TorqFix

Removing and installing high-pressure pump: vehicles up to 09.2005 — Audi A4 Cabriolet B6/B7 (8H) / A4 B6/B7 (8E) (BKN, BSG, BPP, ASB)

Removing and installing high-pressure pump — vehicles up to 09.2005 — Audi A4 Cabriolet B6/B7 (8H)… Read available instructions and vehicle application notes.

17 steps 4 engine codes 1 original source table

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A4 Cabriolet B6/B7 (8H), Audi A4 B6/B7 (8E)

  • Replacement notes from the steps (read the conditions below): Detach front bracket from high-pressure pump. [Note: Renew gaskets and seals.]

Don't miss

  • Remove central nut (1) for high-pressure pump shaft (use counterhold tool3036).
  • Renew gaskets and seals.
  • A new high-pressure pump must first be filled with fuel before the engine is started. The high-pressure pump must not be allowed to run while still empty. Bleeding fuel system — Install toothed belt for high-pressure pump.

🔧 Engine codes recorded for this source

📋 Procedure

  1. ⚠ Always read rules for cleanliness and instructions for working on fuel system .Follow these instructions and rules for cleanliness before starting work and while working on the fuel system. — Remove intake manifold (top section) (see the separate procedure).
  2. Remove bottom section of intake manifold (left-side) (see the separate procedure).
  3. Remove toothed belt for high-pressure pump (see the separate procedure).
  4. Remove central nut (1) for high-pressure pump shaft (use counterhold tool 3036).
  5. Use puller T40064 to pull off belt sprocket for high-pressure pump.
  6. Remove bolts (arrows) and detach toothed belt cover (rear).
  7. Remove bolts (arrow) and take off connecting pipe for exhaust gas recirculation.
  8. Disconnect fuel supply line (2) and fuel return line (1) from high-pressure pump and move lines clear to the side.
  9. Unplug electrical connector (1).
  10. Remove bolts (arrows).
  11. Take off high-pressure pump together with front bracket.
  12. Remove bolts (arrows).
  13. Detach front bracket from high-pressure pump. [Note: Renew gaskets and seals.]
  1. ⚠ A new high-pressure pump must first be filled with fuel before the engine is started. The high-pressure pump must not be allowed to run while still empty. Bleeding fuel system — Install toothed belt for high-pressure pump.
  2. Install bottom section of intake manifold (left-side) (see the separate procedure).
  3. Install intake manifold (top section) (see the separate procedure).
  4. Bleed fuel system and check for leaks (see the separate procedure).

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.