EGR valve removal: Citroen C5 MY08 DT20C
EGR valve removal — Citroen C5 MY08 DT20C. 58 source steps. Read the instructions and application notes; confirm the exact vehicle before use.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
- Opens: coolant, fuel
- Timing references: follow the source instructions for shaft position, timing marks and any locking tools
- Special tools named: locking pin, locking tool
🔧 Engine codes recorded for this source
📋 Procedure
Preparation and removal
- Raise the front of the vehicle
- Remove the front right wheel
- Remove the EGR pipe
- Disconnect the electrical connector
- Disconnect the fuel lines
- Remove the EGR pipe
- Remove the coolant pipe
- Remove the intercooler air duct
- Remove the nut
- Remove the ancillary drive belt
- Fit a lifting eye to the engine
- Use a hoist to support the engine
- Remove the timing belt upper covers
- Remove the engine support
- Align the camshaft gearwheel marks as shown
- Remove the catalytic converter together with the diesel particulate filter
- Lock the crankshaft by fitting a locking pin into the flywheel
- Fit the camshaft locking pins
- Remove the coolant pump pulley
- Remove the crankshaft pulley
- Loosen the tensioner pulley bolt
Installation and checks
- Lifting eye:
- Check the gearwheels, tensioner and idler pulley(s) for damage and wear
- Flywheel locking tool:
- Check the condition of the coolant pump
- Fit the clamp
- Camshaft gearwheel
- Note: Avoid bending, torsion or traction
- Align the marks on the tensioner and backplate
- Tighten the tensioner pulley bolt
- Tighten the camshaft gearwheel bolts
- Remove all the locking tools
- Fit the camshaft locking pins
- Remove all the locking tools
- Refit the crankshaft pulley
- Refit the engine support
- Refit the timing belt upper cover
- Remove the lifting eye
- Refit the ancillary drive belt
- Refit the nut
- Refit the intercooler air duct
- Refit the coolant pipe
- Refit the EGR pipe
- Reconnect the coolant temperature sensor
- Refit the mixing chamber housing with EGR valve
- Refit the air inlet duct
- Refit the fuel line bracket
- Reconnect the fuel lines
- Reconnect the electrical connector(s)
- Refit the EGR pipe
- Refill the cooling system
- Refit the right wheel arch liner
- Refit the front right wheel
- Refit the engine lower cover
- Lower the vehicle
- Refit the engine upper cover
- Reconnect the battery
- Refit the LDS fluid reservoir cap
Other CITROEN procedures
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.