TorqFix

Removing and installing hybrid battery unitAX1: Audi A3 (8V)

Removing and installing hybrid battery unitAX1 — Audi A3 (8V). 32 source steps and 1 tables. Check the document conditions against your vehicle.

32 steps 12 engine codes 1 inline torque figure 1 original source table Showing one source document; this title group contains 2 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A3 (8V, 2012–2020)

  • Special tools named: VAS 6131/13, VAS 6131/10
  • Replacement notes from the steps (read the conditions below): Leave the scissor-type assembly platformVAS 6131 B in the removal position so you can use it to reinstall the high-voltage battery. [Note: Renew bolts tightened with specified tightening angle.]

Don't miss

  • Disregard (items 2, 4).
  • Make sure that threaded spindles are screwed in completely.
  • The high-voltage battery can be removed from the scissor-type assembly platformVAS 6131 B using the workshop hoistVAS 6100 without changing the position of the scissor-type assembly platform.
  • Renew bolts tightened with specified tightening angle.

🔧 Engine codes recorded for this source

🔩 Torque settings recorded in the steps

Values can differ between engine variants — check the code stamped on your block.

TorqueFastener / step
20 Nm (15 lb-ft)Tighten base plates for support elements to 20 Nm on scissor-type assembly platform.

ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.

📋 Procedure

  1. ⚠ High voltage can cause fatal injury. Danger of severe or fatal injuries from electric shock. The high-voltage system must be de-energised by a suitably qualified person (an Audi high-voltage technician). — De-energise high-voltage system (see the separate procedure).
  2. Remove underbody trim General body repairs, exterior 66. Underbody trim; Removing and installing underbody trim.
  3. Remove silencer (see the separate procedure).
  4. Remove heat shield for high-voltage battery General body repairs, exterior 66. Strips / trim panels / extensions; Removing and installing heat shield for floor.
  1. ⚠ Hot steam/hot coolant can escape - risk of scalding. The cooling system is under pressure when the engine is hot. Cover filler cap on coolant expansion tank with a cloth and open carefully to dissipate pressure. — Cut through sealing tag (1) and open filler cap (3) on coolant expansion tank. [Note: Disregard (items 2, 4).]
  1. Place drip tray for workshop hoist VAS 6208 underneath.
  2. Disconnect high-voltage wire (3) and move it clear.
  3. Remove nut (1) and bolt (4).
  4. Remove potential equalisation line (2).
  1. ⚠ Risk of coolant entering high-voltage battery. The coolant hoses must only be disconnected from the high-voltage battery after the protective transportation cap for DC connector 12E 971 883 has been attached. — Attach protective transportation cap for DC connector (arrow) to connection for high-voltage wire.
  2. Clamp off coolant hoses with hose clamps up to 25 mm 3094.
  3. Lift retaining clips, disconnect coolant hoses (1, 2) from high-voltage battery and drain off coolant.
  4. Unplug electrical connectors (3, 4) and move clear.
  5. Move brake lines (1) and wiring harness (2) clear.
  6. Move fuel lines (1) clear.
  7. If fitted, move fuel line (2) for auxiliary heater clear.
  1. Set up scissor-type assembly platform VAS 6131 B with support set for Audi VAS 6131/10 and supplementary set VAS 6131/13 as follows:
  1. Initially hand-tighten the support elements on the scissor-type assembly platform.
  2. Place scissor-type assembly platform in horizontal position.
  1. Manoeuvre scissor-type assembly platform underneath high-voltage battery so it is perpendicular to direction of travel.
  2. Fit support elements from VAS 6131/10 on high-voltage battery at front, as shown in illustration.
  3. Fit support elements from VAS 6131/10 and VAS 6131/13 on high-voltage battery at rear, as shown in illustration.
  4. Make sure that threaded spindles are screwed in completely.
  5. Raise scissor-type assembly platform VAS 6131 B as far upwards as possible until support elements are slightly underneath high-voltage battery.
  6. Turn all spindles for support elements upwards until all locating lugs make contact with mounting points.
  7. Tighten base plates for support elements to 20 Nm on scissor-type assembly platform. — 20 Nm (15 lb-ft)
  8. Remove bolts (1).
  1. ⚠ Risk of damage to hose/line connections. Check that all hose and line connections between high-voltage battery and body have been released. Carefully guide high-voltage battery out of body when lowering. — Lower high-voltage battery (3) using scissor-type assembly platform. [Note: The high-voltage battery can be removed from the scissor-type assembly platform VAS 6131 B using the workshop hoist VAS 6100 without changing the position of the scissor-type assembly platform.]
  1. Leave the scissor-type assembly platform VAS 6131 B in the removal position so you can use it to reinstall the high-voltage battery. [Note: Renew bolts tightened with specified tightening angle.]
  1. ⚠ Danger of short circuit in the high-voltage battery if coolant leaks into the battery. The high-voltage battery cannot detect coolant leaking into the battery. If the coolant level in the expansion tank drops due to a leak and the warning lamp lights up, do NOT add any coolant until the cause of the leak has been found and eliminated. The sealing tag on the filler cap of the coolant expansion tank prevents the customer from adding coolant to the high-voltage cooling circuit independently. The notice on the filler cap provides an additional warning of the danger involved. The components of the power and control electronics for electric drive, charging unit for high-voltage battery, high-voltage heater and electric drive motor are also connected into the engine cooling system. — Fill up with coolant (see the separate procedure).
  2. Attach sealing tag to filler cap on coolant expansion tank (see the separate procedure).
  1. ⚠ High voltage can cause fatal injury. Danger of severe or fatal injuries from electric shock. The high-voltage system must be re-energised by a suitably qualified person (an Audi high-voltage technician). — Re-energise high-voltage system (see the separate procedure).

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.