Removing and installing reduction agent delivery line: VW Passat CC (357) / Passat B6 (3C) (CBAC)
Removing and installing reduction agent delivery line — VW Passat CC (357) / Passat B6 (3C) (CBAC). Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Passat CC (357, 2008–2012), VW Passat B6 (3C, 2005–2010)
🔧 Engine codes recorded for this source
📋 Procedure
- ⚠ The reduction agent can irritate skin, eyes and respiratory organs. After skin contact with this agent, wash immediately with plenty of water. If necessary seek advice from a doctor. — Remove left underbody panel.
- Remove heat shield above rear axle.
- Open clips of delivery line, open upper part in direction of (arrow) for this.
- ⚠ Protect separated electrical connections against wetting from reduction agent by suitable means, e.g. plastic bag and cable ties. Electrical connections may be damaged due to the high penetration ability along with subsequent crystallisation of the reduction agent. — Unclip wiring connection from retainer above rear axle and disconnect electrical connector (B) of delivery line.
- First press securing clip for line connection together in direction of (arrow 1.) as shown, and pull off delivery line in direction of (arrow 2.) without tools and without »jerking«.
- ⚠ Immediately seal all openings and unions using suitable plugs to stop ingress of dirt. The smallest particle of dirt can cause extensive damage to the system. — First press securing clip for line connection on injector for reduction agent N474 together in direction of (arrow 1.) as shown, and pull off delivery line in direction of (arrow 2.) without tools and without »jerking«.
- Carefully release delivery line, pull it out of remaining clips and remove it.
- ⚠ The delivery line is pre-formed and is equipped with a heater element over the complete length. Ensure the line is not kinked, twisted or stretched. Otherwise, the heater element and thereby the supply line will be damaged. — Guide delivery line carefully behind brake lines and wiring harness for electromechanical parking brake (arrows) above rear axle.
- Remove sealing plugs and connect delivery line to injector for reduction agent N474.
- Press delivery line into respective clips, working from front to rear.
- Close securing clips.
- Remove blanking plugs.
- Connect wire (B) and supply line (A) above rear axle. Secure both in their brackets on the body.
- Reinstall heat shield above rear axle.
- Reinstall underbody panel on driver's side.
Other VW procedures
- Removing and installing rear section of reduction agent supply line
- Removing and installing reducing agent delivery line – VW CFFA
- Removing and installing reduction agent supply line – VW CATA
- Checking delivery pressure in fuel return line – VW 1.2 TDI
- Checking delivery pressure in the fuel return line (CFWA)
- Disconnecting reducing agent supply line
- Removing and installing heater element (heater cup) – VW CBAC
- Removing and installing anti-theft engine control unit, Eos
- Removing and installing engine speed sender
- Removing and installing engine control unit, Golf Plus
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.