Removing and installing bottom section of intake manifold (right-side), cylinder bank 1: Audi Q7 (4L) (BTR, CCFA, CCFC)
Removing and installing bottom section of intake manifold (right-side), cylinder bank 1 — Audi Q7… Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi Q7 (4L, 2005–2015)
- Opens: coolant
- Replacement notes from the steps (read the conditions below): Unscrew bolts (arrows) and remove bottom section of intake manifold (right-side) with intake manifold flap motorV157. [Note: Renew seals and/or gaskets.]
Don't miss
- Renew seals and/or gaskets.
- Risk of irreparable damage to engine.Block off the openings of the intake ports with a clean cloth to prevent small items from dropping into the engine. — Install exhaust gas recirculation control motor V338 with connection 26.
📋 Procedure
- Remove intake manifold (top section) (see the separate procedure).
- Drain coolant (repair group 19).
- Remove bolts (1 and 2) from coolant pipe.
- Disconnect coolant pipe (arrow) and move it clear to one side.
- Remove bolt (1) on retaining clip.
- Remove bolts (1 and 2).
- Carefully press exhaust gas recirculation control motor V338 with connection to one side until bolts at intake manifold (bottom section) are accessible.
- Move fuel hose clear.
- Unplug electrical connector (1) at intake manifold flap motor V157.
- Unscrew bolts (arrows) and remove bottom section of intake manifold (right-side) with intake manifold flap motor V157. [Note: Renew seals and/or gaskets.]
- ⚠ Risk of irreparable damage to engine. Block off the openings of the intake ports with a clean cloth to prevent small items from dropping into the engine. — Install exhaust gas recirculation control motor V338 with connection (repair group 26).
- Install coolant pipe (top) for exhaust gas recirculation (repair group 26).
- Install intake manifold (top section) (see the separate procedure).
Other AUDI procedures
- Removing and installing bottom section of intake manifold, cylinder bank 1 (right-side)
- Exploded view - intake manifold (bottom section), fuel rail and injectors
- Exploded view - intake manifold (bottom section) with fuel rail
- Intake manifold (bottom section) - exploded view
- Intake manifold (bottom section), fuel rail and injectors - exploded view
- Intake manifold (bottom section), fuel rail, injector - exploded view
- Removing and installing exhaust gas recirculation control motor 2V339
- Removing and installing air filter element (left-side), cylinder bank 2
- Checking fuel system pressurisation pump G6, vehicles with 3.0 ltr. (V6) or 4.2 ltr. (V8) engine from 06.2010 onwards
- Removing and installing misfuelling prevention device – Audi
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.