Checking exhaust gas recirculation cooler for leaks, Polo: VW Polo 6R (CAYA, CAYB, CAYC)
Checking exhaust gas recirculation cooler for leaks, Polo — VW Polo 6R (CAYA, CAYB, CAYC). 44 source steps. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Polo 6R (2009–2014)
- Opens: coolant
- Replacement notes from the steps (read the conditions below): The exhaust gas recirculation cooler has a leak. Renew exhaust gas recirculation cooler .
Don't miss
- When the engine is warm, the cooling system is under pressure.Hot steam/hot coolant can escape - risk of scalding.Cover filler cap on expansion tank with a cloth and open carefully to dissipate pressure. — Open clips (arrow).
- Fill coolant up to »min. mark«(arrow).
📋 Procedure
- Observe safety instructions (see the separate procedure).
- Observe rules for cleanliness (see the separate procedure).
- Remove engine cover (see the separate procedure).
- Remove noise insulation:
- Checking cooling system for leaks (see the separate procedure).
- Release and disconnect connector from pressure differential senderG 505(1).
- Remove bolt (3).
- Detach pressure differential senderG 505 with lines connected from retainer (2), and lay it towards rear.
- Use a finger to release the locking lug in (direction of arrow) from fuel pre-heater valve.
- Pull fuel pre-heater valve upwards out of coolant expansion tank guide.
- Open plug-in connectors (A) and (B) of fuel lines, and pull off fuel lines. Disconnect plug-in connectors Fuel supply - diesel engines 20. Disconnecting plug-in connectors.
- Remove bolts (arrows).
- Move fuel filter (1) clear to one side. Fuel hoses remain connected.
- Release and disconnect connector (1) from coolant expansion tank (1).
- Unscrew bolts (3).
- Place coolant expansion tank (1) in engine compartment.
- Clamp off coolant hose (1) on coolant circulation pump 2V178(3) with hose clamp up to 25 mm 3094.
- ⚠ When the engine is warm, the cooling system is under pressure. Hot steam/hot coolant can escape - risk of scalding. Cover filler cap on expansion tank with a cloth and open carefully to dissipate pressure. — Open clips (arrow).
- Pull coolant hose (1) off coolant pipe (2).
- Open coolant expansion tank.
- Hold the hose which has been pulled off into a suitable container.
- Carefully open hose clamp up to 25 mm 3094 and drain coolant until the coolant expansion tank is empty 19Cooling system/coolant; Draining and filling cooling system.
- Clamp off coolant hose (1) with hose clip up to 25 mm 3094.
- Connect adapter hose (2) to coolant pipe (1).
- Secure adapter hose (2) with a hose clip (arrow).
- Pull coolant expansion tank (1) upwards, and place it in the vehicle.
- Clamp off hose (2) with hose clamp up to 25 mm 3094.
- Open clip, and pull off water hose (3).
- Clamp off water hose (3) with a hose clamp up to 25 mm 3094.
- Open coolant expansion tank.
- Connect adapter hose (3) to the free connection on coolant expansion tank (1).
- Secure adapter hose (3) with a hose clip.
- Place coolant expansion tank (1) on a suitable place in engine compartment.
- Fill coolant up to »min. mark«(arrow).
- Screw adapter for cooling system tester V.A.G 1274/8 into coolant expansion tank.
- Clamp connector V.A.G 1274 B/1 into adapter for cooling system tester V.A.G 1274/8.
- Join connection piece V.A.G 1274 B/1 to cooling system tester V.A.G 1274 B using connecting hose supplied.
- Using hand pump on cooling system tester V.A.G 1274 B, build up a pressure of 1.5 bar.
- Check hose clamps up to 25 mm 3094 for firm seating, and retighten them if necessary.
- Repeat pressure loss test (see the separate procedure).
- The exhaust gas recirculation cooler has a leak. Renew exhaust gas recirculation cooler (see the separate procedure).
- Install all water hoses, and secure them with hose clips (see the separate procedure).
- Replenish coolant (see the separate procedure).
- ⚠ Risk of scalding! Before disconnecting cooling system tester V.A.G 1274 B from the connecting hose or connector V.A.G 1274 B/1, it is essential that the pressure is relieved. To do this, press pressure relief valve on cooling system tester V.A.G 1274 B until pressure gauge displays value of »0«. — Install noise insulation:
📐 12 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other VW procedures
- Checking exhaust gas recirculation cooler for leaks – VW CBAA
- Checking exhaust gas recirculation cooler for leaks, Golf, Golf Plus, Golf Cabriolet, Touran, Passat
- Removing and installing exhaust gas recirculation cooler, Polo
- Removing and installing bypass flap with exhaust gas recirculation cooler
- Removing and installing exhaust gas recirculation cooler
- Removing and installing exhaust gas recirculation cooler, “biturbo engine”
- Removing and installing right coolant pipe, Golf, Golf Plus, Golf Cabriolet, Passat, Touran
- Removing and installing charge air pipe »hot« side
- Checking voltage supply of the fuel pump for delivery rate G6 (CAYA, CAYB, CAYC)
- Removing and installing radiator cowl with radiator fan V7, Polo
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.