Removing and installing heat exchanger for high-voltage battery: VW Golf VII Variant (BA) / Golf VII (5G)
Removing and installing heat exchanger for high-voltage battery — VW Golf VII Variant (BA) / Golf… Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Golf VII Variant (BA), VW Golf VII (5G, 2012–2020)
- Special tools named: 3094
- Replacement notes from the steps (read the conditions below): Renew seals (D); for correct version refer to Electronic Parts Catalogue.
- Also covered elsewhere: Electronic Parts Catalogue
Don't miss
- To prevent the intrusion of moisture, all components of the refrigerant circuit which have been opened must be sealed with suitable plugs.
- The heat exchanger is designed for a particular direction of flow of the coolant. Therefore, the coolant hoses must not be interchanged when connecting them.
- Bracket (F) is secured to the heat exchanger (E) with two bolts (G).
- If fitted, check that dowel pin (4) is not damaged and is seated correctly.Moisten seals with refrigerant oil before installing .Make sure seals are seated correctly in groove of corresponding refrigerant line.
- Bracket (F) is secured to the heat exchanger (E) with two bolts (G). If the bolts (G) have been loosened, insert them, but do not tighten them yet.
🔩 Torque settings
Values can differ between engine variants — check the code stamped on your block.
| Torque | Fastener / step |
|---|---|
| 8 Nm (5.9 lb-ft) | Tighten bolts (G) (specified torque 8 Nm). |
| 8 Nm (5.9 lb-ft) | Tighten bolts (D) (specified torque 8 Nm). |
| 8 Nm (5.9 lb-ft) | Tighten bolts (F) (specified torque 8 Nm). |
ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.
📋 Procedure
- Observe safety precautions Safety precautions when handling refrigerants.
- Comply with notes Working on refrigerant circuit.
- Observe safety precautions Safety precautions when working on the cooling system.
- Observe safety precautions when working in the vicinity of high-voltage components Safety precautions when working in the vicinity of high-voltage components.
- Observe the risk category of the high-voltage system 00Risk category of the high-voltage system.
- Extract refrigerant using air conditioner service station before opening refrigerant circuit. [Note: To prevent the intrusion of moisture, all components of the refrigerant circuit which have been opened must be sealed with suitable plugs.]
- Switch off ignition.
- Open filler cap on coolant expansion tank for high-voltage system 19Cooling system, coolant.
- Detach coolant expansion tank for coolant circuit of engine from vehicle, and slightly tilt it to the side 19Cooling system, coolant.
- Clamp off coolant hoses (A) and (B) using hose clamps 3094. [Note: The heat exchanger is designed for a particular direction of flow of the coolant. Therefore, the coolant hoses must not be interchanged when connecting them.]
- Cover area beneath connections for coolant hoses on heat exchanger (E) with absorbent paper.
- Disconnect coolant hoses (A) and (B) from connections on heat exchanger (E).
- Seal open connections for coolant hoses on heat exchanger (E) with clean plugs from engine bung set VAS 6122.
- Remove bolts (F) on refrigerant lines to heat exchanger (E).
- Remove bolts (D).
- Detach heat exchanger (C) from refrigerant lines (B) and (C), and remove it together with bracket (F).
- Seal open connections for coolant hoses on heat exchanger (E) and refrigerant lines (B) and (C) with clean plugs from engine bung set VAS 6122. [Note: Bracket (F) is secured to the heat exchanger (E) with two bolts (G).]
- Renew seals (D); for correct version refer to Electronic Parts Catalogue.
- Check connections of refrigerant lines ((B) and (C)) and on heat exchanger (E) for soiling and damage.
- Insert seal (3) into groove (arrow) on connection of refrigerant line (1). [Note: If fitted, check that dowel pin (4) is not damaged and is seated correctly. Moisten seals with refrigerant oil before installing .Make sure seals are seated correctly in groove of corresponding refrigerant line.]
- Bracket (F) is secured to the heat exchanger (E) with two bolts (G). If the bolts (G) have been loosened, insert them, but do not tighten them yet.
- Install refrigerant lines (B) and (C) to heat exchanger (E), and secure them with bolts (A) (do not tighten bolts (A) yet).
- Align heat exchanger (E) free of stress, and insert bolts (D).
- Tighten bolts (G) (specified torque 8 Nm). — 8 Nm (5.9 lb-ft)
- Tighten bolts (D) (specified torque 8 Nm). — 8 Nm (5.9 lb-ft)
- Tighten bolts (F) (specified torque 8 Nm). — 8 Nm (5.9 lb-ft)
- Connect coolant hoses (A) and (B) to connections on heat exchanger (E).
- Fill coolant in coolant expansion tank for high-voltage system 19Cooling system, coolant.
- Slightly increase pressure in coolant expansion tank for high-voltage system using e.g. cooling system tester V.A.G 1274 B19Cooling system, coolant.
- Carefully open bleeder valve (C).
- Carefully open hose clamp 3094 on coolant hose (A), and let coolant flow into heat exchanger (E).
- As soon as coolant escapes from bleeder valve (C), close bleeder valve (C). [Note: If the heat exchanger for high-voltage battery (E) has been removed and installed as described above, there should not be any air in the coolant circuit of the high-voltage system. If, however, there is still air in the coolant circuit, bleed coolant circuit 19Cooling system, coolant.]
- If necessary, fill coolant in coolant expansion tank for high-voltage system 19Cooling system, coolant.
- Remove hose clamp 3094, and reinstall all components which have been removed or detached.
- The remaining steps for installation are carried out in reverse order.
- As a final step, read event memory, and clear any entries displayed using cooling system tester in "“Guided fault finding”" mode.
📐 3 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- Heat exchanger for high-voltage battery VX63 with refrigerant shut-off valve for high-voltage battery heat exchanger N542
- Heat exchanger for high-voltage batteryVX63 with refrigerant shut-off valve for high-voltage battery heat exchanger N542
- Removing and installing heat exchanger for high voltage battery VX63
- Removing and installing refrigerant line between condenser and heat exchanger for high-voltage battery, refrigerant line with internal heat exchanger, Passat GTE
- Removing and installing refrigerant line between electrical air conditioner compressor V470 and heat exchanger for high-voltage battery, refrigerant line with internal heat exchanger, Passat GTE
- Removing and installing heat exchanger for high voltage batteryVX63
- Removing engine
- Removing and installing camshaft – VW Golf Cabriolet
- Adjusting valve timing – VW Passat B5
- Removing and installing camshafts – VW Passat B6
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.