Special tools, workshop equipment, test and measuring appliances and aux. items required
10-222 A Support
10-222 A/2 Special hook
10-222 A/6 Supports
10-222 A/7 Auxiliary hooks
3299 Ribbed belt lever
V.A.G 1383 A Engine/gearbox jack
Special tools, workshop equipment, test and measuring appliances and aux. items required
3257 Socket, 27 mm AF
3282 Gearbox support
3282/16 Adjustment plate
3336 Gearbox lifting beam
V.A.G 1331 Torque wrench
V.A.G 1332 Torque wrench
Special tools, workshop equipment, testers, measuring instruments and auxiliary items required
2024 A/2 Lifting eye
VAS 5085 Step-ladder
Additional information
Workshop Manual Transporter 1991 ▸, Running gear, axles, steering from January 1996
Workshop Manual Transporter 1991 ▸, Electrical system
Workshop Manual Transporter 1991 ▸, 5-Cyl. diesel engine, mechanics
Workshop Manual Transporter 1991 ▸, 5-Cyl. injection engine, mechanics
Removing
For vehicles with coded radio obtain radio code.
Remove battery covering.
With the ignition switched off disconnect the battery earth strap (in engine compartment and if fitted, under driver's side).
=> Electrical system; Repair group 27; Battery; Removing and installing battery
Electrical system
Battery
Removing and installing battery
With the vehicle resting on its wheels loosen left-hand wheel hub/drive shaft bolt and left and right-hand wheel securing bolts.
Lift vehicle until the load on the front axle is relieved.
Remove front wheels.
Remove hexagon bolt for drive shaft/wheel hub.
Raise vehicle.
Measure lengthof thread from nut to face of torsion bar threaded rod -a- and note value.
Relieve tension on torsion bar with special tool 3257.
=> Running gear, axles, steering from January 1996; Repair group 40; I - Removing and installing subframe, anti-roll bar, torsion bar, wishbone, shock absorber; Removing and installing torsion bar/Adjusting torsion bar
Running gear, axles, steering from January 1996
I - Removing and installing subframe, anti-roll bar, torsion bar, wishbone, shock absorber
Removing and installing torsion bar/Adjusting torsion bar
Remove noise insulation tray below engine/gearbox.
Remove left-hand drive shaft as follows:
Remove bolt for left-hand shock absorber/anti-roll bar coupling rod.
Push shock absorbers completely together.
Disconnect drive shaft at flange.
Separate left-hand lower wheel bearing housing swivel joint bolted connection, thereby support swivel joint, e.g. with gearbox jack V.A.G 1383 A so that it does not drop down quickly.
1 -
14 mm AF multi-point socket bit, e.g. Hazet 990
Take drive shaft out.
Disconnect right-hand drive shaft at flange.
Remove bolt for right-hand shock absorber/anti-roll bar coupling rod.
Push right-hand shock absorber completely together.
Raise right drive shaft and secure.
Remove earth strap from gearbox and mounting bracket.
Remove all electrical connections from gearbox and starter motor.
=> Electrical system; Repair group 27; Starter motor; Removing and installing starter motor
Electrical system
Starter motor
Removing and installing starter motor
Unscrew speedometer drive shaft cable or remove sender connector and speedometer sender.
If so attached detach electrical wiring from coolant hoses.
Detach coolant piping at starter motor (arrows) (from expansion tank to water pump).
Remove wiring loom from pipework.
Remove starter.
=> Electrical system; Repair group 27; Starter motor; Removing and installing starter motor
Electrical system
Starter motor
Removing and installing starter motor
Remove selector mechanism from gearbox as follows:
Remove swivel head (arrow 1).
Lever front selector rod off gearbox selector lever (arrow 2).
Unbolt mounting bracket with gate rod (arrow 3).
Tie-up selector and gate rods.
Vehicles with mechanical clutch control
Detach clutch cable at gearbox and at gearbox mounting bracket => Page
30-35.
Vehicles with air conditioning system
Release tension in ribbed V-belt and take belt off alternator and compressor.
=> 5-Cyl. injection engine Mechanics; Repair group Gr. 13
=> 5-Cyl. diesel engine Mechanics; Repair group 13
5-Cyl. diesel engine Mechanics
Removing alternator.
