TorqFix

Removing and installing air conditioner compressor, Golf blue e-motion: VW Golf VI (5K) / Golf Cabriolet (517)

Removing and installing air conditioner compressor, Golf blue e-motion — VW Golf VI (5K) / Golf… Read available instructions and vehicle application notes.

11 steps 2 torque figures

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: VW Golf VI (5K, 2008–2013), VW Golf Cabriolet (517, 2011–2016)

Don't miss

  • Do not turn connector. Danger of destruction.

🔩 Torque settings

Values can differ between engine variants — check the code stamped on your block.

TorqueFastener / step
3 Nm (2.2 lb-ft)Unscrew bolts (5) and (8) (20 ± 3 Nm) and pull off refrigerant lines (4) and (9) from electric air conditioner compressor V470(6).
3 Nm (2.2 lb-ft)Unscrew bolts (7) (25 ± 3 Nm), place potential equalisation wiring (3) to one side and remove electric air conditioner compressor V470(6). [Note: The bolting points of the air conditioner compressor and the engine must be checked prior to installation.The contact surfaces must be clean, rust- and grease-free.Otherwise, repair contact surfaces using contact surface cleaning setVAS 6410Electrical system; General information97Cleaning contact surfaces.The procedure required to clear the air conditioner compressor of refrigerant oil is described in the workshop manual Air conditioning systems with refrigerant R134a00Clearing refrigerant circuit of contaminants; Purging (cleaning) refrigerant circuit with refrigerant R134a.Refrigerant shutoff valve for air conditioning system N541 and refrigerant shutoff valve for heat exchanger of high voltage battery N542 must be open for filling and extraction of refrigerant.When filling and extracting refrigerant, a voltage of 12V must be applied to the shutoff valves.]

ℹ️ Always cross-check the exact figure against your vehicle's factory manual before final tightening — a wrong torque can damage the engine. These values are extracted from workshop data and may not cover every variant or revision.

📋 Procedure

  1. Observe safety precautions when working on the high-voltage system Safety precautions when working on high-voltage system.
  2. Observe safety precautions Safety precautions when working on air conditioning systems.
  3. Observe safety precautions when working in the vicinity of high-voltage components Safety precautions when working in vicinity of high-voltage components.
  4. Comply with notes Working on refrigerant circuit.
  5. Observe the risk rating of the high-voltage system Electric drive 00. Risk category of the high-voltage system.
  1. Now de-energise the high-voltage system Electric drive 93. De-energising the high-voltage system.
  2. Remove nose insulation General body repairs, exterior 66. Noise insulation; Assembly overview - noise insulation.
  3. Separate high voltage cable (2) from electric air conditioner compressor V470(6). [Note: Do not turn connector. Danger of destruction.]
  1. Separate connector (1) from electric air conditioner compressor V470(6).
  1. Unscrew bolts (5) and (8) (20 ± 3 Nm) and pull off refrigerant lines (4) and (9) from electric air conditioner compressor V470(6). — 3 Nm (2.2 lb-ft)
  2. Unscrew bolts (7) (25 ± 3 Nm), place potential equalisation wiring (3) to one side and remove electric air conditioner compressor V470(6). [Note: The bolting points of the air conditioner compressor and the engine must be checked prior to installation. The contact surfaces must be clean, rust- and grease-free. Otherwise, repair contact surfaces using contact surface cleaning set VAS 6410Electrical system; General information 97. Cleaning contact surfaces. The procedure required to clear the air conditioner compressor of refrigerant oil is described in the workshop manual Air conditioning systems with refrigerant R134a 00. Clearing refrigerant circuit of contaminants; Purging (cleaning) refrigerant circuit with refrigerant R134a.Refrigerant shutoff valve for air conditioning system N541 and refrigerant shutoff valve for heat exchanger of high voltage battery N542 must be open for filling and extraction of refrigerant. When filling and extracting refrigerant, a voltage of 12V must be applied to the shutoff valves.] — 3 Nm (2.2 lb-ft)

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.