TorqFix

Replacing the optical fibre conductor between the navigation control unit and the front information control unit: VW Phaeton (3D)

Replacing the optical fibre conductor between the navigation control unit and the front… Read available instructions and vehicle application notes.

20 steps

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: VW Phaeton (3D)

Don't miss

  • When laying the optical fibre conductor, remember that it must not interfere with the operation of servomotors in the air conditioning system.
  • Refit the front information control unit. Do not remove the protective cap from the optical fibre conductor until immediately before plugging in the connectors at the unit.

📋 Procedure

  1. Switch off ignition and all electrical consumers and remove ignition key.
  2. Remove the replacement optical fibre conductor from its packing, leaving the protective caps on.
  3. Secure the two individual leads of the optical fibre conductor with ordinary adhesive tape every 15 cm (arrow).
  1. Remove the glove compartment completely, General body repairs, interior 68. Interior equipment; Compartments, covers and trims; Removing and installing glove compartment (see the separate procedure).
  2. Remove the control unit for front display and information control panel (see the separate procedure).
  3. Unscrew bolt (arrow) from the trim in the right footwell.
  4. Cut off the plug connectors from the defective optical fibre conductor at both ends at the places where the optical fibre conductor enters the vehicle wiring harness,
  5. Take a strong wire about 50 cm long and 2 mm thick, e.g. »a welding rod«.
  6. Bend one end of the wire into a hook, as shown in the illustration. The distance between the (arrows) is about 10 mm.
  7. Guide the wire through the mounting opening for the front control unit for information display and operating unit along the wiring harness into the right footwell.
  8. In the right footwell, guide the hook you have bent in the wire into the empty middle chamber (arrow) of the »straight« connector of the optical fibre conductor.
  1. With the aid of the wire, carefully pull the optical fibre conductor through the central console to the mounting opening for the front information control unit.
  2. Run the optical fibre conductor along the wiring harness from the front information control unit (arrow).
  3. Bring the optical fibre conductor to the same length as the other connectors on the control unit and secure it with cable ties (arrows).
  4. Run the optical fibre conductor above the glove compartment, as shown in the illustration. The opening to the front information control unit in the central console is at the (arrow), fasten the optical fibre conductor with cable ties at points (A). [Note: When laying the optical fibre conductor, remember that it must not interfere with the operation of servomotors in the air conditioning system.]
  1. Coil the surplus length of the optical fibre conductor into a loop and secure this using normal adhesive tape (arrows). Leave about 25 cm of the optical fibre conductor over beyond the loop for running to the Navigation system with CD drive control unit.
  2. Fasten the loop with cable ties to the air vents at the top of the glove compartment (arrows) and run the optical fibre conductor through the opening into the glove compartment interior.
  3. Refit the glove compartment, ensuring that the optical fibre conductor is run in the best position above the glove compartment. Do not remove the protective cap from the optical fibre conductor until immediately before plugging in the connectors at the navigation system with CD drive control unit. [Note: When laying the optical fibre conductor, remember that it must not interfere with the operation of servomotors in the air conditioning system, and that it must not be kinked or tightly bent, and must not produce a rattling noise when installed.]
  1. Refit the front information control unit. Do not remove the protective cap from the optical fibre conductor until immediately before plugging in the connectors at the unit.
  2. Check that the optical fibre conductor functions perfectly with the vehicle diagnosis, testing and information system VAS 5051 or vehicle diagnosis and service information system VAS 5052 in the deleting and interrogating fault memory functions (see the separate procedure).

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.