Removing and installing upper timing chain cover: VW Golf VII Variant (BA) / Golf VII (5G) (CJXC, CJXB, CYFB)
Removing and installing upper timing chain cover — VW Golf VII Variant (BA) / Golf VII (5G) (CJXC… Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Golf VII Variant (BA), VW Golf VII (5G, 2012–2020)
- Replacement notes from the steps (read the conditions below): If necessary, remove bolts (3 and 5). [Note: Renew seals.]
Don't miss
- Observe use-by-date of sealant.
- Cut off nozzle on tube at front marking (diameter of nozzle approx. 1.5 mm).
- The upper timing chain cover must be installed within 5 minutes after sealant has been applied.
📋 Procedure
- Briefly open filler cap (arrow) for coolant expansion tank in order to reduce residual pressure in cooling system.
- Remove engine cover panel (see the separate procedure).
- Release hose clip (1), disconnect coolant hose and push towards right.
- Disconnect hose (2) for activated charcoal filter (press release tab on hose) and move hose clear.
- Remove inlet camshaft control valve 1N205/exhaust camshaft control valve 1N318.
- Unclip retainer for wiring harness (2).
- Remove bolt (1) for dipstick guide tube.
- Unclip guide tube from timing chain cover (top) in direction of (arrow).
- Remove bolts (1 … 6).
- Remove upper timing chain cover.
- If necessary, remove bolts (3 and 5). [Note: Renew seals.]
- Remove sealant residue on bearing saddle.
- Remove any oil and grease from sealing surfaces. [Note: Observe use-by-date of sealant.]
- Cut off nozzle on tube at front marking (diameter of nozzle approx. 1.5 mm).
- ⚠ Risk of lubrication system becoming clogged due to excess sealantDo not apply sealant bead thicker than specified. — Apply beads of sealant (arrows) onto clean oil seals as shown in illustration. [Note: The upper timing chain cover must be installed within 5 minutes after sealant has been applied.]
- Install upper timing chain cover. Observe tightening sequence (see the separate procedure).
- Install camshaft control valve 1 N205 and exhaust camshaft control valve 1 N318.
- Install engine cover panel (see the separate procedure).
📐 4 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- Removing and installing timing chain cover, upper cover
- Assembly overview - cover for timing chain
- Removing and installing bottom timing chain cover (Tiguan)
- Removing and installing cover for timing chain – VW 3.6
- Removing and installing left and right timing chain cover
- Removing and installing lower cover for timing chain – VW CJGD
- Removing and installing bleeder – VW 2.0
- Removing and installing fuel pump control unit J538
- Renewing oil seal for vibration damper
- Removing and installing timing chain cover (top) - vehicles with engine codes CJSA, CJSB, CJXB, CJXC, CJXF, CYFB
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.