Adjusting valve timing: VW Passat B5 (3B) (BDN, BDP)
Adjusting valve timing — VW Passat B5 (3B) (BDN, BDP). 69 source steps and 9 torque figures. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Passat B5 (3B)
- Timing references: follow the source instructions for shaft position, timing marks and any locking tools
- Replacement notes from the steps (read the conditions below): Renew crankshaft oil seal -flywheel end- .
Don't miss
- Position crankshaft at TDC No. 1 cylinder. Marking (1) must align with cylinder block joint (2).
- If necessary, turn camshafts slightly to correct position using 32 mm open jaw spanner. The camshaft bar T10068 A must engage. If it does not engage, turn crankshaft one revolution in direction of rotation.
- Never turn camshafts more than 1/4 turn with cylinder heads fitted and locked crankshaft! The valves could contact the piston! — Remove sealing plug from left side of cylinder block.
- Install intermediate shaft first. The fixing pin (arrow) must point upwards.
- Copper-coloured chain link (arrow A) must be put onto the ground tooth of the crankshaft chain sprocket and must align with cylinder block joint (1).
🔩 Torque settings
Values can differ between engine variants — check the code stamped on your block.
| Torque | Fastener / step |
|---|---|
| 8 Nm (5.9 lb-ft) | Fit chain tensioner (3) with locking plate . Specified torque: 8 Nm. |
| 20 Nm (15 lb-ft) | Install stop for chain tensioner (8). Specified torque: 20 Nm. |
| 9 Nm (6.6 lb-ft) | Install chain tensioner (9). Specified torque: 9 Nm. |
| 30 Nm (22 lb-ft) | Install sealing plug in cylinder block. Specified torque: 30 Nm. |
| 60 Nm (44 lb-ft) + 90° | Tighten new securing bolt for intermediate shaft chain sprockets (1) to 60 Nm + 90° (1/4 turn further). (Further turning can be done in several steps.) |
| 60 Nm (44 lb-ft) + 90° | Tighten new securing bolts for camshaft shaft adjusters (2) to 60 Nm + 90° (1/4 turn further). (Further turning can be done in several steps.) |
| 10 Nm (7.4 lb-ft) | Then tighten bolts in sequence shown (items 1…10) and observe the different lengths of the bolts. Specified torque: 10 Nm. |
| 10 Nm (7.4 lb-ft) | Then tighten bolts in sequence shown (items 1…9) and observe the different lengths of the bolts. Specified torque: 10 Nm. |
| 40 Nm (30 lb-ft) | Install tensioner for camshaft timing chain (arrow). Specified torque: 40 Nm. |
ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.
📋 Procedure
- Remove engine.
- Unbolt gearbox.
- Remove dual mass flywheel/drive plate.
- Remove cylinder head cover (see the separate procedure).
- Remove fuel rail with injectors for cylinder bank 1 .
- Remove fuel rail with injectors for cylinder bank 2 .
- Remove intake manifold lower part (see the separate procedure).
- Remove coolant pipes and (see the separate procedure).
- Remove connection (see the separate procedure).
- Remove right engine bracket (see the separate procedure).
- Remove exhaust manifold/catalytic converter module cylinder bank 1.
- Remove camshaft timing chain tensioner.
- Remove cover for camshaft cylinder bank 1 .
- Remove cover for camshaft cylinder bank 2 .
- Remove sealing flange for flywheel/drive plate (see the separate procedure). [Note: Begin with adjustments depending on how far engine has been stripped down. If timing chain has already been used, note marking for direction of rotation .Timing chains must run completely straight in guide and tensioner rails. Ensure that all chain sprocket securing bolts are renewed. The copper coloured chain links no longer align with the adjustment markings after adjusting valve timing and turning the crankshaft. Cylinder bank 1 (bank 1) is located on the right side when looking forwards. Cylinder bank 2 (bank 2) is located on the left side when looking forwards.]
- Position crankshaft at TDC No. 1 cylinder. Marking (1) must align with cylinder block joint (2).
- Position camshafts in cylinder heads to TDC No. 1 cylinder.
- The camshaft bar T10068 A must engage in grooves in both shafts. [Note: If necessary, turn camshafts slightly to correct position using 32 mm open jaw spanner. The camshaft bar T10068 A must engage. If it does not engage, turn crankshaft one revolution in direction of rotation.]
- ⚠ Never turn camshafts more than 1/4 turn with cylinder heads fitted and locked crankshaft! The valves could contact the piston! — Remove sealing plug from left side of cylinder block.
- Screw clamping bolt 3242 into hole so that crankshaft is secured against turning.
- Install intermediate shaft first. The fixing pin (arrow) must point upwards.
- Copper-coloured chain link (arrow A) must be put onto the ground tooth of the crankshaft chain sprocket and must align with cylinder block joint (1).
- Install timing chain (for crankshaft and intermediate shaft) (1) together with intermediate shaft chain sprocket (2). Copper-coloured chain link (arrow B) must be placed on indicated tooth (3) on the chain sprocket.
- Now place chain sprocket (2) onto intermediate shaft chain sprocket (1) with mark (arrow) as shown, and screw new securing bolt (3) hand-tight.
- Fit guide rail (2).
- Fit chain tensioner (3) with locking plate (see the separate procedure). Specified torque: 8 Nm. — 8 Nm (5.9 lb-ft)
- Release lock for chain tensioner (3). [Note: The camshaft timing adjuster can be turned in two directions. When installing ensure that sender wheel for the Hall sender is turned to respective stop. If camshaft adjuster is bolted to camshaft, turn adjuster onto stop before fitting chain. Turn inlet camshaft adjuster anti-clockwise and turn exhaust camshaft adjuster clockwise.]
