TorqFix

Testing intake manifold change-over valve: Audi

Testing intake manifold change-over valve — Audi. Original source text. Read the instructions and application notes; confirm the exact vehicle before use.

factory workshop text

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

📋 Procedure

AJG ALF
Run engine at idling speed for 2 or 3 minutes to build up vacuum.
Switch engine off.
Switch ignition on.

Final control diagnosis
⇒
Intake manifold press. change valve -N156
Perform final control diagnosis and activate intake manifold change-over valve
=>Page
01-26.

The valve should click (clicking can be heard and felt). After 1 minute the final control diagnosis is terminated.

If the valve does not click, switch off the ignition.
Unplug connector from intake manifold change-over valve -N156.
Measure resistance between valve contacts using V.A.G 1526.

Specification: 25...35ω

If the reading does not match the specification, renew intake manifold change-over valve -N156.

If the reading matches the specification, test voltage supply.

Testing voltage supply to intake manifold change-over valve

-N156

Connect diode test lamp V.A.G 1527 between engine earth and contact 1 on connector using test leads from auxiliary cable set V.A.G. 1594.
Operate the starter briefly.

The diode test lamp should light up.

If the diode test lamp does not light up:
Test fuse for intake manifold change-over valve.

If the fuse is OK:

Test for open circuit and short circuit in wiring between fuel pump relay and contact 1 on connector via fuse for intake manifold change-over valve.

=> Current flow diagrams, Electrical fault finding and Fitting locations binder

If the voltage supply is OK, test activation.

Testing activation of intake manifold change-over valve

Connect diode test lamp V.A.G 1527 between contacts 1 (positive) and 2 on connector for intake manifold change-over valve using test leads from auxiliary cable set V.A.G 1594.

Final control diagnosis
⇒
Intake manifold press. change valve -N156
Perform final control diagnosis and activate intake manifold change-over valve
=>Page
01-26.

If the diode test lamp does not flash or lights up continuously, test the wiring.

Testing wiring

Connect test box V.A.G 1598/22 to wiring harness for engine control unit
=> Page
24-21.

Test wiring between contact 2 on connector for intake manifold change-over valve...
...and contact 64 on engine control unit for open circuit and/or short circuit.

=> Current flow diagrams, Electrical fault finding and Fitting locations binder

Connector for intake manifold change-over · Socket on test box V.A.G 1598/22
2 · 64

If the wiring is OK, fit a new engine control unit
=>Page
24-23.
Test operation of intake manifold change-over valve -N156 again
=>Page
24-54.

Is this your exact engine?

TorqFix answers live for your specific car — tell it the engine code to check the available procedures, torque figures and wiring for that variant.

Ask about my car →

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.