TorqFix

Renewing seals for right flange shaft or stub shaft: front-wheel drive — VW

Renewing seals for right flange shaft or stub shaft — front-wheel drive — VW. Read available instructions and vehicle application notes.

21 steps 1 torque figure

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: VW Passat CC (357, 2008–2012), VW Sharan II / SEAT Alhambra (7N, 2010–), VW Touran I (1T, 2003–2015), VW Golf V / Jetta (1K, 2003–2009), VW Passat B6 (3C, 2005–2010), VW Golf VI (5K, 2008–2013)

  • Replacement notes from the steps (read the conditions below): Renew O-ring of stub shaft.

🔩 Torque settings

Values can differ between engine variants — check the code stamped on your block.

TorqueFastener / step
30 Nm (22 lb-ft)Screw in new countersunk bolt for securing stub shaft or flange shaft and tighten to 30 Nm.

ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.

📋 Procedure

  1. Remove right wheel.
  2. Remove noise insulation General body repairs, exterior 50. Noise insulation; Assembly overview - noise insulation.
  3. Remove right drive shaft Running gear, axles, steering 40. Repairing drive shafts; Removing and installing drive shafts.
  1. After removing right drive shaft (A), unbolt intermediate shaft (B) from bearing bracket (C)(arrows) and pull out stub shaft of gearbox.
  1. Place drip tray under gearbox.
  2. Remove securing bolts (arrow) for stub shaft or flange shaft.
  3. Pull out stub shaft or flange shaft together with compression spring.
  4. Pry seal out using assembly lever.
  1. Lightly oil outer circumference of new oil seal.
  2. Half-fill space between sealing lip and dust lip with sealing greaseG 052 128.
  3. Drive in new seal to stop, being careful not to cant seal.
  4. Insert stub shaft or flange shaft.
  5. Screw in new countersunk bolt for securing stub shaft or flange shaft and tighten to 30 Nm. — 30 Nm (22 lb-ft)
  1. Renew O-ring of stub shaft.
  2. Grease splines of stub shaft with grease for clutch plate splinesG 000 100.
  3. Guide intermediate shaft (B) through bearing bracket (C) onto stub shaft of gearbox.
  4. Bolt intermediate shaft to bearing bracket to specified torque (arrows)Running gear, axles, steering 40. Repairing drive shaft; Removing and installing drive shafts.
  1. Install right drive shaft Running gear, axles, steering 40. Repairing drive shaft; Removing and installing drive shafts.
  2. Install right wheel Running gear, axles, steering 44. Torque settings for mounting wheels.
  3. Check oil level and top up (see the separate procedure).
  4. Install noise insulation General body repairs, exterior 50. Noise insulation; Assembly overview - noise insulation.

📐 3 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 3 workshop diagrams for this job Ask about your VW — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.