=> Electrical system; Repair group 27
Electrical system
Remove compressor from mounting bracket and secure to body so that the hoses are stress free.
Warnin
The air conditioning refrigerant circuit must not be opened. The refrigerant hoses are prone to kinking.
=> Heating, air conditioning system; Repair group Gr. 87
Note:
When removing gearbox or moving engine/gearbox assembly, there is a danger of damaging the air conditioner refrigerant circuit pressure switch.
Detach refrigerant hose (arrow 1) from front right-hand longitudinal member between air conditioning system sight glass/pressure switch and fluid container to do this remove bolt for clamp (arrow 2).
Vehicles with 5-Cyl. injection engine
Remove Lambda probe from front exhaust pipe if fitted.
Remove front exhaust stop plate.
=> 5-Cyl. Diesel engine, Mechanics; Repair group 26; Removing and installing parts of exhaust system.
5-Cyl. Diesel engine, Mechanics
Removing and installing parts of exhaust system.
Separate front exhaust pipe at catalyst.
=> 5-Cyl. Diesel engine, Mechanics; Repair group 26; Removing and installing parts of exhaust system.
5-Cyl. Diesel engine, Mechanics
Removing and installing parts of exhaust system.
Vehicles with 5-Cyl. diesel engine
Remove front exhaust pipe
=> 5-Cyl. Diesel engine, Mechanics; Repair group 26; Removing and installing parts of exhaust system
5-Cyl. Diesel engine, Mechanics
Removing and installing parts of exhaust system
Continued for all vehicles
Remove front propshaft =>Page
39-100.
Remove gearbox carrier -A- from engine and bevel box -B-.
Remove pendulum support -1-; to do this, remove bolts -arrow A- and -arrow B-.
Remove bolts -3- and separate flexible joint/heat shield from bevel box output flange.
Remove engine/gearbox hexagon socket head bolt (arrow).
Remove upper engine/gearbox connecting bolts (arrows A, B, C and D).
Note:
Remove cover plate when removing bolts -C- and -D-.
Fit support device 10-222A in conjunction with hooks 10-222 A/6.
Hook additional hook 10-222 A/7 in bracket on engine.
Pretension engine/gearbox assembly via spindles.
On vehicles with 5 cylinder injection engine, pull connector off spark plug for No. 2 cylinder and bolt lifting eye 2024 A/2 onto engine block in addition.
A - 2 mm thick washer
Assemble gearbox jack V.A.G 1383A with gearbox support 3282, adjustment plate 3282/16 for "02D" gearbox and support elements as follows:
Place adjustment plate 3282/16 on gearbox support 3282. (Adjustment plate only fits in one position).
Align arms of gearbox support according to holes in adjustment plate.
Bolt-on support elements -A-, as illustrated on adjustment plate.
Place gearbox jack with gearbox support under vehicle, arrow symbol -B-(=>Illustration V34-2976) on adjustment plate points to front of vehicle.
Align adjustment plate parallel to gearbox and lock safety supports on gearbox.
Unbolt gearbox mounting from body (arrow 1).
Note:
To remove securing nuts use step-ladder VAS 5085.
Carefully lower engine/gearbox assembly via spindles of support device and, at the same time, via the engine/gearbox jack V.A.G 1383 A.
Unbolt bearing block with gearbox mounting from gearbox (arrow 2).
Vehicles with hydraulic clutch control
Remove slave cylinder (arrows) and place to side, secure with wire, do not open system.
Note:
Do not depress clutch pedal.
Continued for all vehicles
Remove lower engine/gearbox securing bolts. Allocating the bolts => Page
34-91.
Press gearbox off engine and remove cover plate from between engine/gearbox.
Carefully lower gearbox and swing out.
Transporting the gearbox
When transporting the gearbox and also when setting up gearbox support 3282, the gearbox lifting beam 3336 should be used.
Bolt gearbox lifting device 3336 to clutch housing.
Set support beam on sliding piece with locking pin (arrow).
No. of holes visible = 15
Take gearbox out with workshop crane and gearbox lifting device 3336.
Installing
When replacing gearbox, the speedometer sender and gear selector lever must be transferred to the new assembly.
When replacing gearbox mounting allocate according to parts catalogue.
