Models recorded for this source: Audi A6/A7 C7 (4G, 2011–2018)
- Special tools named: T40263
- Replacement notes from the steps (read the conditions below): Renew O-ring for high-pressure pump. Check roller tappet (1) for damage and renew if necessary.
Don't miss
- The roller tappet must be positioned at the lowest point when installing the high-pressure pump.
- The high-pressure pump can be damaged if it is tightened too much on one side (keep it straight).
- Disregard (item 4).
🔩 Torque settings
Values can differ between engine variants — check the code stamped on your block.
| Torque | Fastener / step |
|---|---|
| 5 Nm (3.7 lb-ft) | Then initially tighten securing bolts alternately to 5 Nm (do not tilt high-pressure pump). [Note: The high-pressure pump can be damaged if it is tightened too much on one side (keep it straight).] |
ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.
📋 Procedure
- ⚠ The fuel system operates at extremely high pressure. This can cause injury. The fuel pressure in the high-pressure section of the injection system must be reduced to a residual pressure prior to opening the system .Wrap a clean cloth around the connection and carefully loosen the connection to allow the residual pressure to dissipate. — Reduce fuel pressure in high-pressure section of injection system (see the separate procedure).
- Remove air cleaner housing (see the separate procedure).
- Unscrew nuts (arrows) and remove guard plate (1).
- Unplug electrical connectors (1) and (6).
- Remove bolt (3) on retaining clip.
- Unscrew connections (2) and (5).
- Remove bolts (arrows).
- Carefully pull out high-pressure pump. It is possible that the roller tappet may remain lodged inside. [Note: Disregard (item 4).Do not bend fuel pipes to a different shape. Do NOT bend open retaining clamps for fuel pipe. If one of the retaining clamps has been bent open or the fuel pipe has to be renewed, the retaining clamps must also be renewed.]
- Pull roller tappet (1) out of housing. [Note: The connections of the high-pressure pipe must not be damaged. Do not bend fuel pipes to a different shape. Do NOT bend open retaining clamps for fuel pipe. If one of the retaining clamps has been bent open or the fuel pipe has to be renewed, the retaining clamps must also be renewed.]
- Renew O-ring for high-pressure pump.
- Check roller tappet (1) for damage and renew if necessary.
- Lightly lubricate roller tappet with oil and insert it so that lug (arrow A) slides into guide notch (arrow B). [Note: The roller tappet must be positioned at the lowest point when installing the high-pressure pump.]
- Fit turning-over tool T40272 onto wrench (21 mm)T40263.
- Position adapter on bolts of vibration damper.
- Rotate crankshaft in direction of normal engine rotation (arrow) using wrench (21 mm)T40263 and turning-over tool T40272, and at the same time press roller tappet into housing until it reaches lowest point.
- Only lift high-pressure pipe slightly to fit high-pressure pump.
- Insert high-pressure pump into housing.
- Press high-pressure pump down by hand as far as possible onto stop.
- Hand-tighten the bolts (arrows) as far as the flange.
- Then initially tighten securing bolts alternately to 5 Nm (do not tilt high-pressure pump). [Note: The high-pressure pump can be damaged if it is tightened too much on one side (keep it straight).] — 5 Nm (3.7 lb-ft)
- Tighten union nut (5) on fuel supply line hand-tight. Align so that parts are free of tension.
- Connect fuel supply hose (2) again.
- Tighten bolt (3) on retaining clip.
- Plug in electrical connectors (1) and (6). [Note: Disregard (item 4).]
- Tighten high-pressure pipe to specified torque (value given in the factory table, not available here).
- Install guard plate (1).
- Install air cleaner housing (see the separate procedure).
- Check fuel system for leaks (see the separate procedure).
📐 4 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other AUDI procedures
- Bleeding fuel system after installing high-pressure pump
- Bleeding fuel system after installing high-pressure pump - vehicles with engine codes BMK, BPP, BSG, BNG, ASB
- Bleeding fuel system after installing high-pressure pump - vehicles with engine codes BUG and BUN
- Checking flow rate at high-pressure pump
- Checking fuel low-pressure at high-pressure pump
- Checking fuel pressure and residual pressure (up to high-pressure pump)
- Removing and installing activated charcoal filter - NAR vehicles
- Removing and installing Lambda probe G39 – Audi A1
- Removing and installing combination valve (right-side)
- Removing and installing Lambda probe after catalytic converter G130
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.