconnect coolant hoses.
  2. Remove bolt (1).
  3. Move clear coolant pipes (left-side) for high-voltage cooling system and detach. [Note: For illustration purposes, the installation position is shown with the lock carrier removed.] [Note: Secure all hose connections with the correct type of hose clips (same as original equipment) Electronic parts catalogue.]
  1. ⚠ High voltage can cause fatal injury. Danger of severe or fatal injuries from electric shock. The high-voltage system must be re-energised by a "“high-voltage technician”". — Re-energise high-voltage system (see the separate procedure).
  2. Check coolant level (see the separate procedure).

📐 4 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 4 workshop diagrams for this job Ask about your Audi CMBA — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.