Removing and installing turbocharger, Golf, Passat: VW
Removing and installing turbocharger, Golf, Passat — VW. 32 source steps. Read the instructions and application notes; confirm the exact vehicle before use.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Golf VII Variant (BA), VW Golf VII (5G, 2012–2020), VW Passat B8 (3G, 2014–)
- Opens: coolant
- Also covered elsewhere: Electronic Parts Catalogue (ETKA)
Don't miss
- The following procedure is necessary to provide more space between the cylinder head and plenum chamber bulkhead.
📋 Procedure
- Remove front exhaust pipe with catalytic converter (see the separate procedure).
- Remove air filter housing with air pipe leading to turbocharger (see the separate procedure).
- Drain coolant (see the separate procedure).
- Unscrew bolt (1), and open hose clip (2).
- Pull charge air pipe off turbocharger.
- If fitted, unbolt earth wires (arrows).
- Pull off coolant hose (arrow).
- Pull off connectors (1) and (2). Open retainer (3).
- Pull off connectors (arrows), and lay wiring harness to one side.
- If fitted, unscrew bolt (1) for earth wire, and disconnect coolant hoses (2 and 3). Seal lines with suitable plugs from the engine bung set VAS 6122.
- Release fastener (arrow), and remove wiring duct (4) upwards from retainer.
- Unscrew bolts (1, 2 and 3). Swivel coolant pipe to one side.
- Remove actuators for camshaft adjustment (1).
- Remove ignition coils with output stages (arrows).
- Unscrew bolts (arrows) and nut (1).
- Detach heat shield (2).
- Remove Lambda probe 1 before catalytic converterGX10.
- Unscrew bolts (arrows), and pull oil supply pipe (2) off turbocharger (1).
- Open hose clip (3), and pull hose (4) off turbocharger.
- Disconnect electrical connectors (1) and (3).
- Press release tabs on crankcase breather hose (2) and detach hose.
- Remove bracket (2) for turbocharger from below. To do this, unscrew bolt (1) and loosen bolt (3).
- Unscrew bolts (arrows), and pull coolant pipe (2) off turbocharger (1).
- Unscrew bolts (arrows), and pull oil return pipe (2) off turbocharger (1). [Note: The following procedure is necessary to provide more space between the cylinder head and plenum chamber bulkhead.]
- Unscrew bolts (1, 2 and 3), and remove pendulum support.
- Pull engine back approx. 20 mm with tensioning strap T10038.
- Remove nuts (arrows).
- Remove turbocharger from cylinder head, and remove it upwards. [Note: Renew seals, gaskets, O-rings and self-locking nuts. Lubricate turbocharger studs with high-temperature paste. For high-temperature, paste refer to Electronic Parts Catalogue.Fill turbocharger with engine oil at connection for oil supply line. Hose connections and hoses for charge air system must be free of oil and grease before assembly. Secure all hose connections with the correct type of hose clips (same as original equipment) Electronic Parts Catalogue.]
- Install front exhaust pipe with catalytic converter (see the separate procedure).
- Aligning exhaust system free of tension (see the separate procedure).
- Replenish coolant (see the separate procedure).
- Check oil level. [Note: After installing turbocharger, run engine for about 1 minute at idling and do not rev up immediately, this ensures that the turbocharger is fully primed with oilAfter new components have been installed (engine/short engine, cylinder head or turbocharger) the oil pressure control must be set to max. pressure for approx. 1000 km if the function is available in the engine control unit. This will compensate for the increased friction during run-in of new components, and a better transport of wear-related particles is guaranteed. To do this, connect vehicle diagnostic tester, switch on ignition, and select the following menu options:Engine electronicsGuided FunctionsAdaptionIf available, select the function Oil pressure for engine run-in.]
Other VW procedures
- 6-speed dual clutch gearbox 02E — Removing and installing bevel box, Golf 2004 ► and Passat 2006 ►
- 6-speed dual clutch gearbox 02E Volkswagen R GmbH — Removing and installing bevel box, Golf 2004 ► and Passat 2006 ► with V6 engine
- Assembly overview - clutch hydraulics, Scirocco, CC, Golf Cabriolet, Passat, LHD vehicles
- Assembly overview - clutch hydraulics, Scirocco, CC, Golf Cabriolet, Passat, RHD vehicles
- Assembly overview, pedal cluster with clutch position sender G476 - Touran from 06.03, Passat, Eos, Scirocco, Golf, and Golf Plus
- Checking exhaust gas recirculation cooler for leaks, Golf, Golf Plus, Golf Cabriolet, Touran, Passat
- Removing and installing radiator cowl – VW Passat B8
- Removing and installing engine mounting – VW
- Removing and installing gearbox mounting – VW Jetta VI
- Removing and installing inlet side balance shaft
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.