TorqFix

Removing and installing electric drive motor: VW Golf VI (5K)

Removing and installing electric drive motor — VW Golf VI (5K). 40 source steps and 12 torque figures. Check the document conditions against your vehicle.

40 steps 12 torque figures

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: VW Golf VI (5K, 2008–2013)

  • Opens: coolant
  • Special tools named: VAS 5085, VAS 6410
  • Replacement notes from the steps (read the conditions below): Renew all loosened nuts and bolts.

Don't miss

  • The wiring harness (1) and the gearbox temperature sensor are not installed in all vehicles.
  • Unscrew bolts (2) and (4) and remove retaining strap (1). Leave coolant pump (3) hanging with connected lines. Ensure correct position when installing.
  • Arrow (3) on clip (1) must point upwards.

🔩 Torque settings

Values can differ between engine variants — check the code stamped on your block.

TorqueFastener / step
8 Nm (5.9 lb-ft)Unscrew bolt (1) (8 Nm). Open hose bracket (3). Remove bracket (2).
50 Nm (37 lb-ft) + 45°Unscrew drive shafts (50 Nm + 45°).
40 Nm (30 lb-ft) + 90°Unscrew hexagon nut (1) (40 Nm + 90°). Remove hexagon bolt (2).
100 Nm (74 lb-ft) + 90°Unscrew hexagon nut (3) (100 Nm + 90°). Remove pendulum support (4).
6 Nm (4.4 lb-ft)Unscrew bolt (B) (6 Nm).
3 Nm (2.2 lb-ft)Unscrew bolt (3) (3 Nm), bolts (4), (5) (9 Nm), (6) and (7) (20 Nm) and remove bracket.
23 Nm (17 lb-ft)Unscrew nut (arrow) (23 Nm). Remove equipotential bonding conductors (1) and (2) from stud.
5 Nm (3.7 lb-ft)Unscrew nuts (arrows) (5 Nm) and remove cover (1) from power and control electronics for electric driveJX1.
15 Nm (11 lb-ft)Unscrew nuts (arrows) (15 Nm). Unscrew screw connections (1) (18 Nm) and remove high-voltage wires together with star for screening from power and control electronics for electric driveJX1.
15 Nm (11 lb-ft)Unscrew bolts (arrows) (15 Nm) and remove connections.
6 Nm (4.4 lb-ft)Unscrew bolts (arrows) (6 Nm) and remove insulating plate.
60 Nm (44 lb-ft) + 90°Loosen bolt (1) (60 Nm + 90°).

ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.

📋 Procedure

  1. ⚠ High voltage in the electric vehicle's high-voltage systemDanger of electric shock!Work on the high-voltage system is also necessary for the following work sequence. Now de-energise the high-voltage system (see the separate procedure). — De-energise high-voltage system
  2. Disconnect 12V battery.
  3. Clamp off coolant hose at top of electric drive motor V141 using hose clamp, up to Ø 25 mm 3094.
  4. Remove sound proofing General body repairs, exterior 50. Noise insulation.
  5. Remove front part of wheel housing liner General body repairs, exterior 66. Wheel housing liner.
  6. Release and remove electric drive motor V141.
  7. Unscrew air conditioner compressor and suspend using suitable piece of wire heating-ventilation-air conditioning system87.
  8. Unscrew bolt (1) (8 Nm). Open hose bracket (3). Remove bracket (2). — 8 Nm (5.9 lb-ft)
  9. Clamp off coolant hose at bottom of electric drive motor V141 using hose clamp, up to Ø 25 mm 3094.
  10. Drain coolant off by releasing clip (3) and disconnecting coolant pipe (2) at bottom from electric drive motor V141.
  11. Unscrew drive shafts (50 Nm + 45°). — 50 Nm (37 lb-ft) + 45°
  12. Unscrew hexagon nut (1) (40 Nm + 90°). Remove hexagon bolt (2). — 40 Nm (30 lb-ft) + 90°
  13. Unscrew hexagon nut (3) (100 Nm + 90°). Remove pendulum support (4). — 100 Nm (74 lb-ft) + 90°
  14. Release clip (1) and disconnect coolant pipe (2) at top from electric drive motor V141.
  15. Unscrew bolt (B) (6 Nm). — 6 Nm (4.4 lb-ft)
  16. Remove charger 3 for high-voltage batteryAX6 and lay to one side with coolant hoses connected.
  17. Open high-voltage wire bracket (1) and detach high-voltage wires.
  18. Unscrew bolt (3) (3 Nm), bolts (4), (5) (9 Nm), (6) and (7) (20 Nm) and remove bracket. — 3 Nm (2.2 lb-ft)
  19. Unscrew nut (arrow) (23 Nm). Remove equipotential bonding conductors (1) and (2) from stud. — 23 Nm (17 lb-ft)
  20. Disconnect high-voltage wire (arrow) from connection and distribution box 1SX1(1).
  21. Loosen bolts (arrows) and open connection and distribution box 1SX1.
  22. Undo screws (arrows). [Note: The wiring harness (1) and the gearbox temperature sensor are not installed in all vehicles.]
  1. Disconnect connector (arrow). Expose wiring harness (1) and route to gearbox.
  2. Open high-voltage wire bracket (1). Unscrew bolts (arrows) and remove bracket (2).
  3. Release fuses (arrows) and detach selector lever cable.
  4. Unscrew bolts (2) and (4) and remove retaining strap (1). Leave coolant pump (3) hanging with connected lines. Ensure correct position when installing.
  5. Unscrew nuts (arrows) (5 Nm) and remove cover (1) from power and control electronics for electric driveJX1. — 5 Nm (3.7 lb-ft)
  6. Unscrew nuts (arrows) (15 Nm). Unscrew screw connections (1) (18 Nm) and remove high-voltage wires together with star for screening from power and control electronics for electric driveJX1. — 15 Nm (11 lb-ft)
  7. Cut 3 screening stars (arrows) in order to avoid damaging high-voltage wires.
  8. Unscrew bolts (arrows) (15 Nm) and remove connections. — 15 Nm (11 lb-ft)
  9. Unscrew bolts (arrows) (6 Nm) and remove insulating plate. — 6 Nm (4.4 lb-ft)
  10. Loosen bolt (1) (60 Nm + 90°). — 60 Nm (44 lb-ft) + 90°
  11. Loosen bolt (1) (60 Nm + 90°). — 60 Nm (44 lb-ft) + 90°
  12. Position bracket for electric drive motor V141 on scissor-type assembly platform VAS 6131 A. Secure bracket under electric drive motor V141.
  13. Unscrew bolts from engine and gearbox mounting using stepladder VAS 5085.
  14. Slowly lower scissor-type assembly platform VAS 6131 A together with electric drive motor V141 and ensure free movement. [Note: The contact surfaces of the equipotential bonding conductor must be checked prior to installation. The contact surfaces must be clean, rust- and grease-free. Otherwise, repair the contact surfaces using the contact surface cleaning set VAS 6410Electrical system; General information 97. Contact surface cleaning set VAS 6410.]
  1. Note installation position of coolant pump.
  2. Arrow (3) on clip (1) must point upwards.
  3. Tighten all threaded connections to specified torques and seal with inspection lacquer.
  4. Renew all loosened nuts and bolts.

📐 24 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 24 workshop diagrams for this job Ask about your VW — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.