TorqFix

Removing and installing coolant pipes (at side): Audi A4 Cabriolet B6/B7 / A4 B6/B7 2.0 (BGB, BPG, BPJ, BUL, …)

Step-by-step removing and installing coolant pipes (at side) for the Audi A4 Cabriolet B6/B7 / A4 B6/B7 2.0: 17 steps.

Workshop procedure for AUDI — the exact step sequence and torque figures, straight from real workshop data.

17 steps 7 engine codes engine codes merged from 2 documented variants

🧭 Before you start

Fits: Audi A4 Cabriolet B6/B7 (8H), Audi A4 B6/B7 (8E)

  • Renewed: gaskets

Don't miss

  • Renew gaskets and seals.Secure all hose connections with the correct type of hose clips (same as original equipment) Parts catalogue.
  • Before installing, clean and smoothen sealing surface for O-ring.

🔧 Engine codes this applies to

📐 5 workshop diagrams for BGB

Real factory drawings for this job — timing marks, bolt locations and routing. Locked in the free view.

Removing and installing coolant pipes (at side) — BGB · diagram 1
Removing and installing coolant pipes (at side) — BGB · diagram 2
Removing and installing coolant pipes (at side) — BGB · diagram 3
Removing and installing coolant pipes (at side) — BGB · diagram 4
Removing and installing coolant pipes (at side) — BGB · diagram 5

📋 Procedure

  1. ⚠ Hot steam/hot coolant can escape - risk of scalding.The cooling system is under pressure when the engine is hot.To allow pressure to dissipate, cover filler cap on coolant expansion tank with cloth and open carefully. — Open filler cap on coolant expansion tank
  2. Pull off engine cover panel (arrows).
  3. Vehicles with auxiliary heater: remove bolts (arrows) securing exhaust pipe for auxiliary/additional heater to noise insulation.
  4. Release quick-release fasteners (1) and (2) and take off front noise insulation.
  5. If fitted, open quick-release fasteners (3) and remove rear noise insulation.
BGB? Steps differ between engine variants — check this job against your exact car before you commit to it. Check my car — free →
  1. Drain off coolant .
  2. Disconnect coolant hoses (1 and 2) from coolant expansion tank.
  3. Unbolt coolant expansion tank (arrow).
  4. Unplug electrical connector for coolant shortage indicator switch F66 at bottom of coolant expansion tank and take out switch.
  5. Detach charge air hose (arrow) from intake manifold.
  6. Unbolt bracket for connectors (arrows) from coolant pipe.
  7. Detach wiring harness from coolant pipes.
  8. Disconnect coolant hoses (arrows).
  9. Remove bolts (1 ... 3) and detach coolant pipes. [Note: Renew gaskets and seals.Secure all hose connections with the correct type of hose clips (same as original equipment) Parts catalogue.]
  10. Before installing, clean and smoothen sealing surface for O-ring.
  11. Lubricate new O-ring with G12+ and slide onto coolant pipe.
  12. Fill up with coolant .
Workshop diagrams

Ask TorqFix about your Audi BGB — it answers with the exact sequence for that engine and the workshop drawing for each step. First question is free after a 20-second sign-up, no card.

Ask about your Audi BGB — free → or sign up free to see the drawings

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

The figures on this page come from manufacturer workshop documentation and are shown as they are. The page is assembled automatically from that data — it is not written by an AI. The AI works in the chat, where it answers for your specific car. It writes nothing here.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix →

Workshop data on this page last updated 20 Sep 2026.