TorqFix

Timing chain replacement: Audi A6_4F_2.4 BDW_Chain ->04.2005

Timing chain replacement — Audi A6_4F_2.4 BDW_Chain ->04.2005. 50 source steps. Check the document conditions against your vehicle.

50 steps 1 engine code

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

  • Timing references: follow the source instructions for shaft position, timing marks and any locking tools
  • Special tools named: locking pin, locking tool
  • Replacement notes from the steps (read the conditions below): Use new bolts

Don't miss

  • The cover must be fitted within 5 minutes of applying the sealant
  • The tensioner must be removed from the engine
  • When tightening, always use the tool to counterhold
  • Mark the timing chain and camshaft gearwheels to each other with paint

🔧 Engine codes recorded for this source

BDW

📋 Procedure

Preparation and removal

  1. When tightening, always use the tool to counterhold
  2. Stage 1:
  3. Remove the drive plate
  4. Disconnect the electrical connector from the coolant expansion tank
  5. Remove the ignition coils
  6. Remove the valve cover
  7. Remove the combination valve
  8. Remove the upper left timing chain cover
  9. Right-hand bank:
  10. Disconnect the valve of the crankcase breather hose
  11. Remove the air inlet hose
  12. Note: The tensioner must be removed from the engine
  13. Remove the combination valve
  14. Stage 2:
  15. Remove the oil filter housing
  16. Turn the crankshaft to TDC for cylinder 1
  17. Mark the timing chain and camshaft gearwheels to each other with paint
  18. Remove the camshaft adjusters
  19. Crankshaft pulley
  20. Fit the tensioner locking pin
  21. Remove the balance shaft gearwheel
  22. Compress the tensioner
  23. Fit the tensioner locking pin
  24. Remove the timing chain and gearwheels together

Installation and checks

  1. Tensioner locking pin:
  2. Adaptor:
  3. Fit the timing chain and gearwheels together
  4. Compress the tensioner
  5. Clean off the old sealant
  6. Note: Release the tensioner slowly
  7. Use new bolts
  8. Timing chain lower cover:
  9. Note: Use a drill bit of 8 mm diameter
  10. Left-hand bank:
  11. Tighten the tensioner
  12. Remove the tensioner locking pin
  13. Note: The cover must be fitted within 5 minutes of applying the sealant
  14. Use a new bolt
  15. Right-hand side:
  16. Use a new bolt
  17. Stage 2:
  18. Refit the camshaft gearwheels and chain
  19. Stage 2:
  20. Tighten the exhaust camshaft gearwheel
  21. Tighten the inlet camshaft gearwheel
  22. Remove all the locking tools
  23. Camshaft gearwheel
  24. Check that the camshaft locking tool can be fitted
  25. Check that the crankshaft locking tool can be fitted
  26. Refit all parts in the reverse order of removal

📐 20 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 20 workshop diagrams for this job Ask about your Audi BDW — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.