TorqFix

Removing and installing sump (bottom section): VW Jetta VI (16) (CPLA, CPPA, CPKA, CPRA)

Removing and installing sump (bottom section) — VW Jetta VI (16) (CPLA, CPPA, CPKA, CPRA). 13 source steps. Check the document conditions against your vehicle.

13 steps 4 engine codes Showing one source document; this title group contains 2 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: VW Jetta VI (16, 2010–2018)

  • Replacement notes from the steps (read the conditions below): Unscrew bolt (1), and remove baffle plate (2). [Note: Observe use-by date of silicone sealant.The sump must be installed within 5 minutes of applying silicone sealing compound.Renew bolts tightened with turning further angle.Renew gaskets, oil seals and self-locking nuts.]

Don't miss

  • Observe use-by date of silicone sealant.The sump must be installed within 5 minutes of applying silicone sealing compound.Renew bolts tightened with turning further angle.Renew gaskets, oil seals and self-locking nuts.
  • Sealing surfaces must be free of oil and grease.
  • Cut off nozzle on tube at front marking (diameter of nozzle: approx. 3 mm).
  • The sump must be installed within 5 minutes after applying the silicone sealant.The bead of sealant must not be thicker than specified, otherwise excess sealant can enter the sump and obstruct the strainer in the oil intake pipe.

🔧 Engine codes recorded for this source

📋 Procedure

  1. Remove oil level and oil temperature sender G266.
  2. Remove bolts (1) to (20).
  3. Carefully detach sump (bottom section) from adhesive bond.
  4. Unscrew bolt (1), and remove baffle plate (2). [Note: Observe use-by date of silicone sealant. The sump must be installed within 5 minutes of applying silicone sealing compound. Renew bolts tightened with turning further angle. Renew gaskets, oil seals and self-locking nuts.]
  1. Install new baffle plate, specified torque (value given in the factory table, not available here).
  2. Spray sealing surface with sealant remover and leave to act.
  3. Remove sealant residues from sump (top section) with a flat scraper.
  4. Remove sealant residue from sump (bottom section), e.g. with rotating plastic brush.
  5. Sealing surfaces must be free of oil and grease.
  6. Cut off nozzle on tube at front marking (diameter of nozzle: approx. 3 mm).
  7. Apply the bead of silicone sealant onto the clean sealing surface of the sump (bottom section), as illustrated. [Note: The sump must be installed within 5 minutes after applying the silicone sealant. The bead of sealant must not be thicker than specified, otherwise excess sealant can enter the sump and obstruct the strainer in the oil intake pipe.] [Note: Let sealing compound dry for approx. 30 minutes after installing oil sump. Only then fill with engine oil.]
  1. Fit sump (bottom section) immediately and tighten bolts (tightening sequence ).
  2. Replenish engine oil and check oil level 821.

📐 5 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 5 workshop diagrams for this job Ask about your VW CPLA — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.