Removing and installing gearbox, 1.4 l: 90 kW TSI engine — 7-speed dual clutch gearbox 0AM — VW Golf V / Jetta (1K)
Removing and installing gearbox, 1.4 l — 90 kW TSI engine — 7-speed dual clutch gearbox 0AM — VW… Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Golf V / Jetta (1K, 2003–2009)
- Replacement notes from the steps (read the conditions below): Renew needle bearing in crankshaft 13Crankshaft group.
Don't miss
- Raise vehicle. All 4 supports of lifting platform must be at same height.
- After loosening centre bolt, do not lower vehicle to ground again.
- Support engine and gearbox. Do not raise.
- Move engine and gearbox jackV.A.G 1383 A under gearbox and support gearbox. Do not raise.
- Securing clip for selector lever cable must be renewed.
📋 Procedure
- Before beginning removal, have you been in contact with your TSC or the importer for your country?
- Before removal, print out a diagnosis log for this vehicle. Before returning the gearbox in the usual manner, secure the log to the gearbox so that it cannot be lost during transport.
- Raise vehicle. All 4 supports of lifting platform must be at same height.
- Move selector lever to position “P” position. [Note: After loosening centre bolt, do not lower vehicle to ground again.]
- Step on the brake pedal while a second mechanic loosens the two drive shaft bolts (arrow).
- Remove complete air filter housing 24Removing and installing air filter.
- Remove battery and (battery box)27Battery; Removing and installing battery.
- Remove starter Electrical system 27. Removing and installing starter.
- Remove selector lever cable from ball head.
- Release mechatronic unit connector by pulling and pull off connector.
- Now remove all upper connecting bolts between gearbox and engine.
- Remove noise insulation 50Assembly overview - noise insulation.
- Remove front part of wheel housing 66Assembly overview - front wheel housing.
- Remove all retainers and brackets from front of gearbox.
- Remove pendulum support.
- Remove both drive shafts Running gear, axles, steering 40. Removing and installing drive shafts.
- Unbolt exhaust system bracket from subframe.
- Remove front exhaust pipe from catalytic converter so that lower bolts can be removed.
- If there are hose and cable connections in area of engine support eye for support bracket10-222A, remove these now.
- Remove engine cover from cylinder head.
- Support engine and gearbox. Do not raise.
- Then lower engine and gearbox slightly using spindles of support bracket10 - 222 A so that bracket can be removed.
- Set up gearbox support 3282 with adjustment plate 3282/59.
- Move engine and gearbox jack V.A.G 1383 A under gearbox and support gearbox. Do not raise.
- Position plate of pin under gearbox housing, not under mechatronic unit.
- Screw a pin into “rear” hole for pendulum support.
- Remove remaining engine/gearbox connecting bolts.
- Press gearbox off engine, “observing selector lever cable” and lower gearbox.
- Remove brackets because they are not included with a “new” gearbox.
- Renew needle bearing in crankshaft 13Crankshaft group.
- For purposes of analysis, attach diagnosis log of this gearbox securely to gearbox when it is ready for shipping.
- In some cases, there are brackets on the front of the gearbox. Install brackets.
- Check for proper seating of both dowel sleeves between engine and gearbox.
- Check for proper seating of intermediate plate.
- Guide selector lever cable as soon as possible into its support bracket.
- Readjust the gearbox support until the engine and gearbox “are aligned with each other”.
- If necessary, turn crankshaft slightly.
- After fitting starter motor, check that both breather caps are in place!
- Securing clip for selector lever cable must be renewed.
- Always adjust selector lever cable (see the separate procedure).
📐 14 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- 6-speed dual clutch gearbox 02E — Removing and installing bevel box, Golf 2004 ► and Passat 2006 ►
- 6-speed dual clutch gearbox 02E — Removing and installing bevel box, Passat CC 2009 ►, CC 2010 ► with diesel engine
- 6-speed dual clutch gearbox 02E — Removing and installing bevel box, Passat CC 2009 ►, CC 2010 ► with 3.6 l V6 engine
- 6-speed dual clutch gearbox 02E — Removing and installing gearbox oil cooler
- 6-speed dual clutch gearbox 02E — Removing and installing oil pump
- 6-speed dual clutch gearbox 02E — Removing and installing selector lever handle
- Removing engine
- Removing and installing camshaft – VW Golf Cabriolet
- Adjusting valve timing – VW Passat B5
- Removing and installing camshafts – VW Passat B6
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.