Removing and installing upper left coolant pipe — VW
Removing and installing upper left coolant pipe on VW: 36 steps, engines BKS, BMK, BUN, CARA. What to remove, in what order, and what to check after.
Workshop procedure for VW — the exact step sequence and torque figures, straight from real workshop data.
📋 Procedure
- Remove engine cover panel .
- Drain coolant .
- Remove coolant pipe (rear) .
- Remove coolant pipes (left-side) .
- Remove front exhaust pipe .
- Open heat insulation sleeve (1).
- Remove connector (4) from retainer, release it, and pull it off.
- Lay wire to one side.
- Disconnect connectors (3 and 5) and lay wiring harness to one side.
- Remove bolt (2) and move bracket with pressure differential sender G505 towards rear.
- Open heat insulation sleeve (1).
- Disconnect connectors (3, 4, 5, 6) and lay wiring harness to one side.
- Remove bolt (2).
- Move bracket with pressure differential senders towards rear.
- Remove connecting piece on turbocharger .
- Open hose clips (1) and (3), and remove coolant hoses.
- Unscrew bolts (2) and (4).
- Remove wire from retainer, and remove coolant pipe.
- Release and pull off connectors on plenum chamber bulkhead .
- Lay wires to one side.
- Release lines from retainers on plenum chamber bulkhead and on turbocharger.
- Push heat insulation sleeve to one side and unplug electrical connector (5).
- Release hose clip (3) and detach air hose.
- Release hose clip (4) and detach coolant hose.
- Remove bolt (1) and loosen bolt (2).
- Loosen bolt (1) and remove screw-type clip.
- Loosen centre hex stud (2) and push coolant pipe slightly towards rear.
- Remove bolts (arrows) and press catalytic converter with particulate filter and exhaust gas recirculation cooler towards rear.
- Release hose clip (1) and detach coolant hose.
- Remove centre hex stud (2) and bolt (3) and take off coolant pipe (rear right). [Note: Renew O-ring after removal.Secure all hose connections with hose clips meeting production standard Electronic Parts Catalogue.]
- Install emission control module .
- Install front exhaust pipe .
- Install rear coolant pipe .
- Install left coolant pipes .
- Fit engine cover panel .
- Replenish coolant .
Other VW procedures
- Assembly overview - cylinder head cover · 1 torque figures
- Removing and installing Hall sender G40
- Removing and installing mounting plate for oil cooler, pressure control valve and oil filter housing · 1 torque figures
- Checking return flow rate of injectors (piezo injectors) with engine running.
- Removing and installing lower part of left intake manifold (engine codes BKS, BUN)
- Removing engine · 41 torque figures
- Removing and installing camshaft · 47 torque figures
- Adjusting valve timing · 83 torque figures
- Removing and installing camshafts · 39 torque figures
- Removing and installing coolant pump · 53 torque figures
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
The figures on this page come from manufacturer workshop documentation and are shown as they are. The page is assembled automatically from that data — it is not written by an AI. The AI works in the chat, where it answers for your specific car. It writes nothing here.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix →Workshop data on this page last updated 20 Sep 2026.