Removing and installing assembly mountings: VW Polo 6R (CAYA, CAYB, CAYC, CBZB)
Step-by-step removing and installing assembly mountings for the VW Polo 6R: 17 steps. What to remove, in what order, and what to check after.
Workshop procedure for VW — the exact step sequence and torque figures, straight from real workshop data.
🧭 Before you start
Fits: VW Polo 6R (2009–2014)
- Renewed: engine mounting
Don't miss
- Disregard (item 1).
- Renew bolts tightened through an additional specified angle.
- Risk of accidents.It is only permissible to undo nut (1) to renew engine mounting. — Place assembly mounting on longitudinal member.
📐 66 workshop diagrams for CAYA
Real factory drawings for this job — timing marks, bolt locations and routing. Locked in the free view.
📋 Procedure
- Remove engine cover (arrows).
- Disconnect electrical connector (3).
- Unscrew bolt (2), place pressure differential senderG 505 to one side. [Note: Disregard (item 1).]
- Release fastener (arrow) and pull fuel pre-heater valve out of guide on coolant expansion tank.
- Remove bolts (arrows).
- Disconnect electrical connector (1) for coolant shortage indicator switch F66 and push coolant expansion tank to side.
- Set up support bracket10 - 222 A with necessary adapters and support engine in installation position .
- Attach hook of spindle10 - 222 A /10 to engine lifting eye.
- Pretension spindle slightly.
- Unscrew nut (1) and expose earth line
- Remove bolts (arrows).
- Unscrew bolts (arrows) and remove engine mounting together with engine bracket. [Note: Renew bolts tightened through an additional specified angle.]
- ⚠ Risk of accidents.It is only permissible to undo nut (1) to renew engine mounting. — Place assembly mounting on longitudinal member.
- First screw in bolts (arrows) as far as stop by hand.
- Tighten bolts. [Note: Disregard (item 1).]
- First screw in bolts (arrows) for support arm of engine mounting as far as stop by hand.
- Tighten bolts. [Note: Disregard (item 1).]
Ask TorqFix about your VW CAYA — it answers with the exact sequence for that engine and the workshop drawing for each step. First question is free after a 20-second sign-up, no card.
Ask about your VW CAYA — free → or sign up free to see the drawingsOther VW procedures
- Removing and installing exhaust gas recirculation cooler, Golf, Golf Plus, Golf Cabriolet, Touran, Passat
- Removing and installing pistons
- Removing and installing radiator, Polo – VW 1.6 TDI
- Removing and installing fuel pressure regulating valveN 276
- Removing and installing engine control unit J623 with protective housing, Polo
- Removing engine · 41 torque figures
- Removing and installing camshaft – VW Golf Cabriolet · 47 torque figures
- Adjusting valve timing – VW Passat B5 · 83 torque figures
- Removing and installing camshafts – VW Passat B6 · 39 torque figures
- Removing and installing coolant pump · 53 torque figures
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
The figures on this page come from manufacturer workshop documentation and are shown as they are. The page is assembled automatically from that data — it is not written by an AI. The AI works in the chat, where it answers for your specific car. It writes nothing here.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix →Workshop data on this page last updated 20 Sep 2026.