Clean input shaft splines and lightly grease with G000 100 grease.
Before installing gearbox, press clutch release lever towards gearbox housing and secure with assembly bolt or M 8 x 35 bolt. Remove after gearbox has been installed. The hole must then be sealed with a plug.
Check whether dowel sleeves for aligning engine/gearbox are fitted in cylinder block, install if necessary.
Assemble gearbox jack V.A.G 1383A with gearbox support 3282, adjustment plate 3282/16 for "02D" gearbox and support elements as follows:
Place adjustment plate 3282/16 on gearbox support 3282. (Adjustment plate only fits in one position).
Align arms of gearbox support according to holes in adjustment plate.
Bolt-on support elements -A-, as illustrated on adjustment plate.
Place gearbox on gearbox jack.
Align adjustment plate and gearbox parallel with one another and lock safety supports on gearbox.
Place gearbox jack under vehicle, arrow symbol -B- (=>Illustration V34-2976) on adjustment plate points to front of vehicle.
Align gearbox to engine and install fully.
When replacing the gearbox ensure that the intermediate plate is correctly positioned.
Install engine/gearbox lower securing bolts and tighten to prescribed torque; Allocation and torque setting of bolts=>table Page
34-92.
Vehicles with hydraulic clutch control
Install slave cylinder and tighten bolts -arrows- to torque setting => Page
30-9
, item (14).
Continued for all vehicles
Before lifting engine/gearbox, tighten bolts of bearing block (arrows 2) to torque setting => Page
34-91.
Carefully lift engine/gearbox assembly via spindles of support device 10-222 A and via engine/gearbox jack V.A.G 1383 A.
After lifting engine/gearbox, tighten nuts (arrows 1) to torque setting => Page
34-91.
Note:
To install securing nuts use step-ladder VAS 5085.
Warning!
Do not remove support until the bolts securing the left-hand gearbox mounting have been tightened to torque setting.
Remove gearbox mounting 3282 from gearbox.
Tighten engine/gearbox upper connecting bolts (arrows A, B, C and D) and tighten to torque setting => table Page
34-92.
Note:
Install cover plate when installing bolts -C- and -D-.
Tighten engine/gearbox hexagon socket head bolt (arrow) to torque setting => table Page
34-92.
Install flexible couping, heat shield and front propshaft to gearbox => Page
39-100.
Install pendulum support -1- and tighten bolts -arrow A- and -arrow B- to prescribed torque.
=> Axles, steering, suspension from January 1996; Repair group 40; I - Removing and installing subframe, anti-roll bar, torsion bar, wishbone and shock absorber
Axles, steering, suspension from January 1996
I - Removing and installing subframe, anti-roll bar, torsion bar, wishbone and shock absorber
Note:
Install engine/gearbox mountings stress-free.
=> Repair group 10; Removing and installing engine.
5-speed manual gearbox 02D four-wheel drive
Removing and installing engine.
Fit gearbox carrier -A- to engine and bevel box -B- => Page
34-129.
Fit front exhaust pipe to catalyst or front silencer.
=> 5-Cyl. Diesel engine, Mechanics; Repair group 26; Removing and installing parts of exhaust system.
5-Cyl. Diesel engine, Mechanics
Removing and installing parts of exhaust system.
=> 5-Cyl. Diesel engine, Mechanics; Repair group 26; Removing and installing parts of exhaust system
5-Cyl. Diesel engine, Mechanics
Removing and installing parts of exhaust system
Vehicles with air conditioner:
Install air conditioner compressor
=> Heating, air conditioning system; Repair group Gr. 87
Resecure refrigerant lines (illustration V34-2987, Page
34-104).
Warning
The air conditioning refrigerant circuit must not be opened. The refrigerant hoses are prone to kinking.
Installing alternator.
=> Electrical system; Repair group 27
Electrical system
Fit ribbed V-belts, when doing this, ensure correctly seated in belt pulleys.
=> 5-Cyl. injection engine Mechanics; Repair group Gr. 13
=> 5-Cyl. diesel engine Mechanics; Repair group 13
5-Cyl. diesel engine Mechanics
Vehicles with mechanical clutch control
Hook clutch cable onto gearbox and gearbox mounting bracket => Page
30-35.
