TorqFix

Pulling spur gear off crankshaft and shrink-fitting new spur gear — AUDI

Pulling spur gear off crankshaft and shrink-fitting new spur gear on Audi: 15 steps, engines AVB, AVF, AWX, BKE.

Workshop procedure for AUDI — the exact step sequence and torque figures, straight from real workshop data.

15 steps 40 engine codes engine codes merged from 10 documented variants

🧭 Before you start

Fits: Audi A3 (8P, 2003–2012)

  • Timing position: the crankshaft or camshaft is set and locked during this job
  • Special tools named: T10392/1, T10392, VAS 6519/1, puller

Don't miss

  • Take care not to damage the teeth of the spur gear.
  • With the aid of fitting tool10 - 203, slide spur gear by hand onto end of crankshaft as far as stop. This must be done without delay, taking care to keep the gear straight.

📋 Procedure

  1. Remove sealing flange (pulley end) (see the separate procedure).
  2. Remove sump (see the separate procedure). [Note: If the balance shaft assembly does not have to be renewed, it is sufficient just to remove the idler gear. If the bolt for the idler gear for the balance shaft assembly has been slackened or the spur gear on the crankshaft or the crankshaft itself have been renewed, you must install a new idler gear with the appropriate coating. Procedure for installation Installing a new balance shaft assembly.]
  3. Remove idler gear for balance shaft assembly or remove balance shaft assembly (see the separate procedure).
  4. Insert thrust piece T10392/1 in end of crankshaft.
  5. Insert puller T10392 in holes in spur gear, turn clockwise (arrow) and screw in locking pins (A).
AVB? Steps differ between engine variants — check this job against your exact car before you commit to it. Check my car — free →
  1. Counterhold crankshaft with ring spanner (A) and pull spur gear off end of crankshaft by screwing in spindle with ring spanner (B). [Note: While heating up the new spur gear, monitor the temperature with the temperature gauge VAS 6519.When the temperature reaches 200 ℃, you have approx. 4 seconds to fit the spur gear on the crankshaft.A higher temperature increases the amount of time available (220 ℃ = approx. 6 seconds).Make sure the end of the crankshaft is clean.]
  2. ⚠ Do not exceed a maximum temperature of 240 ℃; otherwise the spur gear can become discoloured and distorted. — Place the new spur gear flat on a hotplate (commercially available) and heat it to at least 200 ℃, but not more than 240 ℃. The lettering must face upwards.
  3. Set temperature gauge VAS 6519 to measuring range 2.
  4. Position temperature sensor VAS 6519/1 on collar of spur gear (as shown) and read off temperature at temperature gauge.
  5. ⚠ Risk of burns. Use suitable protective gloves for the following steps. — When the required temperature has been reached, pick up the spur gear with pliers as illustrated. [Note: Take care not to damage the teeth of the spur gear.]
  6. With the aid of fitting tool10 - 203, slide spur gear by hand onto end of crankshaft as far as stop. This must be done without delay, taking care to keep the gear straight.
  7. Wait a few minutes to allow the spur gear to cool down.
  8. Install balance shaft assembly Installing a new balance shaft assembly.
  9. Install idler gear for balance shaft assembly Installing a new balance shaft assembly.
  10. Install sealing flange (pulley end) (see the separate procedure).

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

The figures on this page come from manufacturer workshop documentation and are shown as they are. The page is assembled automatically from that data — it is not written by an AI. The AI works in the chat, where it answers for your specific car. It writes nothing here.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.