TorqFix

Removing and installing upper coolant pipe: VW Touareg II (7P) (CGEA, CGFA)

Removing and installing upper coolant pipe — VW Touareg II (7P) (CGEA, CGFA). 16 source steps. Check the document conditions against your vehicle.

16 steps 2 engine codes Showing one source document; this title group contains 5 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: VW Touareg II (7P, 2010–2018)

  • Replacement notes from the steps (read the conditions below): Unscrew bolt (1) and pull coolant pipe backwards out of cylinder block (arrow). [Note: Renew O-ring.Attach all cable ties in the same places when installing.]

Don't miss

  • Use cloth to catch escaping coolant.
  • Renew O-ring.Attach all cable ties in the same places when installing.
  • Before installing, clean or smoothen sealing surface for O-ring.

🔧 Engine codes recorded for this source

📋 Procedure

  1. Drain off coolant for high-temperature cooling circuit (see the separate procedure).
  2. Remove supercharger
  3. Unclip pipe (1). Unscrew nuts (arrows) and remove guard (2).
  4. Remove intake manifold lower part on right (see the separate procedure).
  5. Remove (arrow) hose for secondary air forwards out of bracket and detach; press release buttons for this.
  6. Free hose for secondary air and vacuum hoses and lay to side.
  1. ⚠ The fuel system is pressurised. Risk of injury due to fuel which may spurt out. Wear eye protection. Wear protective gloves. Release pressure: place clean cloth around connection (1), and carefully open connection. — Unscrew threaded connection (1) and union nut (3).
  2. Unscrew bolts (arrows) on retaining clip, and remove high-pressure pipe. [Note: Use cloth to catch escaping coolant.]
  1. Remove coolant hose (2) from coolant pipe.
  2. Unscrew bolt (1) and pull coolant pipe backwards out of cylinder block (arrow). [Note: Renew O-ring. Attach all cable ties in the same places when installing.]
  1. Before installing, clean or smoothen sealing surface for O-ring.
  2. Moisten new O-ring with coolant and slide onto coolant pipe.
  3. Install intake manifold lower part on right (see the separate procedure).
  4. Install high-pressure pipe (see the separate procedure).
  5. Install supercharger
  6. Replenish coolant for high-temperature cooling circuit (see the separate procedure).

📐 4 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 4 workshop diagrams for this job Ask about your VW CGEA — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.