TorqFix

Checking and adjusting injection pump timing: VW

Checking and adjusting injection pump timing — VW. Original source text. Read the instructions and application notes; confirm the exact vehicle before use.

factory workshop text

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

📋 Procedure

ℹ️ Torque figures below come verbatim from workshop data — always cross-check against your vehicle's factory manual before final tightening.

AJA
Special tools, testers and auxiliary items

Counter-hold 3036
Dial gauge (range 0...3 mm)
Adapter 2066 for dial gauge
Torque wrench V.A.G 1331 (5...50 Nm)

With engine removed:

Adjusting device 2068 A

Checking and adjustment conditions

Toothed belt tension OK.
Cold start accelerator must not be pulled out (operating lever of fuel injection pump in 0 position).

Test sequence

Remove insulation tray:

=> General body repairs; Repair group 50; Removing insulation tray
General body repairs
Removing insulation tray

Vehicles 09.94▸

Remove radiator grille.

=> General body repairs; Repair group 66; Servicing radiator grille; removing radiator grille
General body repairs
Servicing radiator grille removing radiator grille

Continuation for all vehicles

Unbolt left and right-hand securing bolts -1-.

Note:

On vehicles ▸08.94, there are Qty. 2 securing bolts each side in lock carrier.

Fold lock carrier with radiator forwards.
Remove toothed belt guard for injection pump drive.
Turn crankshaft in engine direction of rotation to TDC No. 1 cylinder.

Engine installed

Marks on injection pump sprocket/console and on flywheel/clutch bell housing -arrows- must align.

Note:

This condition is only obtained every 2nd TDC position.

Engine removed

Set adjusting tool 2068 A to 82 mm -arrow A-. The reference point is the graduation on the left of the vernier scale.
Fit adjusting tool as illustrated. Turn crankshaft until TDC mark on the flywheel and tip of adjusting tool -arrow B- and marks on injection pump sprocket and console are aligned.

Note:

This condition is only obtained every 2nd TDC position.

Fit dial gauge adapter 2066 and dial gauge (measuring range 0...3 mm) in place of the plug with approx. 2.0 mm preload.

Notes:

Always renew plug seal.
Tightening torque 15 Nm.
May be tighten to max. 25 Nm if leaks occur.
A second mechanic is required to observe the flywheel/clutch bell housing markings when checking the commencement of injection whilst turning crankshaft back and forth.
The vehicle must be raised and readings made from below to enable the gauge to read whilst turning injection pump drive sprocket.

Slowly rotate crankshaft against engine direction of rotation (anti clockwise) until the pointer of the dial gauge no longer moves.
Set dial gauge to "0".
Rotate crankshaft in engine direction of rotation (clockwise) until TDC marking on the flywheel is aligned with the reference mark.
Read off the commencement of injection on the dial gauge.
Engine code AAB
Test value: 0.93 ... 1.07 mm lift
Engine code AJA
Test value: 0.85 ... 0.95 mm lift

Note:

No resetting is necessary provided the test figure is within the specified tolerance.

If specification is obtained:

Adjust the commencement of injection either by loosening the securing bolts on the console and support and then turning the injection pump.

Or by turning the injection pump drive sprocket as described as follows.

Hold the sprocket driving the injection pump with counter-hold tool 3036. Remove the securing bolt and take off the drive sprocket with toothed belt.
Check whether TDC mark on flywheel and reference mark are aligned.
Turn the injection pump drive sprocket with counter-hold tool 3036 opposite to the engine direction of rotation -direction of arrow A-, until the dial gauge needle no longer moves.
Set dial gauge to "0".
Turn injection pump drive sprocket in engine direction of rotation -direction of arrow B- using counter-hold 3036 until the gauge reads:
Engine code AAB
1.00 ±0.02 mm lift (commencement of injection).
Engine code AJA
0.90 ±0.02 mm lift (commencement of injection).
Hold the injection pump drive sprocket in this position with counter-hold tool 3036 and pretighten it to
50 Nm.

Note:

The commencement of injection must be checked again by turning crankshaft back via vibration damper to gauge reading "0" and forward to TDC. The value will deviate due to toothed belt step.

The commencement of injection must now be corrected by a second adjustment.

Example:

/ - · First value / Checked value · 1.00 / 0.93 · mm / mm
= · Deviation · 0.07 · mm
Value for second adjustment · 1.07 · mm

After the second adjustment hold injection pump drive sprocket with counter-hold tool 3036 and tighten to
100 Nm.
Install toothed belt guard.
Install radiator with lock carrier.
Install insulation tray.

Is this your exact engine?

TorqFix answers live for your specific car — tell it the engine code to check the available procedures, torque figures and wiring for that variant.

Ask about my car →

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.