Removing and installing bypass flap with exhaust gas recirculation cooler: VW Touareg I (7L) (CBWA)
Removing and installing bypass flap with exhaust gas recirculation cooler — VW Touareg I (7L) (CBWA). Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Touareg I (7L, 2002–2010)
- Opens: coolant
- Replacement notes from the steps (read the conditions below): Renew all seals and O-rings. Renew hexagon socket head bolt of bracket for vacuum pipe on intake manifold of cylinder bank 2 by a hexagon bolt of the same size and strength rating.
🔧 Engine codes recorded for this source
📋 Procedure
- Drain coolant (see the separate procedure).
- Separate all necessary connectors of engine wiring harness above engine and lay harness to one side.
- Remove vacuum pipe (A) together with its brackets from intake manifold (arrows).
- Remove securing pins (arrows) for engine cover panel on both intake manifolds.
- Unscrew securing bolts (arrows), open clamps and pull off coolant hoses (1) and (2).
- Remove securing bolt for coolant pipe behind bypass flap (arrow).
- Pull off coolant hose (2) and lay coolant pipe (1) aside to rear.
- Unscrew respective two securing bolts (arrow) of connecting pipes for exhaust gas recirculation and remove intake connecting pipes together with intake manifold flap motor (A) and exhaust gas recirculation valve (B) from both intake manifolds.
- Unscrew securing bolts at connecting pipes for exhaust gas recirculation in area of cylinder head covers and remove their brackets (see the separate procedure).
- Completely loosen securing bolt (arrow) of bypass flap, slightly raise bypass flap at rear and remove bolt.
- Pull bypass flap upwards out of brackets.
- Guide out bypass flap together with exhaust gas recirculation pipes between engine bulkhead and intake manifolds.
- Renew all seals and O-rings.
- Reconnect all lines, hoses and connectors which were separated during removal.
- Renew hexagon socket head bolt of bracket for vacuum pipe on intake manifold of cylinder bank 2 by a hexagon bolt of the same size and strength rating.
- Filling cooling system (see the separate procedure).
Other VW procedures
- Bypass flap and exhaust gas recirculation radiator
- Bypass flap and exhaust gas recirculation radiator - engine codes AXR, BEW, BSW
- Checking exhaust gas recirculation cooler for leaks – VW CBAA
- Checking exhaust gas recirculation cooler for leaks, Golf, Golf Plus, Golf Cabriolet, Touran, Passat
- Checking exhaust gas recirculation cooler for leaks, Polo
- Removing and installing exhaust gas recirculation cooler
- Removing, installing and checking ceramic glow plugs – VW
- VAG 2.5 TDi/V10 TDi Injector R&I
- Removing and installing oil filter housing – VW Polo 6C
- Securing engine on engine and gearbox supportVAS 6095
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.