Removing and installing combustion chamber: VW Touareg II (7P)
Removing and installing combustion chamber — VW Touareg II (7P). 12 source steps. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Touareg II (7P, 2010–2018)
📋 Procedure
- Switch off electrical consumers.
- Switch off ignition.
- Remove auxiliary/supplementary heater (see the separate procedure).
- Dismantle auxiliary heater (see the separate procedure).
- Remove combustion air blower V6. [Note: Modified combustion chambers for diesel heaters and modified moulded gaskets for petrol heaters have been fitted since week 22 of 2011.Check that the version and allocation of these components is correct Electronic parts catalogue. Further relevant instructions are to be found in TPI 2029710/1.The two combustion chambers for diesel engines can be differentiated by the fitting connection for the glow plug for heater Q9.Version (A) was installed through week 21/2011, and version (B) beginning week 22/2011 Electronic parts catalogue. Beginning week 22 of 2011, the seals on the petrol heater have changed. Version (A) was installed through week 21/2011, and version (B) beginning week 22/2011. Refer to Electronic parts catalogue.]
- Heed the safety precautions Safety instructions.
- Also comply with general notes General notes.
- Observe repair instructions Repair notes.
- Pull combustion chamber (5) out of heat exchanger (2). [Note: Before installing combustion chamber (5), renew moulded gasket (4) (between combustion chamber and auxiliary heater).If the combustion chamber is defective, also renew the glow plug for heater Q9.Check the combustion chamber and renew it also if the glow plug for heater Q9 is defective. If deposits which influence burner operation have formed in the combustion chamber and cannot be removed using workshop equipment. This illustration shows a combustion chamber (5) with a round connection area, but the connection area of the combustion chamber (5) installed in this auxiliary heater is square Electronic parts catalogue.]
- Clean inside and outside of combustion chamber (5) with brass wire brush (spark plug brush) if necessary.
- Clean inside of heat exchanger (2) with brass wire brush (spark plug brush) if necessary.
- Check sealing surfaces of combustion chamber (5) and heat exchanger (2) for damage.
📐 1 workshop diagram for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- Renewing Teflon combustion chamber seal and support washer on injector
- Installing plenum chamber bulkhead – VW Touareg II
- Plenum chamber (air conditioning) - remove and install
- Removing and installing bulkhead of plenum chamber
- Removing and installing connection and distribution box 2SX2 in plenum chamber left
- Removing and installing E-box in plenum chamber on left – VW
- Removing engine
- Removing and installing camshaft – VW Golf Cabriolet
- Adjusting valve timing – VW Passat B5
- Removing and installing camshafts – VW Passat B6
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.