- Turn Hall sender wheel (1) in (direction of arrow) to stop.
- Turn Hall sender wheel (1) in (direction of arrow) to stop.
- Install timing chain (1) together with the camshaft adjusters. The first copper link must be put on marked tooth (arrow) when you do this. [Note: The three copper links of the camshaft timing chain for cylinder bank 1 are visible from the front.] [Note: The copper links of the camshaft timing chain for cylinder bank 2 are visible from the back.]
- Tighten new securing bolts for camshaft adjusters (5) hand-tight.
- Fit guide rail (6).
- Fit tensioning plate (7). [Note: The camshaft timing adjuster can be turned in two directions. When installing ensure that sender wheel for the Hall sender is turned to respective stop. If camshaft adjuster is bolted to camshaft, turn adjuster onto stop before fitting chain. Turn inlet camshaft adjuster anti-clockwise and turn exhaust camshaft adjuster clockwise.]
- Turn Hall sender wheel (1) in (direction of arrow) to stop.
- Turn Hall sender wheel (1) in (direction of arrow) to stop.
- Install timing chain (1) together with the camshaft adjusters. The first copper link must be put on marked tooth (arrow) when you do this. [Note: The three copper links of the camshaft timing chain for cylinder bank 2 are only visible from the back. When the three timing chains have been put on the intermediate shaft, the three copper links must be lined up one behind the other.]
- Tighten new securing bolts for camshaft adjusters (5) hand-tight.
- Fit guide rail (6).
- Fit tensioning plate (7).
- Install stop for chain tensioner (8). Specified torque: 20 Nm. — 20 Nm (15 lb-ft)
- Install chain tensioner (9). Specified torque: 9 Nm. — 9 Nm (6.6 lb-ft)
- Release lock for chain tensioner (9).
- Remove clamping bolt 3242.
- Install sealing plug in cylinder block. Specified torque: 30 Nm. — 30 Nm (22 lb-ft)
- Remove camshaft bar T10068 A.
- Lock vibration damper using counterhold tool T10069.
- Tighten new securing bolt for intermediate shaft chain sprockets (1) to 60 Nm + 90° (1/4 turn further). (Further turning can be done in several steps.) — 60 Nm (44 lb-ft) + 90°
- Counterhold camshafts using a 32 mm open jaw spanner. [Note: Counterhold only with 32 mm open jaw spanner(arrow) on camshaft. The camshaft bar T10068 A must not be fitted when camshaft adjuster is loosened or tightened. The copper coloured chain links no longer align with the adjustment markings after adjusting valve timing and turning the crankshaft.]
- Tighten new securing bolts for camshaft shaft adjusters (2) to 60 Nm + 90° (1/4 turn further). (Further turning can be done in several steps.) — 60 Nm (44 lb-ft) + 90°
- Install flywheel/drive plate sealing flange (see the separate procedure).
- Renew crankshaft oil seal -flywheel end- .
- Remove sealant residue on cylinder head, on sealing flange and on cover with a rotating brush, e.g. a hand drill with a plastic brush (wear protective glasses). [Note: Install a sealing nipple (4) depending on the version of the cover (1).To achieve a secure seal on the sealing surfaces, covers (1) with sealing nipple (4) must be replaced by new covers (modified design).]
- Lubricate O-ring for oil passage seal (3) (only cylinder bank 1) and insert into cover (1).
- Cut off tube nozzle of silicone sealantD 176 501 A1 at forward marking (∅ of nozzle approx. 2 mm). [Note: Observe expiry date of sealant.]
- Apply sealant as shown to clean sealing surface of cylinder head cover and to sealing surface of sealing flange (2). Sealing compound bead must be: [Note: The cover must be installed within 5 minutes of applying sealing compound.] [Note: When positioning, take care not to displace the bead of sealant.]
- Position the cover and press it on firmly in position (arrow A).
- Tighten bolt (3) hand-tight.
- Press the cover on firmly in position (arrow B).
- Tighten bolt (4) hand-tight.
- Then tighten bolts in sequence shown (items 1…10) and observe the different lengths of the bolts. Specified torque: 10 Nm. — 10 Nm (7.4 lb-ft)
- Remove excess sealant. [Note: When positioning, take care not to displace the bead of sealant.]
- Position the cover and press it on firmly in position (arrow A).
- Tighten bolt (3) hand-tight.
- Press the cover on firmly in position (arrow B).
- Tighten bolt (4) hand-tight.
- Then tighten bolts in sequence shown (items 1…9) and observe the different lengths of the bolts. Specified torque: 10 Nm. — 10 Nm (7.4 lb-ft)
- Remove excess sealant.
- Install tensioner for camshaft timing chain (arrow). Specified torque: 40 Nm. — 40 Nm (30 lb-ft)
- Installing cylinder head cover (see the separate procedure).
Other VW procedures
- Adjusting valve timing, ▶ 22.2012
- Adjusting valve timing, 22.2012 ▶
- Adjusting valve timing, engine codes AWY, BMD, BBM – VW 1.2
- Adjusting valve timing, engine codes AZQ, BME, BZG – VW 1.2
- Adjusting valve timing - engine codes BAN and BAP – VW 6.0
- Adjusting valve timing, engine codes BRN, BRP and BTT – VW 6.0
- Removing, installing and adjusting toothed belt drive for balancing shafts
- Removing and installing camshaft control valves – VW
- Removing and installing fuel filter – VW Touran II
- Securing engine on engine and gearbox supportVAS 6095
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.