Removing and installing gearbox oil cooler: 6-speed dual clutch gearbox 02E — VW
Removing and installing gearbox oil cooler — 6-speed dual clutch gearbox 02E — VW. Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Passat CC (357, 2008–2012), VW Sharan II / SEAT Alhambra (7N, 2010–), VW Touran I (1T, 2003–2015), VW Golf V / Jetta (1K, 2003–2009), VW Passat B6 (3C, 2005–2010), VW Golf VI (5K, 2008–2013)
- Replacement notes from the steps (read the conditions below): ⚠ No coolant must be allowed to drip into gearbox! — Renew O-rings (C) of gearbox oil cooler (B).
Don't miss
- No coolant must be allowed to drip into gearbox! — Renew O-rings (C) of gearbox oil cooler (B).
🔩 Torque settings
Values can differ between engine variants — check the code stamped on your block.
| Torque | Fastener / step |
|---|---|
| 20 Nm (15 lb-ft) + 90° | Screw in new bolts (A) and tighten to 20 Nm + 90° (1/4 turn). |
ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.
📋 Procedure
- Move selector lever to position "“P”" position.
- Remove battery and battery tray Electrical system 27. Battery; Removing and installing battery.
- Lay lint-free cloths on gearbox oil cooler and gearbox to catch escaping coolant.
- Clamp off coolant hoses using hose clamps 3094 and remove from cooler.
- Remove bolts (A) and remove cooler (B).
- ⚠ No coolant must be allowed to drip into gearbox! — Renew O-rings (C) of gearbox oil cooler (B).
- Set gearbox oil cooler (B) in place, observing O-rings (C).
- Screw in new bolts (A) and tighten to 20 Nm + 90° (1/4 turn). — 20 Nm (15 lb-ft) + 90°
- Attach coolant hoses to gearbox oil cooler and remove hose clamps 3094.
- Install battery tray and battery Electrical system 27. Removing and installing battery.
- Check coolant level and top up with coolant as needed 19Removing and installing parts of cooling system.
- After repair, check oil level and top up (see the separate procedure).
Other VW procedures
- 7-speed dual clutch gearbox 0BH — Removing and installing gear oil cooler
- 6-speed dual clutch gearbox 02E — Removing and installing oil pump
- 6-speed dual clutch gearbox 02E — Renewing oil seal for left flange shaft - front and four-wheel drive
- 6-speed dual clutch gearbox 02E — Renewing oil seal for propshaft drive flange at bevel box
- 6-speed dual clutch gearbox 02E — Renewing selector shaft lever oil seal with gearbox removed
- 6-speed dual clutch gearbox 02E Volkswagen R GmbH — Renewing oil seal for propshaft drive flange at bevel box
- Removing engine
- Removing and installing camshaft – VW Golf Cabriolet
- Adjusting valve timing – VW Passat B5
- Removing and installing camshafts – VW Passat B6
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.