Continued for all vehicles
Install selector mechanism to gearbox as follows:
Tighten mounting bracket with gate rod to torque setting =>Page
34-14
, item (15) (arrow 3).
Press front selector rod on gearbox selector lever (arrow 2).
Tighten swivel head to torque setting => Page
34-15
, item (18) (arrow 1).
Install starter motor/wiring.
=> Electrical system; Repair group 27; Starter motor; Removing and installing starter motor
Electrical system
Starter motor
Removing and installing starter motor
Install all electrical connections on gearbox and starter motor.
=> Electrical system; Repair group 27; Starter motor; Removing and installing starter motor
Electrical system
Starter motor
Removing and installing starter motor
Tighten coolant pipe at starter (arrows) (from expansion tank to water pump).
Install wiring harness to pipe.
If fitted, secure retainers for electrical wiring to coolant hoses.
Fit speedometer drive shaft cable or connector and speedometer sender.
Install earth strap to gearbox and mounting bracket.
Install left-hand drive shaft.
=> Running gear, axles, steering from January 1996; Repair group 40; III - Removing and installing wheel bearing and drive shaft
Running gear, axles, steering from January 1996
III - Removing and installing wheel bearing and drive shaft
Bolt right-hand drive shaft to flange shaft.
=> Running gear, axles, steering from January 1996; Repair group 40; III - Removing and installing wheel bearing and drive shaft
Running gear, axles, steering from January 1996
III - Removing and installing wheel bearing and drive shaft
Tighten bolt for right and left shock absorber/anti-roll bar coupling rod and tighten to prescribed torque.
=> Axles, steering, suspension from January 1996; Repair group 40; I - Removing and installing subframe, anti-roll bar, torsion bar, wishbone and shock absorber
Axles, steering, suspension from January 1996
I - Removing and installing subframe, anti-roll bar, torsion bar, wishbone and shock absorber
Connect left-hand lower wheel bearing housing swivel joint bolted connection and tighten to prescribed torque.
=> Running gear, axles, steering from January 1996; Repair group 40; II - Removing and installing upper and lower wishbones
Running gear, axles, steering from January 1996
II - Removing and installing upper and lower wishbones
Checking gear oil in gearbox and bevel box =>Page
34-132.
Fully depress clutch pedal, at least 5 times, onto stop on vehicles with mechanical clutch control then check function of adjustment mechanism => Page
30-38.
Adjust gear change mechanism => Page
34-27.
Install noise insulation tray below engine/gearbox.
Pretension torsion bar with special tool 3257 to dimension -a- (=> Page
34-100).
=> Running gear, axles, steering from January 1996; Repair group 40; I - Removing and installing subframe, anti-roll bar, torsion bar, wishbone, shock absorber; Removing and installing torsion bar/Adjusting torsion bar
Running gear, axles, steering from January 1996
I - Removing and installing subframe, anti-roll bar, torsion bar, wishbone, shock absorber
Removing and installing torsion bar/Adjusting torsion bar
Install front wheels.
=> Running gear, axles, steering from January 1996; Repair group 44; Wheel bolt torque settings
Running gear, axles, steering from January 1996
Wheel bolt torque settings
Reconnect earth strap to battery.
=> Electrical system; Repair group 27; Battery; Removing and installing battery
Electrical system
Battery
Removing and installing battery
Install battery covering.
Note:
Note radio coding for vehicles with coded radio.
Torque settings => Page
34-91.
TorqFix answers live for your specific car — tell it the engine code to check the available procedures, torque figures and wiring for that variant.
Ask about my car →Other VW procedures
- Removing and installing gearbox (Transporter with long front end)
- 5 and 6-speed manual gearbox 01E, 0A1 — Repairing end cover
- 6-speed manual gearbox 01E, 0A1 — Repairing end cover
- 6-speed manual gearbox 01E, four-wheel drive — Repairing end cover
- 7-speed dual clutch gearbox 0AM — Removing and installing oil seals at clutch end
- Assembly overview - cylinder block, gearbox end
- Removing engine
- Removing and installing camshaft – VW Golf Cabriolet
- Adjusting valve timing – VW Passat B5
- Removing and installing camshafts – VW Passat B6
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.